ML17083B817

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/86-26 & 50-323/86-25 on 860915-19.No Violations Noted
ML17083B817
Person / Time
Site: Diablo Canyon  
Issue date: 10/21/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083B818 List:
References
NUDOCS 8611040425
Download: ML17083B817 (4)


See also: IR 05000275/1986026

Text

4

'

1

,

1

M

H

Docket" Nos. 50-275,

50-323

" + Cg

Pacific

Gas

and Electric Company

77 Beale Street,

Room

1451

San Francisco, California'4106

Attentioni

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation,

Licensing

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

a

This refers to the inspection

conducted

by Mr. J.

P. Burdoin of this office

during September

15-19,

1986, of activities authorized by NRC License Nos.

DPR-80 and DPR-82,

and to the discussion of our findings held by Mr. Burdoin

with Mr. R. Thornberry and other members of your staff on September

19,

1986.

Areas examined during this inspection

are described in the enclosed inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations of NRC requirements

were identified within the scope of this

inspection.

Xn accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document Room.

Sbii040425

Sb1021

PDR

  • DOCK 05000275

8

PDR

I W

I

I'fl

I'

'I

IV

I

H

Wlt'

I

h,

'I

-W

I.

H

II

I

H

I

I

I

t

M

I"

~

h

t

1

f

IH'

M,,', t'

tl

~'I

t

I'

I

W

I

I

~',

4

I

It

1

0

OCT 3i 1986

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Qricjinal sign6.d by

D.

F. Vir."ch

D. F. Kirsch, Director

Division of Reactor Safety and

Projects

Enclosure:

Inspection Report Nos. 50-275/86-26,

50-323/86-25

cc w/enclosure:

S.

M. Skidmore,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

PE A. Crane, Jr.,

PG&E

D. Taggart,

PG&E (Diablo Canyon)

R. steinberg,

PG&E (Diablo Canyon)

Sandra Silver (Report only)

State of California

bcc w/enclosure:

RSB/Document Control Desk

(RIDS)

Project Inspector

Resident Inspector

G ~

Cook

BE Faulkenberry

J. Martin

bcc w/o enclosure:

IFMB

Region V

JBu

n norma

10

g/86

MMendonca

10//p /86

AEChaffee

DFKirs h

10//</86

10/$ /86

0

PI

P

P

PI

P

P

I'

4

P

I

PI

I

~

  • I

Pl II

P

6