ML17083B504

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/84-42 & 50-323/84-31 on 841130-850118.No Violation Noted
ML17083B504
Person / Time
Site: Diablo Canyon  
Issue date: 02/05/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083B505 List:
References
NUDOCS 8502220071
Download: ML17083B504 (4)


See also: IR 05000275/1984042

Text

~p,fl flEQy~

Mp

~4

0

I

n

)0 p p y 4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94595

FE

~

1985

Docket Nos. 50-275,

50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

Attachment to

GAP 8314. 12.02

Reference:

NRC Inspection

Report

Nos. 50-275/84-42

&

50-323/84-31

Dated:

February 5,

1985

Page

14 of 23

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the special inspection

conducted

by Messrs.

D. F. Kirsch and

R. T. Dodds of this office during the period of November 30,

1984 through

January

18,

1985, of activities authorized

by NRC License

No. DPR-76 and

Construction Permit No.

CPPR-69.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and obser'vations

by. the inspector.

No violations with NRC 'requirements

were identified within the scope of this

inspection.

The staff has

observed that the inspections

related to the shop welded stan-

chion allegations

required

a large expenditure of personnel

resources

by both

the

NRC and

PG&E, primarily

as

a result of the reconstruction of the engi-

neering basis for resolving the stanchion

shop weld issue.

Your Engineering

organization is urged to more fully document the basis for decisions, in their

correspondence.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

02-07-85:

Di ab1 o Distribution

R.

N. Baciarelli:768-2960:Jmc

Pacific

Gas

and Electric Company

- 2-

Attachment

to

GAP ¹314.12.02

Reference:

NRC Inspection

Report Nos.

50-275/84-42

& 50-323/84-31

Dated:

February 5,

1985

Page

15 of 23

~9SS

Should you have

any questions

concerning this inspection,

we will be glad 'to

discuss

them with you.

Sincerely,

Enclosure:

Inspection Report

Nos. 50-275/84-42

and 50"323/84-31

D. F. Ki sch, Acting Director

Division of Reactor Safety

& Projects

cc w/enclosure:

Dick Vollmer, NRR

S.

M. Skidmore,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

P.

A. Crane,

PG&E

C.

M. Seward,

PG&E (Diablo Canyon)

R. Weinberg,

PG&E (Diablo Canyon)

Sandra Silver

State of California

r

Q

C~