Forwards IE Insp Rept 50-275/80-18 & 50-323/80-09 on 800923-26 & 1003.No Noncompliance Noted
ML17083A626
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/09/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A627 List:
References
NUDOCS 8010280022
Download: ML17083A626 (4)


See also: IR 05000275/1980018

Text

~9 Rfgy

P0

I

oO

I

0

cT

p +~

gO

++*i(+

. UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

OCT

g

tgBO

Docket Nos.

50-275

Pacific

Gas

and Electric Company

77 Beale Street

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane, Jr.

Assistant: General

Counsel

Gentlemen:

0

Subject:

,

NRC Inspection at Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Messrs.

D.

F. Kirsch and

P.

P. Narbut of this office on September

23-26 and October 3,

1980 of

activities authorized

by NRC Construction

Permit Nos.

CPPR-39

and

CPPR-

69,

and to the discussions

of our findings held with Mr.

M. N.

Norem and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described

in the enclosed

inspection report.

ltlithin these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

  • Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and

the enclosed

inspection report will be placed in the NRC's Public Docu-

ment

Room.

If this report contains

any information that you believe to

be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date of this letter,

requesting

that such information be withheld from public disclosure.

The applica-

tion must include

a full statement of the reasons

why it is claimed that

.

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained in an enclosure

to the application,

since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear from'you

in this regard within the specified period,

the report will be placed in

the Public Document

Room,

8 01 0280@gQ

(~>~

0'

Pacific Gas

and Electric Company

-2--

Should you have any questions

concerning'this

inspection

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

Hos. 50-275/80-18

50-323/80-09

cc w/o enclosure:

W. A. Raymond,

PGSE

E.

B. Langely, Jr.,

PG8E

R. Patterson,

PGSE (Avila Beach)

cc w/enclosure:

R.

D. Etzler,

PGSE (Diablo Canyon)

J.

B. Hock,

Pt oject Engineer,

PGSE

~J-.)~-

G.

S.

Spencer,

Chief

Reactor Construction

and

Engineering

Support Branch