L December 16 997 LICENSEE:
Niagara Mohawk Power Corporation FACILITY:
SUBJECT Nine Mile Point Nuclear Station, Unit No. 2
SUMMARY
OF TELEPHONE CONVERSATION OF DECEMBER 11, 1997, REQUESTING ADDITIONALINFORMATIONON PROPOSED INSTALLATION OF NUCLEAR MEASUREMENTANALYSISAND CONTROL POWER RANGE NEUTRON MONITOR SYSTEM (TAC NO. MA0150)
On December 11, 1997, I called Ms. L. Otman of Niagara Mohawk Power Corporation (NMPC) and stated that the NRC staff needed additional information to complete the review of the application for amendment, dated October 31, 1997, for Nine Mile Point, Unit 2. Under the proposed amendment, NMPC would install the General Electric Nuclear Measurement Analysis and Control power range neutron monitor system, consistent with NMPC's response to Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors."
Accordingly, I faxed the enclosure to Ms. Otman, who subsequently acknowledged receiving it.
Sincerely, Original Signed by:
Docket No. 50-410
Enclosures:
Request for Additional Information cc w/encls:
See next page DISTRIBUTION:
Darl S. Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
, Docket File PUBLIC PDI-1 R/F B. Boger S.
Bajwa S. Little D. Hood OGC ACRS C. Hehl, Region I
AA3i DOCUMENT NAME:G:iNMP2)MA0150.RAI To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"= No co OFFICE PM:PDI-1 E
LA:PDI-D:PDI-1 HAME DHood SLittI SBaiMa DATE 12/
/97 12/
/97 12/ 0/97 Official Record Copy 9712$ 100iS 971216
~l
)
PDR ADQCK 0500045.0 P
PDR 3.
IIIIIIIIIIIIIIIII,IIIIIIIII IIIIIIIIIIII
0 (I
gP,R 0E00 (4
+~
~o
~
Cy A
C 0
I CO0 gO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 December 16, 1997 LICENSEE:
Niagara Mohawk Power Corporation FACILITY:
Nine Mile Point Nuclear Station, Unit No. 2
SUBJECT:
SUMMARY
OF TELEPHONE CONVERSATION OF DECEMBER 11, 1997, REQUESTING ADDITIONALINFORMATIONON PROPOSED INSTALLATION OF NUCLEAR MEASUREMENTANALYSISANDCONTROL POWER RANGE NEUTRON MONITOR SYSTEM (TAC NO. MA0150)
On December 11, 1997, I called Ms. L. Otman of Niagara Mohawk Power Corporation (NMPC) and stated that the NRC staff needed additional information to complete the review of the application for amendment, dated October 31, 1997, for Nine Mile Point, Unit 2. Under the proposed amendment, NMPC would install the General Electric Nuclear Measurement Analysis and Control power range neutron monitor system, consistent with NMPC's response to Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors."
Accordingly, I faxed the enclosure to Ms. Otman, who subsequently acknowledged receiving it.
Sincerely, Docket No. 50<10
Enclosure:
Request for Additional Information cc w/encl: See next page Dart S. Hood, Senior Project Manager Project Directorate l-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
e 0
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No. 2 Mr. Richard B. Abbott Vice President and General Manager Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Mr. Carl D. Terry Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation P.O. Box 63 Lycoming, NY 13093 Ms. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Mr. Kim A. Dahlberg Vice President-Nuclear Operations Acting Unit 2 Plant Manager Nine Mile Point Nuclear Station P.O. Box 63 Lycoming, NY 13093 Mr. John T. Conway Vice President-Nuclear Engineering Nine Mile Point Nuclear Station Niagara Mohawk Power Corporation P.O. Box 63 Lycoming, NY 13093 Regional Administrator, Region I
U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector Nine Mile Point Nuclear Station P.O. Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Richard M. Kessel Chair and Executive Director State Consumer Protection Board 99 Washington Avenue Albany, NY 12210 Mark J. Wetterhahn, Esquire Winston &Strawn 1400 L Street, NW.
Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West Syracuse,, NY 13202 Mr. F. WilliamValentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Richard Goldsmith Syracuse University College of Law E. I. White Hall Campus
- Syracuse, NY 12223 Mr. John V. Vinquist, MATS Inc.
P.O. Box 63 Lycoming, NY 13093
(
C
B. Ralph Sylvia Niagara Mohawk Power Corporation CC:
Nine Mile Point Nuclear Station Unit No. 2 Mr. Jim Rettberg New York State Electric & Gas Corporation Corporate Drive Kirkwood Industrial Park P.O. Box 5224 Binghamton, NY 13902-5224
I
REQUEST FOR ADDITIONALINFORMATION The following questions address the General Electric (GE) Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC-PRNM)system upgrade in Nine Mile Point Unit 2:
References:
1.
"Application for Amendment to Nine Mile Point Unit 2 (NMP2) Operating License NPF-69,"
Niagara Mohawk Power Corporation, October 31, 1997.
2.
"Nuclear Measurement Analysis and Control Power Range Neutron Monitor (NUMAC-PRNM)
Retrofit Plus Option III Stability Trip Function," NEDC-32410P-A, October 1995.
Request 1: Indicate the specific period for operating the OPRM before activating the OPRM function and implementing the OPRM technical specification changes.
For example, NEDC-32410P-A (Ref 2) allows one fuel cycle for testing the OPRM functions before implementing amended OPRM technical specifications.
Request 2:.Provide the following design basis environmental conditions for NMP2:
Temperature NMP2 (Ref 1) 24'C to 32'C (reported)
(75'F nominal to 90'F)
Design Basis:?
NUMAC-PRNMS (Ref 2) 5'C to 50'C (41'F to 122'F)
Humidity 20% to 50% RH (reported)
Design Basis: ?
10% to 90% RH (noncondensing)
Pressure Radiation 14.7 psia (acceptable)
<0.2mRem/hr dose rate (reported) 70 Rem TID (reported)
Design Basis: ?
13psia to 16 psia 1E-4 Gy(Carbon)/hr dose rate 1E+2 Gy (Carbon) TID P
Note: The radiation limits should be expressed in rads/hr or Grays/hr dose rate, and total integrated dose in rads or Grays, instead of units of rem/hr and rem TID.
Enclosure
- r. ~
< i 4