NRR-PMDAPEm Resource From: Goetz, Sujata Sent: Monday, March 13, 2017 1:58 PM To: asselind1@michigan.gov Cc: Yalek@michigan.gov
Subject:
NRC Issuance of an Expedited Amendment Associated with Emergency Core Cooling System Attachments: March132017 FRN.pdf Mr. Asselin, The Nuclear Regulatory Commission (NRC) is in the process of approving a license amendment request from DTE Electric Company, for Fermi 2.
The proposed amendment would add footnotes indicating that the injection functions of "Drywell Pressure - High" for High Pressure Coolant Injection (HPCI) and "Manual Initiation" for HPCI and RCIC are not required to be operable under low reactor pressure conditions. The NRC staffs proposed no significant hazard consideration determination was published in the Federal Register on March 13 (82 FR 13512).
Please let me know if you have any comments on this action. I can be reached at 301-415-8004.
- Thanks, Sue Sujata Goetz Project Manager, Fermi, Unit 2 Nuclear Regulatory Commission 11555 Rockville Pike Office of the Nuclear Reactor Regulation NRC/NRR/DORL/LP3 Mailroom, 08C10 Rockville, MD 20852-2738 Washington, DC 20555-0001 (o) 301.415.8004 (fax) 301.415.3313 (fax)
Mail Stop 08D15 1
Hearing Identifier: NRR_PMDA Email Number: 3396 Mail Envelope Properties (Sujata.Goetz@nrc.gov20170313135700)
Subject:
NRC Issuance of an Expedited Amendment Associated with Emergency Core Cooling System Sent Date: 3/13/2017 1:57:56 PM Received Date: 3/13/2017 1:57:00 PM From: Goetz, Sujata Created By: Sujata.Goetz@nrc.gov Recipients:
"Yalek@michigan.gov" <Yalek@michigan.gov>
Tracking Status: None "asselind1@michigan.gov" <asselind1@michigan.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 993 3/13/2017 1:57:00 PM March132017 FRN.pdf 214263 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
13512 Federal Register / Vol. 82, No. 47 / Monday, March 13, 2017 / Notices III. Backfitting and Issue Finality 10 CFR part 52with certain exceptions for high-pressure coolant injection This preliminary draft guidance discussed in the next paragraphwere (HPCI) and Manual Initiation for would set forth a set of security design intended to apply to every NRC action HPCI and RCIC are not required to be considerations that a designer should which substantially changes the operable under low reactor pressure consider while developing the facility expectations of current and future conditions.
design. These considerations, if applicants. Therefore, this guidance, if DATES: Submit comments by April 12, adequately implemented through finalized and imposed on applicants, 2017. Requests for a hearing or petition detailed design, along with the adequate would not represent backfitting (except for leave to intervene must be filed by implementation of administrative as discussed below). May 12, 2017.
controls and security programs, are one The exceptions to the general ADDRESSES: Please refer to Docket ID way to protect a nuclear power reactor principle are applicable whenever a combined license applicant references a NRC-2017-0072 when contacting the against the design basis threat for NRC about the availability of radiological sabotage. These 10 CFR part 52 license (i.e., an early site permit or a manufacturing license) and/ information regarding this document.
considerations do not limit designers or You may obtain publicly-available applicants from applying other methods or 10 CFR part 52 regulatory approval (i.e., a design certification rule or information related to this document or approaches in designing engineered using any of the following methods:
standard design approval). The NRC systems to perform intended security
- Federal Rulemaking Web site: Go to functions. does not, at this time, intend to impose http://www.regulations.gov and search The purpose of this preliminary draft the positions represented in this for Docket ID NRC-2017-0072. Address guidance is to assist the NRC staff and preliminary draft guidance in a manner questions about NRC dockets to Carol future applicants. The security design that is inconsistent with any issue Gallagher; telephone: 301-415-3463; considerations are not regulatory finality provisions in the 10 CFR part 52 email: Carol.Gallagher@nrc.gov. For requirements. Parts 50 and 52 of title 10 licenses and regulatory approvals. If, in technical questions, contact the project of the Code of Federal Regulations (10 the future, the NRC seeks to impose a manager listed in the FOR FURTHER CFR), require that an application for an position in this guidance in a manner INFORMATION CONTACT section of this operating license, design certification, which does not provide issue finality as document.
combined license, standard design described in the applicable issue finality
- Mail comments to: Cindy Bladey, approval, or manufacturing license, provision, then the NRC must address Office of Administration, Mail Stop:
describe how the proposed facility the criteria for avoiding issue finality as OWFN-12-H08, U.S. Nuclear would comply with the physical and described in the applicable issue finality Regulatory Commission, Washington, cyber security requirements in §§ 73.55 provision.
DC 20555-0001.
and 54, respectively. The security Dated at Rockville, Maryland, this 3rd day For additional direction on obtaining design considerations provide guidance of March, 2017. information and submitting comments, intended to support the resolution of For the Nuclear Regulatory Commission. see Obtaining Information and security issues through the facility Michael E. Mayfield, Submitting Comments in the design. Deputy Director (Acting), Office of New SUPPLEMENTARY INFORMATION section of This preliminary draft guidance, if Reactors. this document.
finalized, for example, in a regulatory [FR Doc. 2017-04873 Filed 3-10-17; 8:45 am] FOR FURTHER INFORMATION CONTACT:
guide, would not constitute backfitting BILLING CODE 7590-01-P Sujata Goetz, Office of Nuclear Reactor as defined in 10 CFR 50.109 (the Backfit Regulation, U.S. Nuclear Regulatory Rule) and would not otherwise be Commission, Washington, DC 20555-inconsistent with the issue finality NUCLEAR REGULATORY 0001; telephone: 301-415-8004, email:
provisions in 10 CFR part 52, Licenses, COMMISSION Sujata.Goetz@NRC.gov.
Certifications and Approvals for Nuclear
[Docket No. 50-341; NRC-2017-0072] SUPPLEMENTARY INFORMATION:
Power Plants. This guidance, if finalized, would represent the first NRC DTE Electric Company; Fermi, Unit 2 I. Obtaining Information and guidance on this subject. Issuance of Submitting Comments new guidance, by itself, does not AGENCY: Nuclear Regulatory represent backfitting unless the NRC Commission. A. Obtaining Information intends to impose the guidance on ACTION: License amendment application; Please refer to Docket ID NRC-2017-existing licensees and currently- opportunity to comment, request a 0072 when contacting the NRC about approved design certification rules hearing, and petition for leave to the availability of information for this issued under 10 CFR part 52. The NRC intervene. action. You may obtain publicly-does not have such an intention. available information related to this Existing licensees and applicants of
SUMMARY
- The U.S. Nuclear Regulatory action by any of the following methods:
final design certification rules would Commission (NRC) is considering
- Federal Rulemaking Web site: Go to not be required to comply with this issuance of an amendment to Renewed http://www.regulations.gov and search guidance, unless the licensee or design Facility Operating License No. NPF-43, for Docket ID NRC-2017-0072.
certification rule applicant seeks a issued to DTE Electric Company (DTE),
- NRCs Agencywide Documents voluntary change to its licensing basis for operation of the Fermi, Unit 2. The Access and Management System with respect to resolving security proposed amendment revises technical (ADAMS): You may obtain publicly-mstockstill on DSK3G9T082PROD with NOTICES matters through facility design. specifications (TS) for emergency core available documents online in the Applicants and potential applicants cooling system (ECCS) instrumentation ADAMS Public Documents collection at are not, with certain exceptions, (TS 3.3.5.1) and reactor core isolation http://www.nrc.gov/reading-rm/
protected by either the Backfit Rule or cooling (RCIC) system instrumentation adams.html. To begin the search, select any issue finality provisions under 10 (TS 3.3.5.2). The proposed changes add ADAMS Public Documents and then CFR part 52. Neither the Backfit Rule footnotes indicating that the injection select Begin Web-based ADAMS nor the issue finality provisions under functions of Drywell PressureHigh Search. For problems with ADAMS, VerDate Sep<11>2014 17:49 Mar 10, 2017 Jkt 241001 PO 00000 Frm 00085 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1
Federal Register / Vol. 82, No. 47 / Monday, March 13, 2017 / Notices 13513 please contact the NRCs Public Before any issuance of the proposed The proposed changes do not alter the Document Room (PDR) reference staff at license amendment, the NRC will need protection system design, create new failure 1-800-397-4209, 301-415-4737, or by to make the findings required by the modes, or change any modes of operation.
The proposed changes do not involve a email to pdr.resource@nrc.gov. The Atomic Energy Act of 1954, as amended physical alteration of the plant, and no new License Amendment Request to Revise (the Act), and NRCs regulations. or different kind of equipment will be Technical Specifications for Emergency The NRC has made a proposed installed. Consequently, there are no new Core Cooling System Instrumentation determination that the license initiators that could result in a new or and Reactor Core Isolation Cooling amendment request involves no different kind of accident.
System Instrumentation is available in significant hazards consideration. Under Therefore, the proposed changes do not ADAMS under Accession No. the NRCs regulations in § 50.92 of title create the possibility of a new or different ML17055A365. 10 of the Code of Federal Regulations kind of accident from any accident
- NRCs PDR: You may examine and (10 CFR), this means that operation of previously evaluated.
the facility in accordance with the 3. Does the proposed change involve a purchase copies of public documents at significant reduction in a margin of safety?
the NRCs PDR, Room O1-F21, One proposed amendment would not (1)
Response: No.
White Flint North, 11555 Rockville involve a significant increase in the The proposed changes have no adverse Pike, Rockville, Maryland 20852. probability or consequences of an effect on plant operation. The plant response accident previously evaluated; or (2) to the design basis accidents does not change.
B. Submitting Comments create the possibility of a new or The proposed changes do not adversely affect Please include Docket ID NRC-2017- different kind of accident from any existing plant safety margins or the reliability 0072 in the subject line of your accident previously evaluated; or (3) of the equipment assumed to operate in the comment submission, in order to ensure involve a significant reduction in a safety analyses. There is no change being margin of safety. As required by 10 CFR made to safety analysis assumptions, safety that the NRC is able to make your limits or limiting safety system settings that comment submission available to the 50.91(a), the licensee has provided its would adversely affect plant safety as a result public in this docket. analysis of the issue of no significant of the proposed changes.
The NRC cautions you not to include hazards consideration, which is Therefore, the proposed changes do not identifying or contact information that presented below: involve a significant reduction in a margin of you do not want to be publicly 1. Does the proposed change involve a safety.
disclosed in your comment submission. significant increase in the probability or The NRC staff has reviewed the The NRC posts all comment consequences of an accident previously licensees analysis and, based on this submissions at http:// evaluated?
Response: No.
review, it appears that the three www.regulations.gov as well as entering standards of 10 CFR 50.92(c) are The proposed changes involve the addition the comment submissions into ADAMS. of clarifying footnotes to the HPCI [High satisfied. Therefore, the NRC staff The NRC does not routinely edit Pressure Cooling Injection] and RCIC proposes to determine that the license comment submissions to remove [Reactor Core Isolation Cooling] actuation amendment request involves a no identifying or contact information. instrumentation TS [Technical Specification] significant hazards consideration.
If you are requesting or aggregating to reflect the as-built plant design and The NRC is seeking public comments comments from other persons for operability requirements of HPCI and RCIC on this proposed determination that the submission to the NRC, then you should instrumentation as described in the Fermi 2 license amendment request involves no UFSAR [Updated Final Safety Analysis inform those persons not to include Report].
significant hazards consideration. Any identifying or contact information that HPCI is an initiator of the increase in comments received within 30 days after they do not want to be publicly reactor coolant inventory accident in UFSAR the date of publication of this notice disclosed in their comment submission. (Reference 7.1) Section 15.5.1. However, the will be considered in making any final Your request should state that the NRC accident assumes inadvertent manual startup determination.
does not routinely edit comment of HPCI. The change being requested in this Normally, the Commission will not submissions to remove such information amendment is administrative in nature and issue the amendment until the before making the comment does not make any changes to the HPCI expiration of 60 days after the date of system or procedures that would increase the submissions available to the public or publication of this notice. The probability for inadvertent manual startup of entering the comment submissions into HPCI. RCIC is not an initiator of any accident Commission may issue the license ADAMS. previously evaluated. As a result, the amendment before expiration of the 60-probability of any accident previously day notice period if the Commission II. Introduction evaluated is not increased. In addition, the concludes the amendment involves no The NRC is considering issuance of an manual initiation of HPCI and RCIC are not significant hazards consideration. In amendment to Renewed Facility credited to mitigate the consequences of addition, the Commission may issue the Operating License No. NFP-43, issued design basis accidents or transients within amendment prior to the expiration of the current Fermi 2 design and licensing to DTE, for operation of the Fermi, Unit the 30-day comment period if basis and automatic actuation of the HPCI 2, located in Monroe County, Michigan. system on the high drywell pressure signal is circumstances change during the 30-day The proposed amendment requests not required for the HPCI to perform its comment period such that failure to act modification of the TSs for emergency system safety functions in mitigating the in a timely way would result, for core cooling system (ECCS) consequences of a LOCA initiating at low example, in derating or shutdown of the instrumentation (TS 3.3.5.1) and reactor reactor pressure. facility. If the Commission takes action core isolation cooling (RCIC) system Therefore, the proposed changes do not prior to the expiration of either the mstockstill on DSK3G9T082PROD with NOTICES instrumentation (TS 3.3.5.2). The involve a significant increase in the comment period or the notice period, it probability or consequences of an accident proposed changes add footnotes will publish in the Federal Register a previously evaluated.
indicating that the injection functions of 2. Does the proposed change create the notice of issuance. If the Commission Drywell PressureHigh for HPCI and possibility of a new or different kind of makes a final no significant hazards Manual Initiation for HPCI and RCIC accident from any accident previously consideration determination, any are not required to be operable under evaluated? hearing will take place after issuance.
low reactor pressure conditions. Response: No. The Commission expects that the need VerDate Sep<11>2014 17:49 Mar 10, 2017 Jkt 241001 PO 00000 Frm 00086 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1
13514 Federal Register / Vol. 82, No. 47 / Monday, March 13, 2017 / Notices to take this action will occur very the proceeding. The contention must be Electronic Submissions (E-Filing) infrequently. one which, if proven, would entitle the section of this document, and should petitioner to relief. A petitioner who meet the requirements for petitions set Opportunity To Request a Hearing and fails to satisfy the requirements at 10 forth in this section. Alternatively, a Petition for Leave To Intervene CFR 2.309(f) with respect to at least one State, local governmental body, Within 60 days after the date of contention will not be permitted to Federally-recognized Indian Tribe, or publication of this notice, any persons participate as a party. agency thereof may participate as a non-(petitioner) whose interest may be Those permitted to intervene become party under 10 CFR 2.315(c).
affected by this action may file a request parties to the proceeding, subject to any If a hearing is granted, any person for a hearing and petition for leave to limitations in the order granting leave to who is not a party to the proceeding and intervene (petition) with respect to the intervene. Parties have the opportunity is not affiliated with or represented by action. Petitions shall be filed in to participate fully in the conduct of the a party may, at the discretion of the accordance with the Commissions hearing with respect to resolution of presiding officer, be permitted to make Agency Rules of Practice and that partys admitted contentions, a limited appearance pursuant to the Procedure in 10 CFR part 2. Interested including the opportunity to present provisions of 10 CFR 2.315(a). A person persons should consult a current copy evidence, consistent with the NRCs making a limited appearance may make of 10 CFR 2.309. The NRCs regulations regulations, policies, and procedures. an oral or written statement of his or her are accessible electronically from the Petitions must be filed no later than position on the issues but may not NRC Library on the NRCs Web site at 60 days from the date of publication of otherwise participate in the proceeding.
http://www.nrc.gov/reading-rm/doc- this notice. Petitions and motions for A limited appearance may be made at collections/cfr/. Alternatively, a copy of leave to file new or amended any session of the hearing or at any the regulations is available at the NRCs contentions that are filed after the prehearing conference, subject to the Public Document Room, located at One deadline will not be entertained absent limits and conditions as may be White Flint North, Room O1-F21, 11555 a determination by the presiding officer imposed by the presiding officer. Details Rockville Pike (first floor), Rockville, that the filing demonstrates good cause regarding the opportunity to make a Maryland 20852. If a petition is filed, by satisfying the three factors in 10 CFR limited appearance will be provided by the Commission or a presiding officer 2.309(c)(1)(i) through (iii). The petition the presiding officer if such sessions are will rule on the petition and, if must be filed in accordance with the scheduled.
appropriate, a notice of a hearing will be filing instructions in the Electronic issued. Submissions (E-Filing) section of this Electronic Submissions (E-Filing)
As required by 10 CFR 2.309(d) the document. All documents filed in NRC petition should specifically explain the If a hearing is requested, and the adjudicatory proceedings, including a reasons why intervention should be Commission has not made a final request for hearing and petition for permitted with particular reference to determination on the issue of no leave to intervene (petition), any motion the following general requirements for significant hazards consideration, the or other document filed in the standing: (1) The name, address, and Commission will make a final proceeding prior to the submission of a telephone number of the petitioner; (2) determination on the issue of no request for hearing or petition to the nature of the petitioners right under significant hazards consideration. The intervene, and documents filed by the Act to be made a party to the final determination will serve to interested governmental entities that proceeding; (3) the nature and extent of establish when the hearing is held. If the request to participate under 10 CFR the petitioners property, financial, or final determination is that the 2.315(c), must be filed in accordance other interest in the proceeding; and (4) amendment request involves no with the NRCs E-Filing rule (72 FR the possible effect of any decision or significant hazards consideration, the 49139; August 28, 2007, as amended at order which may be entered in the Commission may issue the amendment 77 FR 46562, August 3, 2012). The E-proceeding on the petitioners interest. and make it immediately effective, Filing process requires participants to In accordance with 10 CFR 2.309(f), notwithstanding the request for a submit and serve all adjudicatory the petition must also set forth the hearing. Any hearing would take place documents over the internet, or in some specific contentions which the after issuance of the amendment. If the cases to mail copies on electronic petitioner seeks to have litigated in the final determination is that the storage media. Detailed guidance on proceeding. Each contention must amendment request involves a making electronic submissions may be consist of a specific statement of the significant hazards consideration, then found in the Guidance for Electronic issue of law or fact to be raised or any hearing held would take place Submissions to the NRC and on the NRC controverted. In addition, the petitioner before the issuance of the amendment Web site at http://www.nrc.gov/site-must provide a brief explanation of the unless the Commission finds an help/e-submittals.html. Participants bases for the contention and a concise imminent danger to the health or safety may not submit paper copies of their statement of the alleged facts or expert of the public, in which case it will issue filings unless they seek an exemption in opinion which support the contention an appropriate order or rule under 10 accordance with the procedures and on which the petitioner intends to CFR part 2. described below.
rely in proving the contention at the A State, local governmental body, To comply with the procedural hearing. The petitioner must also Federally-recognized Indian Tribe, or requirements of E-Filing, at least 10 provide references to the specific agency thereof, may submit a petition to days prior to the filing deadline, the sources and documents on which the the Commission to participate as a party participant should contact the Office of mstockstill on DSK3G9T082PROD with NOTICES petitioner intends to rely to support its under 10 CFR 2.309(h)(1). The petition the Secretary by email at position on the issue. The petition must should state the nature and extent of the hearing.docket@nrc.gov, or by telephone include sufficient information to show petitioners interest in the proceeding. at 301-415-1677, to (1) request a digital that a genuine dispute exists with the The petition should be submitted to the identification (ID) certificate, which applicant or licensee on a material issue Commission by May 12, 2017. The allows the participant (or its counsel or of law or fact. Contentions must be petition must be filed in accordance representative) to digitally sign limited to matters within the scope of with the filing instructions in the submissions and access the E-Filing VerDate Sep<11>2014 17:49 Mar 10, 2017 Jkt 241001 PO 00000 Frm 00087 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1
Federal Register / Vol. 82, No. 47 / Monday, March 13, 2017 / Notices 13515 system for any proceeding in which it documents electronically must file an Attorney for licensee: Jon P.
is participating; and (2) advise the exemption request, in accordance with Christinidis, Expert Attorney Secretary that the participant will be 10 CFR 2.302(g), with their initial paper Regulatory, DTE Energy, 688 WCB, One submitting a petition or other filing stating why there is good cause for Energy Plaza, Detroit, MI 48226.
adjudicatory document (even in not filing electronically and requesting Acting NRC Branch Chief: Kimberly J.
instances in which the participant, or its authorization to continue to submit Green.
counsel or representative, already holds documents in paper format. Such filings Dated at Rockville, Maryland, this 7th day an NRC-issued digital ID certificate). must be submitted by: (1) First class of March 2017.
Based upon this information, the mail addressed to the Office of the For the Nuclear Regulatory Commission.
Secretary will establish an electronic Secretary of the Commission, U.S. Sujata Goetz, docket for the hearing in this proceeding Nuclear Regulatory Commission, Project Manager, Division of Operating if the Secretary has not already Washington, DC 20555-0001, Attention:
Reactor Licensing, Office of New Reactor established an electronic docket. Rulemaking and Adjudications Staff; or Regulation.
Information about applying for a (2) courier, express mail, or expedited
[FR Doc. 2017-04874 Filed 3-10-17; 8:45 am]
digital ID certificate is available on the delivery service to the Office of the BILLING CODE 7590-01-P NRCs public Web site at http:// Secretary, 11555 Rockville Pike, www.nrc.gov/site-help/e-submittals/ Rockville, Maryland, 20852, Attention:
getting-started.html. Once a participant Rulemaking and Adjudications Staff.
NUCLEAR REGULATORY has obtained a digital ID certificate and Participants filing adjudicatory COMMISSION a docket has been created, the documents in this manner are participant can then submit responsible for serving the document on [NRC-2015-0229]
adjudicatory documents. Submissions all other participants. Filing is must be in Portable Document Format considered complete by first-class mail Design of Structures, Components, (PDF). Additional guidance on PDF as of the time of deposit in the mail, or Equipment, and Systems submissions is available on the NRCs by courier, express mail, or expedited AGENCY: Nuclear Regulatory public Web site at http://www.nrc.gov/ delivery service upon depositing the Commission.
site-help/electronic-sub-ref-mat.html. A document with the provider of the ACTION: Standard review plan-final filing is considered complete at the time service. A presiding officer, having the document is submitted through the section revision; issuance.
granted an exemption request from NRCs E-Filing system. To be timely, an using E-Filing, may require a participant
SUMMARY
- The U.S. Nuclear Regulatory electronic filing must be submitted to or party to use E-Filing if the presiding Commission (NRC) is issuing a final the E-Filing system no later than 11:59 officer subsequently determines that the revision to sections in Chapter 3, p.m. Eastern Time on the due date. reason for granting the exemption from Design of Structures, Components, Upon receipt of a transmission, the E- use of E-Filing no longer exists. Equipment, and Systems Reactor Filing system time-stamps the document Documents submitted in adjudicatory Coolant System and Connected and sends the submitter an email notice proceedings will appear in the NRCs Systems of NUREG-0800, Standard confirming receipt of the document. The electronic hearing docket which is Review Plan for the Review of Safety E-Filing system also distributes an email available to the public at https:// Analysis Reports for Nuclear Power notice that provides access to the adams.nrc.gov/ehd, unless excluded Plants: LWR Edition. The changes to document to the NRCs Office of the pursuant to an order of the Commission these Standard Review Plan (SRP)
General Counsel and any others who or the presiding officer. If you do not sections reflect responses to public have advised the Office of the Secretary have an NRC-issued digital ID certificate comments and additional guidance that they wish to participate in the as described above, click cancel when based on current NRC staff review proceeding, so that the filer need not the link requests certificates and you methods and practices based on lessons serve the document on those will be automatically directed to the learned from the NRCs reviews of participants separately. Therefore, NRCs electronic hearing dockets where design certification and combined applicants and other participants (or you will be able to access any publicly license applications completed since the their counsel or representative) must available documents in a particular last revision of this chapter.
apply for and receive a digital ID hearing docket. Participants are certificate before adjudicatory requested not to include personal DATES: The effective date of this documents are filed so that they can privacy information, such as social Standard Review Plan (SRP) update is obtain access to the documents via the security numbers, home addresses, or April 12, 2017.
E-Filing system. personal phone numbers in their filings, ADDRESSES: Please refer to Docket ID A person filing electronically using unless an NRC regulation or other law NRC-2015-0229 when contacting the the NRCs adjudicatory E-Filing system requires submission of such NRC about the availability of may seek assistance by contacting the information. For example, in some information regarding this document.
NRCs Electronic Filing Help Desk instances, individuals provide home You may obtain publicly-available through the Contact Us link located addresses in order to demonstrate information related to this document on the NRCs public Web site at http:// proximity to a facility or site. With using any of the following methods:
www.nrc.gov/site-help/e- respect to copyrighted works, except for
- Federal Rulemaking Web site: Go to submittals.html, by email to limited excerpts that serve the purpose http://www.regulations.gov and search MSHD.Resource@nrc.gov, or by a toll- for Docket ID NRC-2015-0229. Address mstockstill on DSK3G9T082PROD with NOTICES of the adjudicatory filings and would free call at 1-866-672-7640. The NRC constitute a Fair Use application, questions about NRC dockets to Carol Electronic Filing Help Desk is available participants are requested not to include Gallagher; telephone: 301-415-3463; between 9 a.m. and 6 p.m., Eastern copyrighted materials in their email: Carol.Gallagher@nrc.gov. For Time, Monday through Friday, submission. technical questions, contact the excluding government holidays. For further details with respect to this individuals listed in the FOR FURTHER Participants who believe that they action, see the application for license INFORMATION CONTACT section of this have a good cause for not submitting amendment dated February 23, 2017. document.
VerDate Sep<11>2014 17:49 Mar 10, 2017 Jkt 241001 PO 00000 Frm 00088 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1