RSODSN%l@RRK DNAQ%TQZI (RZDS>
ACCESS lON
.NBR: 8810170230
DOC. DATE: 88/09/28
NOTARIZED:
NO
DOCKET
FACIL:50-275 Diablo, Canyon Nuclear
Power Plant, Unit 1, Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Plant, Unit 2, Pacific
Ga
05000323
AUTH.NAME
AUTHOR AFFILIATION
IMMER~N,R.P.
Region
5, Ofc of the Director
REGIP.NAME
RECIPIENT AFFILIATION
SHIFFER,J.D,
Pacific Gas
s Electric Co.
SUBJECT:
Forwards
Insp Repts
50-275/88-21
& 50-323/88-19
on
880717-0903.No violations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR I
ENCL
t
SIZE: 3 +'~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
I
RGN5
ERNAL: LPDR
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMANEJ
REG FILE
02
FILE
Ol
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
ROOD,H
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS2
RES/DSIR
DEPY
NRC
COPIES
LTTR. ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the routine inspection
conducted
by Messrs.
P.
P. Narbut and
K. E.'ohnston
during the period of July 17 through September
3,
1988.
This
inspection
examined your activities
as authorized
by
NRC License
Nos.
and
At the conclusion of the inspection,
discussions
of their
findings were held with Mr. J.
D. Townsend,
and other members of your staff.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Mithin these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
No violations of NRC
requirements
were identified within the scope of this inspection.
However, the inspection findings did identify several
problems that should
be
addressed.
First, the problems identified in I&C procedure
backlog indicate
that
some corrective actions
have not been timely, such that (1)
a preventable
containment ventilation isolation event occurred
and (2) there is skepticism
among
I&C personnel
as to PG&E's ability to deal with problems, particularly
the guality Hotline.
Although good individual performance
was demonstrated,
that is,
an
I&C technician
avoided
a potential reactor trip; there
appears
to
be
a continuing problem which should
be addressed.
Secon'dly,
Our:,review of Licensee
Event Report 1"88-024, "Failure to Meet
Technical Spicification Limiting Condition for Operation for an Inoperable
Reactor Protection
Instrument
Channel
Due to Personnel
Error," as documented
in Paragraph"S=.d.
of the enclosure,
found that the root cause
analysis
and
corrective actions identified were considered
to be unacceptable.
This topic
has
been discussed
between your staff and the senior resident
inspector
on
September
12,
1988.
As a result of this conversation
a commitment was,made
to
provide
a revision to the
LER to clarify the root cause
analysis
and provide
more specific corrective actions.
Additionally, this is an unresolved .item
and your evaluation
as to the technical significance
should
be included in
your revision to the
LER.
Therefore, this letter
acknowledges
your commitme t
fot
a revision and urges
a timely response.
l
I
8810170230
880928
ADOCK 0500027S
PNU
28
1988
Finally, there were two trips during this inspection period (Paragraphs
4.i
and 4.j of the report) which could have
been prevented, if there
had been
appropriate prioritization and resolution of problems.
We understand
that you
have initiated a study of the problems,
and
we look forward to your
conclusions
and findings in this area.
Therefore,
we request that you provide your evaluation of these
conditions
and
your planned corrective actions within 45 days of the date of this letter.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we would be pleased
to discuss
them with you.
Sincerely,
j
lp(.
~ Pc,,:n.l
LCD
R.
P.
Zimmerman,
Chief Reactor
Projects
Branch
Enclosures:
Inspection Report Nos.
50-275/88-21
and 50-323/88-19
cc w/enclosure:
S.
D. Skidmore,
PG8E
R.
F.
Locke,
PG8E
J.
D. Townsend,
PG8E (Diablo Canyon)
D.
A. Taggert,
PGBE (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon) State of California
Sandra Silver (Report Only)
bcc w/enclosure:
Project Inspector
Resident
Inspector
State of California
docket file ;-""
G.
Cook
B. Faulkenberry
J. Hartin
T. Foley,
bcc w/o enclosure:
J. Zollicoffer
M. Smith
REGION
V
-3-
REGION
V pV
V
KEJohnston
PPNarbut
MMendonca
AFChaffee
DFKigsch
9>/88
9/~@88
9~/88
9/
/88
9/rff88
EST
COPY j
R
EST
COPY j REQUEST
COPY j REQUEST
COPY ] REQUEST
ES /
NO
E
/
NO
YES /
NO
YES /
NO
YES /
NO
RZ
man
9/
/88
EST
COPY
7
YE
/
NO
TO
YES /
NO