Docket No. 50-387 LICENSEE:
Pennsylvania Power
& Light Company (PP8L)
FACILITY:
Susquehanna Steam Electric Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING HELD 1<1TH PPIIIL AT BETHESDA, MARYLAND, ON APRIL 18, 1984 REGARDING PROPOSED MAIN STEAL LINE - HIGH RADIATION SETPOINT TECHNICAL SPECIFICATION CHANGE REQUEST On April 18, 1984, representatives of Pennsylvania Power 5 Light Company met with the NRC staff to discuss the proposed change to the Main Steam Line-High Radiation setpoint of the Susquehanna Unit 1 Technical Specifications.
A list of attendees is provided in Attachment 1.
The current Main Steam Line - High Radiation setpoint is i3 times normal background.
PPSL proposed an amendment to the Susquehanna Unit 1 Operating License to raise this setpoint to <7 times normal background to avoid main steam isolation valve closures and resultant reactor trips when placing condensate demineralizers into service at power.
The slides presented by PP8L to the NRC are provided in Attachment 2.
Based on the information presented, the NRC staff will further evaluate the proposed change.
R. Perch, Project Manager Licensing Branch No.
2 Division of Licensing Attachments As stated.
DL:LBO RPerch:bdm 4/so/84 DL:LB//2/BC ASch c
r Distribution:
LB2 Reading OELD Attorney A. Schwencer E. Hylton NRC PDR Local PDR PRC System R. Perch 840Si60283 840430 PDR ADOCK 05000387 PDR
ATTACHMENT 1 List of Attendees Ni I Li ~RS rs 1
1984 NRC F. Anderson R. Lobel R. Perch PPSL W. Barberich J. Bartos C. Coddington D. Matchick G. Miller D. Morgan
't
<gR AK0II (4
~O
~o
+~ '0 0~*y4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 APR 3 0 jS84 Docket No. 50-387 LICENSEE:
Pennsylvania Power
& Light Company (PP&L)
FACILITY:
Susquehanna Steam Electric Station, Unit 1
SUBJECT:
SUMMARY
OF MEETING HELD WITH PP&L AT BETHESDA, MARYLAND, ON APRIL 18, 1984 REGARDING PROPOSED MAIN STEAL LINE - HIGH RADIATION SETPOINT TECHNICAL SPECIFICATION CHANGE RE(UEST On April 18, 1984," representatives of Pennsylvania Power
& Light Company met with the NRC staff to discuss the proposed change to the Main Steam Line-High Radiation setpoint of the Susquehanna Unit 1 Technical Specifications.
A list of attendees is provided in Attachment 1.
The current Main Steam Line - High Radiation setpoint is <3 times normal background.
PP&L proposed an amendment to the Susquehanna Unit 1 Operating License to raise this setpoint to ~7 times normal background to avoid main steam isolation valve closurqs and resultant reactor trips when placing condensate demineralizers into service at power.
The slides presented by PP&L to the NRC are provided in Attachement 2.
Based on the information presented,'he NRC staff will further evaluate the proposed change.
I I
R. Perch, Project Manager Licensing Branch No.
2 Division of Licensing A'ttachments As stated..
Susquehanna Mr. Norman M. Curtis Vice President Engineering and Construction Pennsylvania Power h Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 ccs:
Jay Silberg, Esquire Shaw, Pittman, Potts 8 Trowbridge 1800 M Street, N.
M.
Washington, D.
C. 20036 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 6 Light Company North Ninth Street Allentown, Pennsylvania 18101 Mr. Milliam E. Barberich Nuclear Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Mr. G., Rhodes Resident Inspector P. 0.
Box 52 Shickshinny, Pennsylvania 18655 G 'raid R. Schultz, Esquire Susquehanna Environmental Advocates P. 0.
Box 1560 Milkes-Barre, Pennsylvania 18703 Mr. E. B. Poser Project Engineer Bechtel Power Corporation P. 0.
Box 3965, San Francisco, California 941.19 Ms. Colleen Marsh P. 0.
Box 538A, RO P4 Mountain Top, Pennsylvania 18707 Mr. Thomas J. Halligan Correspondent The Citizens Against Nuclear Dangers P. 0.
Box 5
- Scranton, Pennsyl vani a 18501 Mr. N. D. Mei ss Project Manager Mail Code 391 General Electric Company 175 Curtner Avenue San J ose, Ca 1 i forni a 95125 Robert M. Adler, Esquire Office 'of Attorney General 505 Executive House P. 0.
Box 2357 Harrisburg, Pennsylvania 17120 Dr. Judith H. Johnsrud Co-Director Environmental Coalition. on Nuclear Power 433 Orlando Avenue State College, Pennsylvania 16801 Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonweal th of Pennsyl vania P. 0.
Box 2063 Harrisburg, Pennsylvania 17120
ATTACHMENT 1 List of Attendees Mi S
Li ~S ri 1, 8
NRC F. Anderson R.
Lobe1 R. Perch l<.
J.
C.
D.
G.
D.
PPSL Barberich Bartos Coddington Matchick Miller Morgan
PO i
e INTRODUCTION
~
DESCRIPT IOtt OF: ROBLEN I
PLANNED ACTION e
BASIS FOR SETPOINT CHANGE
goer.eH CWDEnfSB 1S (FEEVCuH Vs+
OFEzppvlgc H~~ Eeoa vio~ Esix~s I
A'tR, Or'~amies 6
Vo Cumin/ Hiw~s/Vi~) ce sN'nerd s pzz Pu]s8aRS Cg<r ~uw Swwuor<r Cz x 8pm~wou~a) zssuzrs zu /YSIVtso~svio~s uuzruc se ry7E, ap 7SE 7Ap74slzNS o~Mre4
0 0
/XSAM g)mll=I~lo~ Ho>i7og S~7WOiA r C II+WOa-2 uau'SVRV Eu'+RIZWeZ
~
CBRIT'W<iC 2 wmRuZlo~
Z E b'8-Yg Yf, vlzY, Hsz.Z/7 A~~~
jgjl&IFREMP&
o 5Z&> WXIWWIEn~. Nial~ 2 SZ 2Soz+vmA~ 4'/OOS W~~ -I'~+>
/ jgJR FROW h&PROPWSZY I=IIL&O 8 Mwovww POI Islf~R C'Z'~D 5 Ee'sIA FiW~ l<<~~ I +o~
RAHU sMZd'z ~AcP4 guT~//UL Pd4 a+<R W'earle CRu'D FEW! FW RCCc) 7RWNSIFa7 7 Hle&'&'l-/$&g SQS 7E)YJ ZWS~ NSZ PZOIPIWo~ &i<e
~J~Z/zg I
slosh commW'wu~z-Csuo gaz~sw
~+clp77 +04/ Eb'MR ~&MA'~F/As )w 5~MP~m
o 7')C~L Eb H/V7+
IVSL P8aiev'zorY +<~<++~ <<>+~
Ws'~&u~w Pu'w "8'"
Y~zsez. iu S'~mud~
C~l>uEatot~
jPeciwe'z CPMBCCC%%ulb'/ 7 p Zkv'S IVSl R~~imvou d~~~~~
4~
gas Vu~c~w 7mmw Oz
~l~
J lecoaz~
~/
cp z
+u.f4~ ~
-s l zs X Y
I
. -o.s g
-Jc H d'.
Hwswcwsm Crr7n)
Crn' os S'rnwz. z c z>uu ~
A co~~~cr)miry
~
0 PA'Drrp7roA Wc&iFcr Sa rr or>7 C"rr~rtrc~
o 7 f'/cA'6 +L~k'7
- /trr'5 g gpDipvic> Cp/KEScr-rrH
!c" Yo Noma~, /2~4'~el
."p" PEM~g vg S&gu7cE:
Err/~/sz-ozpo)
FAom 7izusra~w gD& 7uaalD/~Y Zuais/Dr >/
R ie'~aoucvur ~t' Wop
/V5Z Zpaie7roa gEppc7's'oz F77'&
Ewer>r.ra Wryui rvr~
)N b&s saZ gaswo~sw
~ave sr ~
Jo
- o. 3 m/ 0~5 7.l ~g,s JR. ~SO~<4 8-/X 5'cs~rv, o~rm urrHq ~~a scraper'c ohio W 8cnmuc*~lQ ounA s c~Aon res~ ~ s</QQ
/ > +~<<o4~ or o-Jg sd/4r -or/
g~s/n C"~~~sr///c-
~&wcWRso/t, ~o/t//7oR/k'8 C o&Racm~u Gamous Paoaz~rzry 8m~uwm M~~ g~zg~
+~-Zu'<<~s'W H<oM c oa zzozz~a Pwoaos~s Z<vacr c~w.~~ax rYoc W~a~ Wan/
<-~~ Mz~~~ 87zor-/~a~io~~
Pp/ /5//ER Zd>lpl77&N7 2ADzp&c.rto~
~d&///c+w/o~s wo W4/5///=-~
- 227/Ãsoelz ZES/4 d&WEE8
~WOW/O~A< neo~
D~e/ p-//o~~c. m)a 2 5dd + //04 YFFZ//'SS J &$78/ L.E'C>
6 H Ties /RL/~~M7A //c7rLJ jPEs/// ~H'mp/ /&6-Eocr'// /77MM7
&Lisasz Eewz uwnz Samn~z Zi~a Awcvcc.a Vw/um Varri~c-2mwzumw>/'&wwz.u~z Pa~m Sw~~m HAow C ow-rEo c PMMF Mao/ wmro~
W~s'/A WAR/
PHgEqC) 5+/D VWWJ/~ PAGCc3 pc7NJWB7C Wmc mm Mmmm~ s Sr~//.~ X~e~s~
A Nl
~
~
HAD/8'/o~/Vow/7.
S~~/ ~/er c//snrcz C on/ca u's/orna CCRC'a'C7/um
&Ca/On/S ~/Z.Z W~Du~
H/'&4uEb~Y gP s/rWaZ 8P7-u A.< 4'a7 Wz/Hrga~z
+ PP<t87OR ERZ58
~ Miffy/l/otFP~MW MW/LMWM
~&ih'CC/HYK
. A/I7HW'7 PP//
///'CE ~F7SBP SHYPo///7, MX'Wm&JWMc~
/'SSL )PYJSA>
4'4 ER 9Z 8A'7 4, /'2~7/HE N
R NONITOR FOR GROSS RELEASE OF FISSIOt)
PRODUCTS SETPOIiXT HIGH ENOUGH TO AVOID SPURIOUS TRIPS SETPOINT LOW ENOUGH TO DETECT GROSS FISSION PRODUCT RELEASE TRIP RESULTS I:.'I:
NSIV CLOSURE REACTOR SCRAN I
~
PROVIPES DIVERSITY TO OTHER TRIP, FUNCTIONS
S RN SETPOINT G
PROPOSE CHANGE FRON 3X TO 7X BACKGROUND NO CREDIT FOR,"lSLRN TRIP IN ACCIDENT ANALYSIS 7X'HIGH ENOUGH TO AVOID SPURIOUS TRIPS 7X LOL'J ENOUGH TO DETECT GROSS RELEASE OF FISSION PRODUCTS
TABLE 1
O,f-Site Doses NEDO-10174 '(Flow Blockaae Event Exclusion Area (2 hr dose)
'ow Population Zone (30 day dose)
Inhalation Rem
.5 Whole Bod Rem 0.1
- 0. 03 Inhalation Rem NEDO-10174 Ad usted fo.
/ 's Ilh 1
B R
Exclusion Area (2 hr)
Low Population Zone (30 day)
.47
.062
.085
.0045 Control Rod Droo Accident '(FSAR 15.4-15)
Exclusion Ar'ea (2 hr)
Low Population Zone (30 day)
Inha 1 ation Rem 1.07
.153 iihole Bod Rem
.136
. 0062 Loss of Coolant Accident (D sign Basis)
(FSAR Table 15.6-18 Exclusion Area (2 hr)
~ Low Population. Zone (30 day)
Inhalation Rem 154 33.4 hinole Bod Rem 5.12
.889
GROSS RELEASE OF FISSIOif PRODUCTS PRO IPT RELEASE OF FI'SIOil PRODUCTS CLPD FAILURE (GAP RELEASE)
ASSUNED EQUIVALE IT GAP IflVE!'STORY REQUIRED TO TRIP AT:
7~
SETPO I:;1T ~
40 RODS 3X SET, OIitT ~
15 RODS
~ ~
~
1
~