ML17139A490
| ML17139A490 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/27/1981 |
| From: | Keimig R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17139A491 | List: |
| References | |
| NUDOCS 8112140116 | |
| Download: ML17139A490 (4) | |
See also: IR 05000387/1981025
Text
g{g 2 7 3983
Docket No. 50-387
Power and Light Company
ATTN:
Nr. Norman M. Curtis
Vice President
Engineering
and Construction - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
0
Subject:
Inspection 50-387/81-25
, This refers to the routine inspection conducted
by t1r. G. Rhoads of this office on
October 20 - November 18,
1981 at the Susquehanna
Steam Electric Station, Unit 1,
Salem Township,
Pennsylvania of activities authorized
by NRC License
No. CPPR-101
and to the discussions of our findings held by t{ . Rhoads ~iith Hr. D. Thompson of
your staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the Office of Inspection
and
Enforcement Inspection Report which is enclosed with this letter.
lecithin these
areas,
the. inspection consisted of selective examinations of procedures
and repre-
sentative records,
interviews with personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one 'of your activities was
not conducted in full compliance with NRC requirements,
as set forth in the Notice
of Violation, enclosed
herewith as Appendix A.
This item of noncompliance
has
been
categorized
into the levels described in the Federal
Register Notice (45 FR 66754)
dated October 7, 1980.
You are required to respond to this letter and in preparing
your response,
you should follow the instructions
$ n Appendix A.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures will
be placed in the
NRC Public Document
Room unless
you notify this office, by tele-
phone, within ten days of the date of this letter and submit written application
to withhold information contained therein within thirty days 'of the date of this
letter.
Such application must be consistent with the requirements 4f 2.790(b)(1).
Your cooperation with us in this matter is appreciated,
Sincerely,
P>>Sinai Si~oa y~
~
~
R.
R. Keimig, Chief
Projects
Branch No. 2, Division
of'esident
and Project Inspection
RI:DRPI
0-
Rho<ds/meo
11/2$/81
RI: DRPI
NcCybe
RI:
Ke'mia
//-
gf
8ii2i40iih 8iii27
ADOCK 05000387
8
'P(DR
.
AFFICIAL'ECORD COPY
40
col
~4 g
C.
r
~
~ ~
14
< n
I
'4
1
I ~ jn
't
I
n '
ln
L
I
Er
I
I
tl
'I
Il
4
I
7
17
~-
Il
I
l
r
4
I
, "p
I
4
~ '). ~ < >1
I
I
I
E
II
W
4
77
W
~ff)M$QQQ Egg J.QL+0
7
'I
'I
li
tl
. ~ '
R
~I g)
7
I I
4
T
E
~ EEW r
I
~
- y
~
I
p
(
t
I
'
Power and Light Company
2
(
Enclosures:
1.
Appendix A, 'Notice of Viol,at<on-
2.
Office of Inspection
and Enforcement Inspection
Report 50-387/81-25
cc w/encls:
A. R. Sabol,
Manager,
Nuclear Qual-ity Assurance:
"
M.'. Barberich, Licensing Eng)neer
H.
M. Keiser,'uperintendent
of PTant
Public Document
Room
(PDR)
~ Local Public Document
Room
(LPDR)
-Nuclear Safety Information Center
(NSIC)
-" NRC Resident Inspector
Commonwealth of, Pennsylvania,
bcc w/enc1s:
Region I'Docket Room (with concurrences)
Jessica
H, Laverty,
ELD
L, Narrow, Reactor Inspector
Jim Higgins, Resident
Inspector
Chief, Operational .Sopport Section
(9/o encls)
Y Rv iS81
e
l
I
C- t
OFFICIAL RECORD
COPY
rSB v2 v
'l
t~
~
4
I
I
J'
J
I
Ik
I
Ig
I
4
k
I
If
f
I
1
I
1
II
I
If
I
I
, ~
1
'H
f
II,
J
h
VIj
I
Jgjt
-
I
'I
k
7
\\I
I,
k
I
I 'L
I
jk ~..
II',I I
e
I
U
J
I
~
J
P>>
1
P