Forwards IE Insp Repts 50-387/80-11 & 50-388/80-07 on 800513-16.No Noncompliance Noted
ML17138B390
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/03/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B391 List:
References
NUDOCS 8007170249
Download: ML17138B390 (2)


See also: IR 05000387/1980011

Text

~8 II600(

Wp,0

0

r

0

+>>*<<"

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

63I PARK AVENUE

KING OF PRUSSIA. PENNSYLVANIA 19406

Docket Nos.

50-387

50-388

Pennsylvania

Power

8 Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

(N-4)

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

Nos. 50-387/80-11

50-388/80-07

This refers to the inspection

conducted

by Mr. J.

P. Durr of this office on May

13-16,

1980 at the Susquehanna

Steam Electric Station, Units No.

1 and 2, Berwick,

Pennsylvania

of activities authorized

by

NRC License

Nos.

CPPR-101

and

CPPR-102

and to the discussions

of our findings held by Mr. Durr with Mr. R. Beckley at

the conclusion of the inspection.

Areas

examined during this inspection are described

in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

measurements

made

by the

inspector,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were observed.

In accordance

With Section

2.790 of the

NRC's "Rules of Practice,"

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection

report will be placed in the

NRC's Public Document

Room.

If this report contains

any information that you (or your contractor)

believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

be

accompanied

by an affidavit executed

by the owner of the information, which

identifies the document or part sought to be withheld,

and which contains

a

statement of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph

(b) (4) of Section

2.790.

The information sought to be withheld shall

be incorporated

as far as

possible into a separate

part of the affidavit. If we do not hear from you in

this regard'within the specified period,

the report will be placed in the Public

Document

Room.

600 717 OP /0

Pennsylvania

Power

5 Light Company

No reply to this letter is required;

however,

should you have any questions

concerning this inspection,

we will be pleased

to. discuss

them with you.

Sincerely,

A

Robert T. Carlson,

Chief

Reactor Construction

and Engineering

Support

Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Numbers 50-387/80-11

and 50-388/80-07

cc w/encl:

A. R. Sabol,

Manager,

Nuclear guality Assurance

W. E. Barberich,

Licensing Engineer

S.

H. Cantone,

Superintendent

of Plant