ML17083B718
| ML17083B718 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 03/11/1986 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML17083B719 | List: |
| References | |
| NUDOCS 8603310028 | |
| Download: ML17083B718 (4) | |
See also: IR 05000275/1986004
Text
Docket Nos. 50-275'nd
50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Prancisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the routine inspection,
conducted by Messrs.
M. I,. Padov'an,
T.
M. Ross,
and T. J. Polich, of this office during the period of January
26,
1986 through March 1,
1986.
This inspection
examined your activities
as
authorized by NRC License Nos.
Discussions
of our findings
were held with.Mr. R.
C. Thornberry,
and other members of'our'taff, at the
conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10
CPR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosures
will be placed in the
NRC Public Document Room.
The responses
directed by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget as required by the Paperwork
Reduction Act of 1980,
PL 96-511.
8603310029
9603k%
ADOCK,05000275
9
'DR
gWQQ
k
'I
> II
A
MARit i986
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
Orfgfnaf s'foned
bg
D. F. Kirsch
A. E. Chaffee,
Chief
Reactor Projects
Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-275/86-04
and 50-323/86-05
cc w/enclosures:
S.
D. Skidmore,
P.
A. Crane, Jr.',
R.
C. Thorhberry,
PG&E (Diablo Canyon)
D. A. Taggvert,
PG&E (Diablo Canyon)
R.
S. Weinber'g, PG&E>>(Diablo'anyon)
State of California
Sandra Silver (Report Only)
- ~,)
~r','.
I
bcc w/enclosures'.
RSB/Document Control Desk
(RIDS)
Project Inspector
Resident, Inspector
G. Cook,
RV
B. Faulkenberry,
RV-
J. Martin, RV
s
I
bcc w/o enclosure
2:
LFMB
a
I
s
REGION V
HP~ovae/dot
o
s
TPolach
K1odds
AChCad ee
3/ /D/86
3//o/86
3//P/86
3//o /86
3/yg/86
I ~
l
f
v
ff
'I
f
,g
f
hA,
'<'s,
C
1
t
f
f
f'
y
S
I.
1 f
~flyf I I,,
f
f
f
I
1
ff
fl
f
ilf'fl
If
fl
X
,f
f
ff
~If
h,