Exelon Generation ~
200 Exelon Way Kennett Square. PA 19348 April 6, 2017 www.exeloncorp.com 10 CFR 50.54(a)(3) 10 CFR 71.106(b)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457. 71-0008. and 72-0073 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454, STN 50-455, 71-0008. and 72-0068 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317. 50-318, 71-0008, and 72-0008 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461. 71-0008, and 72-1046 Dresden Nuclear Power Station, Units 1, 2 and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. 50-249, 71-0008, and 72-0037 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket Nos. 50-333, 71-0240, 72-0012 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373, 50-374. 71-0008, and 72-0070 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352. 50-353. 71-0008, and 72-0065 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220, 50-410. 71-0008, and 72-1036
U.S. Nuclear Regulatory Commission April 6, 2017 Page 2 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219, 71-0008, and 72-0015 Peach Bottom Atomic Power Station, Units 1, 2 and 3 Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171, 50-277, 50-278, 71-0008, and 72-0029 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, 71-0008, and 72-0053 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244, 71-0008, and 72-0067 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 and 71-0008
Subject:
Request to Transfer 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages for James A. FitzPatrick Nuclear Power Plant, currently under the common Entergy Quality Assurance Program Approval No. 71-0240, to the common Exelon Quality Assurance Program Approval No. 71-0008.
Reference:
- 1)
Letter from P. Silva (U.S. Nuclear Regulatory Commission (NRC)) to P.R. Simpson (Exelon Generation Company, LLC (EGC)), Quality Assurance Program Approval for Radioactive Material Packages No.
0008, Revision 13, dated April 4, 2016.
- 2)
Letter from P. Silva (U.S. Nuclear Regulatory Commission (NRC)) to J. F. McCann (Entergy Nuclear Operations, Inc.), Revised Quality Assurance Program Approval Form for Radioactive Material Packages No. 0240, Revision 10, dated August 13, 2015.
In Reference 1, the U.S. Nuclear Regulatory Commission (NRC) transmitted a revised 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages (i.e., No. 0008, Revision 13) at the following Exelon Generation Company, LLC (EGC) nuclear stations:
Braidwood Station, Units 1 and 2 Byron Station, Units 1 and 2 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Clinton Power Station, Unit 1 Dresden Nuclear Power Station, Units 1, 2 and 3 LaSalle County Station, Units 1 and 2 Limerick Generating Station, Units 1 and 2
U.S. Nuclear Regulatory Commission April 6, 2017 Page 3 Nine Mile Point Nuclear Station, Units 1 and 2 Oyster Creek Nuclear Generating Station Peach Bottom Atomic Power Station, Units 1, 2 and 3 Quad Cities Nuclear Power Station, Units 1 and 2 R.E. Ginna Nuclear Power Plant Three Mile Island Nuclear Station, Unit 1 In Reference 2, the NRC transmitted a revised 10 CFR Part 71 Quality Assurance Program Approval for Radioactive Material Packages (i.e., No. 0240, Revision 10) for the following Entergy Nuclear Operations, Inc. nuclear stations, on Docket No. 71-0240:
Indian Point Nuclear Power Plants, Units 1, 2 and 3 Pilgrim Nuclear Power Station James A. FitzPatrick Nuclear Power Plant EGC requests that the 10 CFR Part 71 Quality Assurance Program Approval No. 0008 be revised to incorporate the James A. Fitzpatrick Nuclear Power Plant.
With respect to the consolidated Approval No. 0008, EGC requests the following change to the associated NRC Form 311:
- 1) Revise Item 4 of Block 5 Conditions to include:
- James A. FitzPatrick Nuclear Power Plant EGC is aware that Entergy Nuclear Operations, Inc. will be submitting a letter to request the removal of James A. FitzPatrick Nuclear Power Plant from 10 CFR Part 71 Quality Assurance Program Approval No. 0240.
In addition to the above request, as required by 10 CFR 71.101, "Quality assurance requirements," paragraph (f), this letter serves as notification to the NRC that EGC intends to continue to apply previously approved 10 CFR Part 50, Appendix B Quality Assurance Programs to 10 CFR Part 71 radwaste packaging and transportation activities for all EGC nuclear power plants, including the James A. Fitzpatrick Nuclear Power Plant.
Fitzpatrick has a site-specific 10 CFR Part 50 Quality Assurance Program Manual (QAPM) that was developed under 10 CFR 50.54(a) from Revision 31 of the NRC-approved common Entergy Part 50 QAPM. In the FitzPatrick Part 50 QAPM, EGC replaced the Entergy corporate organization with the Exelon corporate organization in Chapter 1. This site-specific Part 50 QAPM was effective on April 1, 2017. The remaining Exelon sites are currently operating under Revision 91 of the NRC-approved common 10 CFR Part 50 Quality Assurance Topical Report.
U.S. Nuclear Regulatory Commission April 6, 2017 Page4 If you have any questions or require additional information, please contact Christian Williams, Licensing and Regulatory Affairs, at 610-765-5729.
There are no regulatory commitments in this letter.
R;J::n:,A_J )"-- cf----
James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC
U.S. Nuclear Regulatory Commission April 6, 2017 Page 5 cc:
Regional Administrator - NRC Region I Regional Administrator - NRC Region III NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station NRC Senior Resident Inspector - Calvert Cliffs Nuclear Power Plant NRC Senior Resident Inspector - Clinton Power Station NRC Senior Resident Inspector - Dresden Nuclear Power Station NRC Senior Resident Inspector - James A. FitzPatrick Nuclear Power Plant NRC Senior Resident Inspector - LaSalle County Station NRC Senior Resident Inspector - Limerick Generating Station NRC Senior Resident Inspector - Nine Mile Point Nuclear Station NRC Senior Resident Inspector - Oyster Creek Nuclear Generating Station NRC Senior Resident Inspector - Peach Bottom Atomic Power Station NRC Senior Resident Inspector - Quad Cities Nuclear Power Station NRC Senior Resident Inspector - R. E. Ginna Nuclear Power Plant NRC Senior Resident Inspector - Three Mile Island Nuclear Station, Unit 1 NRC Project Manager, NRR - Braidwood Station NRC Project Manager, NRR - Byron Station NRC Project Manager, NRR - Calvert Cliffs Nuclear Power Plant NRC Project Manager, NRR - Clinton Power Station NRC Project Manager, NRR - Dresden Nuclear Power Station NRC Project Manager, NRR - James A. FitzPatrick Nuclear Power Plant NRC Project Manager, NRR - LaSalle County Station NRC Project Manager, NRR - Limerick Generating Station NRC Project Manager, NRR - Nine Mile Point Nuclear Station NRC Project Manager, NRR - Oyster Creek Nuclear Generating Station NRC Project Manager, NRR - Peach Bottom Atomic Power Station NRC Project Manager, NRR - Quad Cities Nuclear Power Station NRC Project Manager, NRR - R. E. Ginna Nuclear Power Plant NRC Project Manager, NRR - Three Mile Island Nuclear Station, Unit 1 Decommissioning Branch Chief, NRC Region III Illinois Emergency Management Agency - Division of Nuclear Safety Director, Bureau of Radiation Protection, PA Department of Environmental Protection Chairman, Board of County Commissioners of Dauphin County, PA Chairman, Board of Supervisors of Londonderry Township, PA Manager, Bureau of Nuclear Engineering, NJ Department of Environmental Protection Mayor of Lacey Township, Forked River, NJ S. T. Gray, State of Maryland A. L. Peterson, NYSERDA