ML17083A630

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-275/80-19 & 50-323/80-10 on 800901-30.No Noncompliance Noted
ML17083A630
Person / Time
Site: Diablo Canyon  
Issue date: 10/09/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A631 List:
References
NUDOCS 8010280029
Download: ML17083A630 (4)


See also: IR 05000275/1980019

Text

UNITED STATES

NUCLEAR REGULATORY- COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94595

Docket Nos.

-275

'0-3

Pacific

Gas

and 'Electric Company

77 Beale Street

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1

& 2

This refers to the inspection

conducted

by Mr. T. Young and Mr; M. Bagaglio

of this office on September

1-30,

1980, of activities authorized

by

NRC

Construction

Permit Nos.

CPPR-39

and

CPPR-69,

and to the discussion of our

findings held

by Mr. Young and

Mr . Bagaglio with Mr. Patterson

and other

members of your staf0 at the conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

!lithin these areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

-No items of noncompliancewith

NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section

2.790 of the NRC's

"Rules. of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report contains

any information that you believe to be proprietary, it is

necessary

that you submit

a written application to this office, within 20 days

of'he date of this letter, requesting that such information be withheld from

public disclosure.

The application must include

a full statement of the reasons

why it is claimed that the information is proprietary.

The applicatio'n should

be prepared

so that any proprietary information identified is contained

in an

enclosure

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room,

If we do not hear from you in this

regard within the specified period,

the report will be placed in the Public

Document

Room.

SOXOS90&1

(

Pacific

Gas

and Electric Company

-2-

OCT

g ]99Q

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

"

Sincerely,

Enclosure:

IE Inspection

Report

Nos. 50-275/80-19

and

,50-323/80-10

J.

L. Crews, Chief

Reactor.Operations

and

Nuclear Support

Branch

cc w/o enclosure:

J. 0. Schuyler,

PG&E

J.

D. Shiffer,

PG&E

W. A. Raymond,

PG&E

R. Patterson,

PG&E (Avila Beach)

e