ML17083C273
| ML17083C273 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 06/22/1990 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML17083C274 | List: |
| References | |
| NUDOCS 9007120028 | |
| Download: ML17083C273 (8) | |
See also: IR 05000275/1990016
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
CCESSION
NBR:
FACIL:50-275
50-323
AUTH.NAME
KIRSCH,D.
RECIP.NAME
SHIFFER,J.D.
I
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
9007120028
DOC.DATE: 90/06/22
NOTARIZED: NO
DOCKET
5T
Diablo Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
Diablo Canyon Nuclear Power Plant, Unit 2, Pacific
Ga
05000323
AUTHOR AFFILIATION
Region 5, Ofc of the>Director
RECIPIENT AFFILIATION
Pacific Gas
& Electric Co.
SUBJECT:
Forwards Insp Repts 50-275/90-16
& 50-323/90-16
on
900417-0525
& notice violation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR J
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES
INTERNAL'ECIPIENT
ID CODE/NAME
PD5
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DOEA DIR 11
NRR/DRIS/DIR
NRR/PMAS/ILRB12
DZ.
EG FILE
02
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROOD, H
AEOD/TPAD
NRR MORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9D
NRR/DST/DIR SE2
NUDOCS-ABSTRACT
OGC/HDS2
RGN5
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EXTERNAL: LPDR
1
1
1
1
NRC PDR
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24,
~pS RECy,
(4
Vp0
4y
C
+>>**+
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94596
JUN 2?
199o
Docket Nos.
50-275
and 50-323
Pacific
Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
94106
Attention:
Mr. J.
D. Shiffer, Senior Vice President
and General
Manager
Nuclear Power Generation
Business
Unit
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units 1 and
2
This refers to a special
inspection
conducted
by Mr.
C.
Myers during the
~
~
~
~
eriod of April 17 throuqh
May 25,'990
and of activities authorized
by
NRC
icense
Nos.
DPR-80 and
DPR-82 and to the discussion of our findings held with
Mr.
B, Giffin and other
members of your staff at the conclusion of the
inspection.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that certain of your
activities were not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith
as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
The violations
involve failures to follow your procedures
for identifying problems
and
obtaining corrective actions.
These findings indicate
a need to improve your engineering
involvement in the
routine conduct of plant activities, particularly in the areas
of motor
operated valves,
and maintaining an improved technical
awareness
and overview
of maintenance activities
and problems.
In your response
to the above
violations, please
discuss your corrective actions to provide an adequate
technical
evaluation for the testing
and maintenance
of MOVs to assure their
design basis operability.
In accordance
with 10 CFR 2.790(a),
a copy of this letter'and
the enclosures
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
'r007120028
5'II0622
I-"IDOCK O.iO00275
9
-2-
The i esponses
directed
by this letter and the accompanying
Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required
by the Paperwork Reduction Act of 1980,
PL 96-511.
Sincerely,
Dennis
Ki sch, Chief
Reactor Safety Branch
Division of Reactor Safety
and Projects
Enclosures:
A.
Appendix A, Notice of Violation
B.
Inspection Report
Nos.
50-275/90-16
and 50-323/90-16
cc w/enclosures:
J.
A. Sexton,
R.
F.
Locke,
PGEE
J.
D. Townsend,
PG&E (Diablo Canyon)
D.
A. Tagqert,
PG&E (Diablo Canyon)
News Services,
T.
L. Grebel,
PG&E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
-3-
bcc w/enclosures:
docket file
Project Inspector
'esident
Inspector
A. Chaffee
R.
Zimmerman
G.
Cook
B. Faulkenberry
J. Martin
bcc w/o enclosure
8:
M. Smith
J. Zollicoffer
N. Western
REGION V/dot
CJMyers
6/
/go
RHuey
6/zn'go
AJohnson
6/~49O
DKirs h
6/pgso
YES /
NO
]
ES /
NO
] YE
/
NO
] YES /
NO
]
ES /
NO
]