ML17083B773
| ML17083B773 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 07/17/1986 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML17083B774 | List: |
| References | |
| NUDOCS 8608040310 | |
| Download: ML17083B773 (4) | |
See also: IR 05000275/1986018
Text
JUL 47 ls86
Docket Nos.
50-275 acd 50-323 fQ
Pacific Gas
and Electric Company
77 Beale Street,
Room
1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the
a routine inspection,
conducted
by Messrs.
M. L. Padoyan,
T. M. Ross,
and T. J. Polich during the period of May 25, through July 5,
1986.
This inspection
examined your activities as authorized
by NRC License Nos.
At the conclusion of the inspection,
discussions
of our
findings were held with Mr. R. C. Thornberry,
and other member's of your staff,
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that 'one of your
activities was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the, enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
PL 96-511.
4
Sb08040310
Sb0717
ADOCK 05000275
I. 8
PDR,
WHW
- 4>>
( )HI-'\\,
I
IW
I
W
~
I
,4
4
~
t
<<If
wffv
- "
Wf
'>>
4
WW
>>>>
4'f till
4
I <<d
4'l
I" >>
H
>>W
%(
>>
4I,W>>
.Il;, >>
~ lg ..
W
-
'
~
'
~ H
~WJ,>>,,
Z w),'),
4,'4>>
1
WIW'0
Il k
I'
.4
44l 'l1
IH
ft -I
V
a
4
"I )
WHW
$ W
>>
w'Wf3
'Al"WJf
>>,fb "f.. ~ WI'W'.f l
.W
l I
>> (4 tl
W
, p
,>> HIW"("
tk <<<ir
4', b
>>j
If( n<<y
IW J'
<<W8
II
'1
'
'WI
I)
$ 44) f
<<5.'5 444>> 3 '.'HWs << '4
<<.4
4
.4',5
Wf
I VCf
~UL k7 )986
Should you have
any questions
concerning this inspection,
discuss
them with you.
p
Sincerely,
I
I
I*
I
f'e
will be glad to
A. E.
Cha fee, Deputy'
rector
Division of Reactor Safety
and Projects
Enclosures:
1.
Appendix A Notice of Violation
2.
Inspection Report Nos. 50-275/86-18
and 50-323/86-18
cc w/enclosures:
S.
D. Skidmore,
P. A. Crane, Jr.,
R.
C. Thornberry,
PG&E (Diablo Canyon)
D. A. Taggert,
PG&E (Diablo Canyon)
R. S. Weinberg,
PG&E (Diablo Canyon)
State of California
Sandra Silver (Report Only)
bcc w/enclosures:
RSB/Document Control Desk (RIDS)
G. Cook,
RV
B. Faulkenberry,
RV
J ~ Martin,
RV
Resident Inspector
Project Inspector
Region
V
4
MLPadovan/dot
TMRoss
TJPolich
MMMendonca
ADJohnson
EChaffee
7/i</86
7/'/86
7/ ~/86
7/
~/86
7/W 86
7/t7/86
/
\\
I p
1
d
I
~
)t
t
v,
~ (