ML17083B414

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/84-11 & 50-323/84-11 on 840514-25.No Noncompliance Noted
ML17083B414
Person / Time
Site: Diablo Canyon  
Issue date: 07/13/1984
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schuyler J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083B415 List:
References
NUDOCS 8407170353
Download: ML17083B414 (2)


See also: IR 05000275/1984011

Text

~Pg RISHI

g~

g4

Docket Nos. 50-275,

50-323

Pacific Gas

and Electric Company

77 Beale Street

Room 1435

San Francisco,

California

94106

azcme.

~

UNITED STATES

LICENSING

NUCLEAR REGULATORY COMMISSION

REGION V

.lUL 1 6 1984

1450 MARIALANE,SUITE 210

wALNUTGREEK, cALIFORNIA94596

p,ttachmeITt to Gyp y314 08 03

Reference:

NRC Inspection

J. 0 l~gg

Report Nos. 50-275/

84-11

& 50-323/84-11

Dated:

, July 13,

1984

Page

4 of 9

Attention:

Mr. J. 0. Schuyler, Vice President

Nuclear Power Generation

Sub)ect:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the special inspection

conducted

by Mr. H. L. Canter

and other

members of the Region

V staff on May 14-25,

1984, of activities authorized

by

NRC License No. DPR-76 and Construction Permit No. CPPR-69.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these areas,

the inspection consisted

of selective

'xaminations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with 10 CFR 2.790(a)",

a copy of this letter and the enclosure

will be placed in the

NRC Public'ocument

Room unless

you notify this office,

by telephone,

within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

the date of this letter.

Such application must be consistent with the

requiremerits of 2.790(b)(1).

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

l.a

T.

W. Bish p, Director

Division of Reactor Safety

& Pro5ects

Enclosure:

Inspection Report Nos. 50-275/84-11

and 50-323/84-11

cc w/enclosure:

Dick Vollmer,

NRR

S.

M. Skidmore,

PG&E

R. C. Thornberry,

PG&E

P. A. Crane,

PG&E

C. M. Seward,

PG&E

Sandra Silver

State of CA

07-16-84:

Diablo Distribution

R. N. Baciarelli:768-2960:Jmc

r<