ML17083A891

From kanterella
Jump to navigation Jump to search
Forwards Emergency Preparedness Licensing Schedule.Dates of Receipt of FEMA Findings Should Allow Time for NRC Publication of Findings Per 10CFR50.47.Endorsement of Dates Requested
ML17083A891
Person / Time
Site: Diablo Canyon  
Issue date: 03/10/1981
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Dickey J
Federal Emergency Management Agency
Shared Package
ML17083A889 List:
References
NUDOCS 8106030485
Download: ML17083A891 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 HEHORAINDUtl FOR:

March 10, 1981 John Dickey, Director Radiological Emergency Preparedness Division Office of Population Preparedness FEf 1A FROt I.'UBJECT:

Brian K. Grimes, Director.

Division-of Emergency Preparedness Office of Inspection 5 Enforcement FEHA SUPPORT FOR NRC LICENSING OF NUCLEAR PLANTS By separate memorandum for individual nuclear power plants, I have asked tM FEHA provide the NRC with findings and determinations as to whether the Staw and local emergency plans that support a particular nuclear plant are adeqIMe and capable of implementation.

These previous memoranda have addressed the Farley, hcGuire, Salem and San Onofre facilities.

To.assist you in scheduling your support for the NRC licensing procedures v

have developed priorities {Enclosure 1) for the facilities that are schedulaf for licensing consideration of the NRC in the comino months.

The dates indi-cated for 'our receipt of FElNIs findings and determinations are based on th current licensing schedules and should allow time for NRC to publisb its findings in accordance with the regulations (10 CFR 50.47) on the overall state of er:.ergency preparedness.

If changes in priority occur, I will provide you with an updated listing.

If there is a need for additional FBlA assistance, a request will be made by a separate memorandum, specific to a particular nuclear plant.

This.

assistance could include providing testimony and/or witnesses before the Connission, the ltRC Advisory Comittee on Reactor Safeguards, NRC hearing boards and administrative law judges, any court actions, and during any related discovery proceedings.

Receipt of FEflA findings after the dates indicated may result )n.offsite emorgency preparedness being on the critical path for licensing decisions.

I would appreciate your endorsement of these dates in the next week.

If't is not possible for FEIiA to meet this schedule, please provide me with an alternate schedule.

Original Sighed by SheldLn A. Schwa&

Enclosure:

Emergency Preparedness License Schedule s~ososo (

Brian K. Grimes, 'Director Division of Emergency Preparedness Office of Inspection E Enforcement

0 I'

harch 6, 1981 ENCLOSURE, 1

EhERGEllCY PREPAREDNESS LICENSE SCHEDULE A.

OPERATING LICENSE APPLICATIONS FACILITY FEMA

'UE DATE FEt1A REGION Farl ey 2 hcGuire 1/2 Sequoyah 2

Salem 2

Diablo Canyon 1/2 LaSalle 1/2 Summer 1

San Onofre 2/3 Susquehanna 1/2 Zimmer 3/11/81 3/13/81 4/1/81 4/24/81 5/1/81 5/8/81 5/30/81 6/1/81

- 8/1/81 9/15/81 5

3 V

Fermi 2

Grand Gulf Callaway St. Lucie 2 Comanche Peak Shoreham watts Bar Palo Verde 1/2/3 Clinton

! olf Creek Byron

! aterford Nov.

81 Nov.

81 Nov.

81 Hov.

81 H

Dec.

81 Dec.

81 Dec.

81 Jan.

82 Jan.

82 Feb.

82 Feb.

82 liar 82

FACILITY FEtN DUE DATE FEt"A REGION Perry Nidland Catawba

'l(HP 2

So.

Texas River Bend Mar..82 Hay 82 Dun 82 Jun 82 Jul 82 Aug. 82 B.

CONSTRUCTION PERHIT LICENSE APPLICATIONS Pilgrim 2 Aliens Creek Black Fox Jul 1

Aug.

1 Sep.

1

0