Forwards IE Insp Repts 50-387/81-08 & 50-388/81-04 on 810323-27 & 0330-0403 & Notice of Violation
ML17139A229
Person / Time
Site: Susquehanna  
Issue date: 05/29/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17139A230 List:
References
NUDOCS 8106160512
Download: ML17139A229 (4)


See also: IR 05000387/1981008

Text

o >r

~

sgm

rSr

0

H

os

0

++*++

Docket Nos.

50-387

50-388

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA19406

MAY 29

j981

Pennsylvania

Power

and Light Company

Fl fQ)i;gag

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

'Eg/(p>

o,g

~ ~ 198f~

8

~le

Gentlemen:

Subject:

Combined I'nspection

50-387/81-08

and 50-388/81-04

This refers to the special

Construction

Assessment

Team inspection

conducted

by a team

headed

by Mr. L. Tripp of this office on March 23-27,

1981-and

March

30

April 3,

1981 at the Susquehanna

Steam Electric Station,

Units

1 and 2,

Berwick, Pennsylvania

of activities authorized

by

NRC License

Nos.

CPPR-101

and

CPPR-102

and to discussions

of our findings held by Mr. Tripp with Mr. B.

'Kenyon and other members of the

PP&L and Bechtel staffs at the conclusion of

the inspection.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement

Inspection

Report which is enclosed with this letter. Within

these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations'y

the

inspector.

Based

on the results of this inspection, it appears

that. certain of your

activities were not conducted

in full compliance with NRC requirements,

as set

for th in the Notice of Violation, enclosed

herewith

as Appendix A.

These

items of noncompliance

have

been categorized

into the levels described

in the

Federal

Register Notice (45 FR 66754) dated October 7,

1980.

You are required

to respond to this letter and in preparing your response,

you should follow

the instructions in Appendix A.

With respect

to Item 3 of Appendix A, we note that you have taken the necessary

corrective

and followup actions prior to the

end of the inspection,

therefore,

you need not address yourself to this matter in your response.

In addition,

one activity appears

to be

a deviation

from the

FSAR commitment

on Seismic gualification of Standard

Cabinets

as addressed

in

FSAR Section

3. 10a.b.3,

Part III which documents

a "Static Seismic Analysis" performed to

verify that the mounting bolts of the 'standard

cabinets

are capable of with-

standing

the seismic

environment.

This item of Deviation is discussed

in the

enclosed

inspection report.

In your reply, please

include your

comments

concerning this item,

a description of any steps that

have

been or will be

6 Z06 I.605I0;

~g 0/

l

D,

I

II

k

Pennsylvania

Power

and Light Company

2

taken to prevent recurrence,

and the date all corrective actions

and preventive

measures

were or will be completed.

In addition to the need for corrective

action regarding this specific deviation,

we are concerned

about the

implemen-

tation of your design control

program that permitted it to occur.

Consequently,

in your reply, you should describe

in particular,

those actions

taken or

planned to improve the effectiveness

of your design control

program.

In addition to the apparent

items of noncompliance

discussed

above

and in

Appendix A, "Notice of Violation", findings of this inspection

also indicate

that several

significant weaknesses

exist in your design

and construction

program.

These

areas

are discussed

in Appendix 8, Significant Observations.

You are requested

to inform this office within thirty (30) days of the date of

this letter of the results of actions you have taken or plan to take to improve

your design

and construction

program in the areas

of significant weaknesses

identified in Appendix B.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will placed

in the

NRC's Public

Document

Room.

If this report contains

any information that you (or your

contractors)

believe to be exempt

from disclosure

under

10 CFR 9.5(a)(4), it

is necessary

that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for withholding;

and (b) submit within 30 days

from the date of this letter

a written application

to this office to withhold such information.

Consistent with section 2.790(b)(1),

any such application

must. be accompanied

by an affidavit executed

by the owner

of the information which identifies the document or part sought to be withheld,

and which contains

a full statement

of the reasons

on the basis

which it is

claimed that the information should

be withheld from public disclosure.

This

section further requires

the statement

to address

with specificity the consider-

ations listed in

10 CFR 2.790(b)(4).

The information sought to be withheld

shall

be incorporated

as far as possible into a separate

part of the affidavit.

If we do not hear

from you in this regard within the specified .periods

noted

above,

the report will be placed in the Public Document

Room.

The telephone

notification of your intent to request withholding, or any request for an

extension of the

10 day period which you believe necessary,

should

be

made to

the. Supervisor,

Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

Should you ha've

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Thomas

T. Martin; Acting Director,

Division of Engineering

and Technical

Inspection

0

Pennsylvania

Power

and Light Company

3

Enclosures:

1.

Appendix A, Notice of Yiolation

2.

Appendix B, Significant Observations

3.

Combined Office of Inspection

and Enforcement

Inspection

Report

Number

50-387/81-08;

50-388/81-04

cc w/encls:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

W.

E. Barberich,

Licensing Engineer

H.

W. Keiser,

Superintendent

of Plant