Text
~p,fl flEQy~
Mp
~4
0
I
n
)0 p p y 4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94595
~
1985
Docket Nos. 50-275,
50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attachment to
GAP 8314. 12.02
Reference:
NRC Inspection
Report
Nos. 50-275/84-42
&
50-323/84-31
Dated:
February 5,
1985
Page
14 of 23
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear Power Generation
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the special inspection
conducted
by Messrs.
D. F. Kirsch and
R. T. Dodds of this office during the period of November 30,
1984 through
January
18,
1985, of activities authorized
by NRC License
No. DPR-76 and
Construction Permit No.
CPPR-69.
Areas examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and obser'vations
by. the inspector.
No violations with NRC 'requirements
were identified within the scope of this
inspection.
The staff has
observed that the inspections
related to the shop welded stan-
chion allegations
required
a large expenditure of personnel
resources
by both
the
NRC and
PG&E, primarily
as
a result of the reconstruction of the engi-
neering basis for resolving the stanchion
shop weld issue.
Your Engineering
organization is urged to more fully document the basis for decisions, in their
correspondence.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
02-07-85:
Di ab1 o Distribution
R.
N. Baciarelli:768-2960:Jmc
Pacific
Gas
and Electric Company
- 2-
Attachment
to
GAP ¹314.12.02
Reference:
NRC Inspection
Report Nos.
50-275/84-42
& 50-323/84-31
Dated:
February 5,
1985
Page
15 of 23
~9SS
Should you have
any questions
concerning this inspection,
we will be glad 'to
discuss
them with you.
Sincerely,
Enclosure:
Inspection Report
Nos. 50-275/84-42
and 50"323/84-31
D. F. Ki sch, Acting Director
Division of Reactor Safety
& Projects
cc w/enclosure:
Dick Vollmer, NRR
S.
M. Skidmore,
R.
C. Thornberry,
PG&E (Diablo Canyon)
P.
A. Crane,
C.
M. Seward,
PG&E (Diablo Canyon)
R. Weinberg,
PG&E (Diablo Canyon)
Sandra Silver
State of California
r
Q