Text
0
A0O
cP's
'5"
"-
+**++
Docket Nos.
50 3-87/Pf
50-388
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
JAN 3l
$979
Power
8 Light Company
ATTN:
Mr. Norman
W. Curtis
Vice President
En'gineering
and Construction
(N-4)
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Combined Inspection 50-387/79-02;
50-388/79-02
This refers to the inspection
conducted
by Mr. A. Finkel of this office
on January 8-11,
1979 at Susquehanna
Steam Electric Station,
Units
1 and
2, Berwick, Pennsylvania of activities authorized
by NRC License
Nos.
CPPR-101;
CPPR-102
and to the discussions
of our findings held by Mr.
Finkel with Mr. J.
Green of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of
Inspection
and Enforcement Inspection
Report which is enclosed with this
letter.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and, representative
records,
interviews with
personnel,
and,"observations
by the inspector.
Within the scope of this'nspection,
no items of noncompliance
were
observed.
In accordance
with Section 2.790 of the
NRC's "Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letter and the
enclosed
inspection report will be placed in the
NRC's Public Document
Room.
If this report contains
any information that you (or your contractor)
believe to be proprietary, it is necessary
that you make
a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must be accompanied
by an
affidavit executed
by the owner of the information, which identifies the
document or part sought to be withheld, and which contains
a statement
of- reasons
which addresses
with specificity the items which will be
considered
by the
Commission
as listed in subparagraph
(b) (4) of Section
2.790.
The information sought to be withheld shall
be incorporated
as
far as possible into a separate
part of the affidavit. If we do not
hear from you in this regard within the specified period,
the report
will be placed in the Public Document
Room.
Power
& Light Company
No replv to this letter is required;
however,
should you have
any ques-
tions concerning this inspection,
we will be pleased
to discuss
them
with you.
Sincerely,
Robert T. Carlson,
Chief
Reactor
Construction
and Engineering,
Support Branch
Enclosure:
Office of Inspection
and Enforcement
Combined Inspection
Report Numbers 50-.387/79-02;
50-388/79-02
cc w/encl:
~
~
~
~
A. R. Sabol,
Nanager,
Nuclear guality Assurance
W. E. Barberich, Licensing Engineer