ML17139A460

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-387/81-19 on 810916-1019 & Notice of Violation
ML17139A460
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/23/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139A461 List:
References
NUDOCS 8111130670
Download: ML17139A460 (4)


See also: IR 05000387/1981019

Text

Docket No. 50-387

Pennsylvania

Power

8 Light Company,

ATTN:

Hr. Norman H. Curtis

Yice President

Engineering

and Construction - Nuclear

2 North Ninth Street

Allentown, Pennsyl vani a

18101

Gentlemen:

c-

efff h -:;

NOVL2 1981~

VeSe YJC1EAR REGULARS% '

f"

, -t1 (t

COANISS le

Sub]ect:

Inspection

No. 50-387/81-19

This refers to the routine inspection conducted

by Hr, G. Rhoads of this

office on September

16 - October 29,

1981 of activities authorized

by NRC License

No.

CPPR-101 at Susquehanna

Steam Electric Station

Unit,1, Salem To~unship,

Pennsylvania

and to the discussions of our findings held by Hr. Rhoads with

Hr. H. M. Keiser at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

lecithin

these

areas,

the inspection consisted of selective examinations of procedures

and representative, records,

interviews with personnel,

and observations

by the

inspector.

Based

on the results of this inspection, it appears that one of .your activities

was not conducted in full compliance with NRC requirements,

as set forth in

the Notice of Violation, enclosed

herewith as Appendix A.

This item of non-

compliance

has

been categorized into the levels described in the Federal

Register

Notice (45 FR 66754) dated October 7, 1980.

You are required to respond to this

letter

and in preparing your response,

you should follow the instructions in

Appendix A.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of this

letter and the enclosed

inspection report will be placed in the NRC's

Public

Document Room., If this report contains

any information that you (or

our con-

tractors) believe to be exempt from disclosure

under

10 CFR 9.5 (a)(4 , it is

necessary

that you (a) notify this office by telephone within ten

10

days from

the date of this letter of your intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter

a written application to

this office to withhold such information.

Consistent with Section 2.790 (b) (1),

any such application must be accompanied

by an affidavit executed

by the owner

of the information which identifies the document or part sought to be withheld,

and which contains

a full statement .of the reasons

on the basis which it is

claimed that the information should

be withheld from public disclosure.

This

RI: DRPI

RI: DRPI

Rho ada geo

.

No%ac

10/2~1'/81

Siiii30670 aii023

PDR

ADGCK 05000387

8

PDR

RI:

PI

Ke

fh >

OFF ICIAI

RFCOPA

COPY

4IJ

4

4

I

~ t

4

4

~ ~ EH

4

I

I ~

4

IVIIV

4)

II

)

I

J

,I

I

i

lt

4

I

I

I

~

II

gt

'IE 4

I

I

I

'4

I

.4

4

4

I

-

'I

4,

'E

J

4 I

I

~

~

I

J

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790'b)(4).

The information sought to be with-

held shall

be incorporated

as far as possib'te into a separate

part of the

affidavit. If we do not hear from you in this regard within the specified

periods noted above,

the report Will be placed in the Public Document

Room.

The telephone notification of your intent to request withholding, or any, request

for an extension of the

10 days period which you believe necessary,

should be

made to the Supervisor, Files, tkail and Records,

USNRC Region I, at (215) 337-

5223.

Should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Aigkwn1~ Sfggeggp

o

. R. Keimig, Ch f

Projects

Branch P2, Division of

Resident

and Project- Inspection

~

~

~

Enclosures:

l.

Appendix A, Notice of Violation

2.

Office of Inspection

and Enforcement Inspection

Report Number

50-387/81-19

cc w/encls:

A. R. Sabol,

t1anager,

Nuclear qua'lity Assurance

=

ll. E. Barberich, Licensing Engineer

H. H. Keiser, Superintendent of Plant

Public Document

Room (PDR)

'

" Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident Inspection

Commonwealth of Pennsylvania

bcc w/encls:

Region I Docket

Room (with concurrences)

Jessica

H. Laverty,

ELD

L. Narrow, Reactor Inspector

Jim Higgins, Resident Inspector

Chief, Operational

Support Section (w/o.encls)

I

OFFICIAL RECORD

COPY

0

0

(

~

~

T

/A!~<<

f~ g

Qte'I

'" ~

'5l, 1

l('l

~-

4

II

II

I*

r

b

<<

'I

I

I

bb

t

I

I<<4(

4

r

I

I

<<

~I

p

I