Forwards IE Insp Repts 50-275/80-02 & 50-323/80-01 on 800211-14 & 20.No Noncompliance Noted
ML17083A320
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/04/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A321 List:
References
NUDOCS 8004280016
Download: ML17083A320 (4)


See also: IR 05000275/1980002

Text

~P,8 REGS(Ip0

Op

<<) W~

0

C

O

o."

+~*~4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

MAP,

4

198p

Docket Nos.

50-275

50-3

Pacific Gas

and Electric Company

77 8eale Street

San Francisco,

California

94106

Attention:

Mr. Philip A. Crane

Assistant General

Counsel

Gentlemen:

Subject:

NRC Inspection at Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Messrs.

D. F. Kirsch and

P.

J .

Morrill of this office on February

11-14 and 20, 1980 of activities auth-

orized by

NRC Construction

Permit Nos.

CPPR-39

and

CPPR-69,

and to the dis-

cussions of our findings held with Mr. R. D. Etzler and other members of

your staff at the conclusion of each inspection period.

Areas

examined during this inspection

are described

in the enclosed

inspection

repor t.

Within these areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records, inter-

views with personnel,

and observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within the

scope of this inspection.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the

NRC s Public Document

Room. If

this report contains

any information that you believe to be proprietary,

it is necessary

that you submit

a written application to this office, within

20 days of the date of this letter, requesting that such information be

withheld from public disclosure.

The application must include

a full state-

ment of the reasons

why it is claimed that the information is proprietary.

The application should

be prepared

so that any proprietary information ident-

ified is contained in an enclosure

to the application,

since the application

without the enclosure will also

be placed in the Public Document

Room.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document

Room.

8004280 Q g

Pacific Gas

and Electric

Company

-2-

hiAR

~ l9SO

Should you have any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection Report

Nos. 50-275/80-02

50-323/80-01

cc w/o enclosure:

W. A, Raymond,

PGSE

E. B. Langley, Jr.,

PGSE

R.

D. Ramsay,

PG8E

(Avila Beach)

cc w/enclosure:

R. D. Etzler,

PGSE (Diablo Canyon)

J.

B. Hoch, Project Engineer,

PGSE

~H"=

G.'. Spencer,

Chief

Reactor Construction

and

Engineering Support

Branch