~gag j Docket Nos.

50-387, I

and 50-3882 Mr. Norman

'H. Curtis Yice President Enrr1neer>>ng and Constr oct1on We~lear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, PA 18101 Dear Mr. Curtis;

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION:

INFORMATION -

REMOTE SHUTDOMN PANEL..

DISTRIBUTION:

J.

Mauck RHart T. Speis LB82Fi1 e bcc:

DEisenhut/RPurpl e

RTedesco ASchwencer JStefano EHylton

Cutchin, OELD OI 8>>E Region 1

Resident Inspector SHanauer RMattson HThompson RYollmer REQUEST FOR ADDITIONAL field, MPA TERA NSIC NRC PDR Local PDR ACRS (.16)

The Instrumentation and Control Systems Branch is in need of design information regarding the Susquehanna Remote Shutdown Panelr:beg!gdnd',,

the response furnished by PPSC in its transmittal of December 8, 1981*.

Enclasure (A) contains the questions which need to be answered.

This is an open item which must be resolved, and it is urged that a prompt response be) furni,shed.

Sincerely,

Enclosure:

As stated A. Sctn(encer, Chief Licensing Branch No.

2 Division of Licessing

@~FnfEO FEB221982~

'~~F~e

'g gfggR gg~

<>'rr~

~ 'DR -'ADOCK',05000387

-, >',,'I. ";-,;;

"8*: """'<'o"">>n".ipDR'-r'""J"'

~ ~ ~ ~ ~ ~ ~ a ~ ~

~ a a %1 ~ 0 ~I~ a ~

II

~ ~ ~ a ~ a ~ ~ ~ ~ ~ 0

~ a ~ a ~ a

~ 0 ~ a

\\

USQPOr,19S1~&960

~~

"Pi

.t I

I

~

l DV)' '~

'Mr. Norman W. Curtis Vice President Engineering and Construction Pennsylvania Power 8 Light Company Al 1 entown, Pennsyl vania 18101 ccs:

Jay Silberg, Esquire Shaw, Pittman, Potts 5 Trowbridge 1800 M Street, N.

W.

Washington, D. C. 20036 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 8 Light Canpany 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Mr. Williao E. Barberich Nuclear Licensing Group Supervisor Pennsylvania Power 8 Light Company 2 North Ninth Street Allentown, Pennsyl vani a 18101 Mr. G.

Rhodes Resident Inspector P. 0.

Box 52 Shickshinny, Pennsylvania 18655 Gerald R. Schultz, Esquire Susquehanna Environmental Advocates P. 0.

Box 1560 Wilkes-Barre, Pennsylvania 18703 Mr. E. B. Poser Project Engineer Bechtel Power Cor por ation P. 0.

Box 3965 San Francisco, California 94119 Dr. Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Po~r 433 Orlando Avenue State College, Pennsylvania 16801 Mr.

Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.

Box 2063 Harrisbur g, Pennsylvania 17120 Ms. Colleen Marsh P. 0.

Box 538A, RD 84 Mountain Top, Pennsylvania 18707 Mr. Thomas J. Halligan Corr espondent The Citizens Against Nuclear Dangers P. 0.

Box 5

Scranton, Pennsylvania 18501 Mr. J.

W. Millard Project Manager Mail Code 395 General Electric Company 175 Curtner Avenue San Jose, California 95125 Robert W. Adler, Esquire Office of Attorney General 505 Executive House P. 0.

Box 2357 Harrisburg, Pennsylvania 17120

~

ENCLOSURE A The following questions are based on the applicant's response dated December 8, 1981 to the staff position on remote shutdown that was transmitted to the applicant on August 17, 1981.

(1)

The staff is questioning the use of the ADS valve controls located in the upper and lower relay rooms since they share a

common HVAC system with the control structure.

We request

" additional information concerning procedures 'for access to these areas during a control room evacuation.

These pro-cedures should include a method of isolating either of these relay rooms from the control structure HYAC system or of isolating the control room from the HYAC system and a

discussion of the smoke detectors in. the relay rooms.

(2)

The applicant's response to our position 'was incomplete.re-garding instrument indicators needed for hot and cold shutdown.

We require. that a single failure analysis be provided for these indicators along with the locations for the alternate indications.

(3)

The Redundant Path shown in Attachment A tabulates the systems or functions required to achieve a redundant or diverse method of shutdown where the controls and indicators are not necessarily on the Remote Shutdown Panel.

However, we require that locations be shown for the redundant systems or functions and these locations must be reasonably accessible from the Remote Shutdown Panel.

(4)

Provide an analysis for using the Reactor Core Isolation Cooling (RCIC)

System to reduce the reactor pressure.

This analysis should be per-formed with the use of the RCIC system as a path for reducing reactor pressure during remote shutdown assuming SRVs and the ADS to be un-I'vailable, and should include verification that the RCIC turbine steam flow is sufficient to reduce reactor pressure to achieve cold shutdown.

The time to reach cold shutdown should also be provided.