ML17083B629

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/85-25 & 50-323/85-22 on 850526-0629.No Violations Identified
ML17083B629
Person / Time
Site: Diablo Canyon  
Issue date: 07/16/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083B630 List:
References
TAC-59063, NUDOCS 8508080173
Download: ML17083B629 (2)


See also: IR 05000275/1985025

Text

Docket Nos. 50-275

and 50-323

@,-25

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the

a routine inspection,

conducted

by Messrs.

M.

M. Mendonca,

M. L. Padovan,

T.

M. Ross,

T. J. Polich,

and J. F. Burdoin of this office

during the period of May 26, through June

29,

1985.

This inspection

examined

your activities

as authorized

by NRC License

Nos.

DPR-80

and DPR-81.

Discussions

of our findings were held with Mr. R.

C. Thornberry,

and other

members of your staff, at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted

of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations of NRC

requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790 (a),

a copy of this letter and the enclosures

will be placed in the

NRC Public Document

Room.

Should you -have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Orfgiro1

",n~: 1

by',

1'.

1;ir."ch

D. F. Kirsch, Acting Director

Division of Reactor Safety

and Projects

Enclosures:

Inspection Report Nos. 50-275/85-25

and 50-323/85-22

cc w/enclosure:

S.

D. Skidmore,

PG&E

P.

A. Crane, Jr.,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

D. A. Taggert,

PG&E (Diablo Canyon)

R.

S. Weinberg,

PG&E (Diablo Canyon)

bcc w/enclosure:

RSB/Document Control Desk

Inspector;

State of CA

bcc w/o enclosure:

Greg Cook;

LFMB

Mendonca/dot

Padovan

Ross

Po 'ch

7/t

5

7/

85

7/

/85

7

85

8508080173

850716

PDR

ADOCK 05000275

Q

PDR

Burdoin

Dodds

7//5

7

/85

Kirph

7//5/85

(RIDS); Mr. Martin; Resident

gA/

c h~E4c

~/s/+r

lL