ML17139A521
| ML17139A521 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 01/07/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17139A522 | List: |
| References | |
| NUDOCS 8201250364 | |
| Download: ML17139A521 (4) | |
See also: IR 05000387/1981026
Text
N V
1982
Docket/License:
50=387/CPPR-101,
50-388/CPPR-102
Power and Light Company
ATTN:
Mr..Norman W. Curtis
Vice President
Engineering
and Construction - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
This refers to the routine safety inspection
conducted
by Mr . L. Narrow of $Pis
office on December 1,
1981
and December 7-11,
1981 at Allento>m, Pennsylvania
and
at the Susquehanna
Steam Electric Station, Units
1
and 2, Berwick, Pennsylvania.
That inspection consisted of selective examinations of procedures
and records,
interviews,
and observation of activities.
Findings were discussed
by Mr. Narrow
with Mr. Beckley and other members of your staff at the end of the inspection.
An apparent Violation of NRC requirements is set forth in Appendix A and categorized
by level
as described in Federal
Register Notice 45FR66754 dated
October
7, 1980.
A reply is required; it should be prepared
tn accordance
with the instructions in
Appendix A; it is not subject to the clearance
procedures
of the Office of Manage-
~
ment and Budget under the Paperwork Reduction Act of 1980,
PL 96-511.
In accordance
with 10 CFR 2.790(a), this 1'etter
and enclosures will be made public
','nless
you notify this office by telephone within ten (10) days of the date of this(
letter and submit written application to withhold information contained therein with-
in 30 days of the date of this letter.
Such application must be consistent with 10 CFR 2.790(b)(1).
Your cooperation is appreciated.
Sincerely,
~5'>8<~Ql Slgn8
3y.
Richard
W. Staros
cki
Director
Division of Resident
a d Prospect
Inspection
Enclosures:
l.
Appendix A, Notice of Violation
2.
Combined Office of Inspection
and Enforcement Inspection
Report 50-387/81-26;
50>>388/81-13
8>0~~50~~
0S000S87
g 8PQi07
ppp
<pQCK
>pp
8
OFPICEP
RI:DRP~
NaI row/meo
oavag
1/6/81
'I:DRP
McCabe
~(7
~ ~ ~ ~ ~ ~ ~ ~ 8 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318 80/80) NRCM 0240
RI:
St
o
ecki
RI: DR
Ke
ig
~ ~ ~ ~ ~
~
~ ~ ~
~
7 fZ
7+L-
OFFICIAL RECORD COPY
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~
- USGFO: 19~29-824
IJ
e
a
W
>g
Power
5 Light Company
,JAv v
1ggg
cc w/encls:
A.
R. Sabol,
Manager,
Nuclea'r guality Assurance
W.
E. Barberich,
Licensing Engineer
H.
W. Keiser, Superintendent
of Plant
Public Document
Room (PDR)
Local Public Document
Room ( LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket
Room (with concurrences)
Jessica
H. Laverty,
ELD
L. Narrow, Reactor
Inspector
Chief, Operational
Support Section
(w/o encls)
OFFICIAL RECORD
COPY
'E
a ~i<)t
r
~fhg>Q<
QV"I
II
A A
~
? i~....
'i<
yi
Vw