Forwards IE Insp Repts 50-387/80-31 & 50-388/80-19 on 801117-20.No Noncompliance Noted
ML17138B807
Person / Time
Site: Susquehanna  
Issue date: 12/10/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B808 List:
References
NUDOCS 8102260006
Download: ML17138B807 (3)


See also: IR 05000387/1980031

Text

6P,4 46QyI

Wp.0

Op

C

O

o%

Docket Nos.

50-387.

50-388

UNITED STATES

NUCLEAR

REGULATORY,. COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYI VANIA 19406

DEtl ~ 0 i"i3

Pennsylvania

Power

8I Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction - Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

e

Subject:

Combined Inspection

50-387/80-31;

50-388/80-.19

-. egg (pg,

JAe 30'198

eo~Isse~H

IIZ

This refers to the routine inspection

conducted

by Mr. L. Narrow of this office

on November 17-20,

1980 at Allentown, Pennsylvania

and at Susquehanna

Steam

Electric Station, Units I and 2, Berwick, Pennsylvania of activities authorized

by NRC License

Nos.

CPPR-101

and

CPPR-102

and to the discussions- of our findings

held by Mr. Narrow with Mr. Kyner and other members of your staff at the conclusion

of the inspection.

Areas

examined during this inspection are described

in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this'letter.

Within

'hese

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the

inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part 2 Title

10,

Code of Federal'" Regulations,

a copy of,this letter and the enclosed. inspection

report will be placed in .the NRC's Public Document

Room.

If this report contains

any information that you (or your contractor)

believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this offipe to

withhold such information from public disclosure.

Any such application must

be

accompanied

by an affidavit executed

by the owner of the information, which

identifies the document or part sought to be withheld, and which contains

a

statement of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph'(b)

(4) of Section 2.790.

The information sought to be withheld shall

be incorporated

as far as possible

into a separate

part o'f the affidavit. If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document

Room.

. 18.3.022 gogo'

JP

t

4t

Pennsyl vani a Power

and Light

Company

Ho reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

0-

Robert

. Carlson, Chief

Reactor Construction

and Engineering

. Support Branch

Enclosure:

Office of Inspection

and Enforcement

Combined

Inspection Report Numbers

50-387/80-.31;

50-388/80-19

cc w/encl:

A. R. Sabol,

Manager,

Nuclear guality Assurance

kl. E. Barberich, Licensing'Engineer.

H.

W. Keiser, Superintendent

of Plant