ML17059B904

From kanterella
Jump to navigation Jump to search
Provides Results of EPR Testing & Tensile Specimen Testing, Expected Schedules for Submittal of Fracture Toughness Testing Results 7 Evaluation of Shroud Fluence Measurement Results.Proprietary Rept Encl
Date released: 06/30/2017 Download: ML17059B904


Rev 0 to Technical Rept 97181-TR-03, EPR Testing of Boat Samples from Core Shroud Vertical Welds V-9 & V-10 at NMP Unit 1.
ML18040A330
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1998
From: Rich Smith, David Williams
ALTRAN CORP.
To:
References
Download: ML18040A330 (85)
Rev 0 to Technical Rept 97181-TR-02,Vol 1 to Interpretive Metallurgical Rept on Core Shroud Vertical Weld Boat Samples from NMP Unit 1.
ML17059B907
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1998
From: Rich Smith, David Williams
ALTRAN CORP.
To:
References
Download: ML17059B907 (36)
Non-proprietary Rev 0 to GE-NE-523-B13-01869-113NP, Assessment of Crack Growth Rates Applicable to NMP Unit 1 Vertical Weld Indications.
ML17059B906
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1998
From: Caine T, Horn R, Ranganath S
GENERAL ELECTRIC CO.
To:
References
Download: ML17059B906 (64)
NMP Unit 1 Boat Samples Analyses Part Iii:Tension Tests, RDD:98:55863-004-000:01
ML17059B905
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1998
From: Ferrell L, Hour K
External (Affiliation Not Assigned)
To:
References
Download: ML17059B905 (118)
Provides Results of EPR Testing & Tensile Specimen Testing, Expected Schedules for Submittal of Fracture Toughness Testing Results 7 Evaluation of Shroud Fluence Measurement Results.Proprietary Rept Encl
ML17059B903
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/27/1998
From: Conway J
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17059B903 (26)