VA4 J4N% JW 4
cs
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9803310042
DOC.DATE: 98/03/20
NOTARIZED: NO
DOCKET
FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1,.Niagara
Powe
05000220
50-410 Nine Mile Point Nuclear Station,
Unit 2, Niagara
Moha
05000410
AUTH.NAME
AUTHOR AFFILIATION
DOERFLEIN,L.T.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
MUELLER,J.H.
Niagara
Mohawk Power Corp.
SUBJECT: Forwards insp repts 50-220/98-01
&, 50-410/98-01
on 980104-
0214.Violations noted. Good performance
noted in
identification
& response
to reactor fuel leak at Unit 2.
D1STRIBUTION CODE: IEOIT
COPIES
RECEIVED:LTR
(
ENCL
(
SIEE:
3 ~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
C
RECIPIENT
ID CODE/NAME
PD1-1
INTERNAL: ACRS
FILE CNNT~
~CB
NUDOCS -ABSTRACT
OGC/HDS3
ERNAL
LITCO BRYCE P J H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
HOOD,D
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN1
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1,
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTRO
DESK
(DCD)
ON EXTENSION 415-2083
FULL TEXT CONVERSION REQUIRED
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
h
March 20,
1998
Mr'. John H. Mueller
Chief Nuclear Officer
Niagara Mohawk Power Corporation
Nine Mile Point Nuclear Station
Operations Building, 2nd Floor
P.O. Box 63
Lycoming, NY 13093
SUBJECT:
NRC INSPECTION REPORT NOS. 50-220/98-01 AND 50-410/98-01
Dear Mr. Mueller:
This report transmits the findings of safety inspections conducted by NRC inspectors at the
Nine Mile Point Nuclear Station, Units
1 and 2, from January 4 through February 14, 1998.
At the conclusion of the inspection, the findings were discussed with you, and members of
your staff.
During this period, your staff operated both units safely.
Good performance was noted in
the identification and response to a reactor fuel leak at Unit 2. During this period, a Unit 1
system engineer demonstrated
good integrated plant awareness
in identifying that
maintenance
on a service water valve in the reactor building violated secondary
containment integrity. Additionally, your engineering staff took timely and appropriate
actions in response to two industry concerns related to potentially defective equipment.
However, the NRC identified that your staff appeared to have accepted
several old
deficient conditions at Unit 1, in lieu of correcting them or performing the appropriate
engineering analyses to accept them as-is.
Specific examples include:
(1) numerous catch
containments which were no longer required or did not have the required engineering
evaluations for "permanent" installation; and (2) a longstanding holdout on a "failed-open"
temperature control valve for the control room emergency ventilation system, for which an
, engineering evaluation was not performed to determine if continued operation with the
degraded component was acceptable.
Based on the results of this inspection, the NRC has determined that violations of NRC
requirements occurred.
These violations are cited in the enclosed Notice of Violation
(Notice) and the circumstances
surrounding them are described in detail in the subject
inspection report.
Specifically, the violations involve the following: (1) surveillance testing
did not adequately ensure Unit 1 liquid poison system functionality; and (2) an engineering
evaluation had not been performed, nor was an unreviewed safety question determination
made, to assess
the impact that a failed temperature control valve had on the Unit 1
control room emergency ventilation system.
'78033%0042
980320
ADQCK 05000220
6'DR
OFFICIAL RECORD
COPY
IE: 61
1
S
Mr. John H. Mueller
The responses
directed by this letter and the enclosed Notice are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter,
its enclosures,
and your r'esponse will be placed in the NRC Public Document Room.
Sincerely,
Original Signed
by:
Lawrence T. Doerflein, Chief
Projects Branch
1
Division of Reactor Projects
Docket Nos.
License Nos.
50-220, 50-410
Enclosures:
2.
NRC Inspection Report Nos. 50-220/98-01 and 50-410/98-01
cc w/enclosures:
G. Wilson, Senior Attorney
M. Wetterhahn, Winston and Strawn
J. Rettberg, New York State Electric and Gas Corporation
P. Eddy, Electric Division, Department of Public Service, State of New York
C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law
J. Vinquist, MATS, Inc.
F. Valentino, President, New York State Energy Research
and Development Authority
J. Spath, Program Director, New York State Energy Research
and Development Authority
l
+ ~
0
Mr. John H. Mueller
Distribution w/encls:
H. Miller, RA/W. Axelson, DRA (1)
Region
I Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
PUBLIC
NRC Resident Inspector
L. Doerflein, DRP
R. Junod, DRP
Distribution w/encls:
(VIAE-MAIL)
B. McCabe, Rl EDO Coordinator
B. Norris - Nine Mile Point
S. Bajwa, NRR
D. Hood, NRR
M. Campion, Rl
Inspection Program Branch (IPAS)
R. Correia, NRR
F. Talbot, NRR
DOCDESK
DOCUMENT NAME: G:iBRANCH1iNM9801.INS
To receive a copy of this document, indicate in the box:
C
~ Copy without attachment/enclosure
E
~ Copy with attachment/enclosure
"N" ~ No copy
OFFICE
Rl/DRP
E
RI/DRP
E
NAME
DATE
BNorris
03f+ /98
LDoerflein
03/g5 /98
OFFICIAL RECORD COPY