Forwards IE Insp Repts 50-387/80-05 & 50-388/80-03 on 800324-28 & Notice of Violation
ML17138B430
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/22/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B428 List:
References
NUDOCS 8008120609
Download: ML17138B430 (3)


See also: IR 05000387/1980005

Text

II6

~4

0

0O

4

Y/

(N

+n ++*++

Docket Nos.

50-387

50-388

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

.KING OF PRUSSIA, PENNSYLVANIA19406

22

L0go

Pennsylvania

Power

5 Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

(N-4)

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

50-387/80-05;

50-388/80-03

This refers to the inspection

conducted

by Mr. J.

Durr of this office on

March 24-28,

1980 at Susquehanna

Steam Electric Station,

Units No.

1 and 2,

Bewick, Pennsylvania of activities authorized

by NRC License Nos.'PPR-101

and- CPPR-102

and to the discussions

of our findings held by Mr. Durr with

Mr.

W.

H. Gulliver at the conclusion

of. the inspection.

Areas

examined during this inspection

are described

in, the Office of Inspection

and Enforcement Inspection

Report which is enclosed

with this letter.

Within these

areas,

the inspection consisted of'elective examinations

of

procedures

and representative

records,

interviews with personnel,

measurements.

made

by the inspector,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that

one of your activities

was not conducted in full compliance with NRC requirements,

as set forth in

the Notice of Violation, enclosed

herewith

as Pppendix

A.

This item of

noncompliance

has

been categorized

into the. levels

as described

in our

correspondence

to you dated

December

31,

1974.

This notice is sent to you

pursuant to the provisions of Section

2.201 of the

NRC's

"Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations.

Section

2.201

requires

you

to submit to this office, within thirty (30) days of your receipt of this

notice,

a written statement or explanation in reply including:

(1) corrective

stepq which have

been

taken

by you and the results

achieved;

(2) corrective

steps

which will be taken to avoid further items of noncompliance;

and

(3)

the date

when full compliance will be achieved.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosures

will'be placed'n

the NRC's Public Document

Room.

If this report contains

any information that you (or your contractor)

believe to be proprietary, it

is necessary

that you make

a written application within 20 days to this

8008I, 9 0 &OP

0'

Pennsylvania

Power

8 Light Company

office to withhold such information from public disclosure.

Any such application

must be accompanied

by an affidavit executed

by the owner of the information,

which identifies the document or part sought to be withheld,

and which

contains

a statement of reasons,

which addresses

with specificity the items

which will be considered

by the Commission

as listed in subparagraph

(b)

(4) of Section 2.790.

The information sought to be withheld shall

be

incorporated

as far. as possible into a separate

part of the affidavit. If

we do not hear.

from you in this regard within the specified period, the

repor t wi 1 1 be placed in the Public

Document- Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Robert T. Carlson,

Chief

Reactor Construction

and Engineering

Support

Branch

~

~

Enclosures:

l.

Appendix A; Notice of Violation

2.

Office of Inspection

and Enforcement

Inspection

Report Numbers 50-287/80-05;

50-388/80-03

cc w/encls:

A. R. Sabol,

Manager,

Nuclear guality Assurance

W. E. Barberich,

Licensing Engineer

S.

H. Cantone,

Superintendent

of Plant

4.