UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Brad Berryman Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 April 5, 2017
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE DIESEL GENERATOR SURVEILLANCE REQUIREMENTS WITH NEW STEADY STATE VOLTAGE AND FREQUENCY LIMITS (CAC NOS. MF9131 AND MF9132)
Dear Mr. Berryman:
By letter dated January 25, 2017, 1 as supplemented by letter dated March 21, 2017,2 Susquehanna Nuclear, LLC submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2. The proposed amendments request changes to certain surveillance requirements in Technical Specification 3.8.1, "AC [Alternating Current] Sources -
Operating." The changes are in the use of steady state voltage and frequency acceptance criteria for onsite standby power source of the diesel generators, allowing for the use of new and more conservative design analysis.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 1 O of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following, as far as applicable, the form prescribed for original applications. Section 50.34 of 1 O CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML17044A149 2 ADAMS Accession No. ML17080A405
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is January 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions regarding this matter, I may be reached at 301-415-1387 or by e-mail to Tanya.Hood@nrc.gov.
Docket Nos. 50-387 and 50-388 cc: Distribution via Listserv Jer:t1Jkt Tanl. E. Hood, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE DIESEL GENERATOR SURVEILLANCE REQUIREMENTS WITH NEW STEADY STATE VOLTAGE AND FREQUENCY LIMITS (CAC NOS. MF9131 AND MF9132) DATED APRIL 5, 2017 DISTRIBUTION:
PUBLIC LPL 1 R/F RidsACRS_MailCTR Resource RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsNrrPMSusquehanna Resource RidsRgn1 MailCenter Resource RidsNrrDeEnpb Resource ADAMS A ccess1on N ML17089A313 o.:
OFFICE DORL/LPL 1 /PM DORL/LPL 1/LA NAME THood LRonewicz DATE 03/30/2017 03/31/2017 OFFICE DSS/STSB/BC DSS/SRXB/BC NAME AKlein EOesterle DATE 04/03/2017 04/03/2017 RidsNrrDeEeeb Resource RidsNrrDssStsb Resource RidsNrrDorl Resource AFoli, NRR PSnyder, NRR SSun, NRR RWolfgang, NRR RidsNrrDssSrxb Resource
- b
- 1 1v e-ma1 DE/EEEB/BC DE/EN PB/BC JZimmerman DAiiey 04/04/2017 04/03/2017 DORL/LPL 1 /BC DORL/LPL 1 /PM JDanna THood 04/04/2017 04/05/2017 OFFICIAL RECORD COPY