Forwards Insp Repts 50-220/97-01 & 50-410/97-01 on 970112-0222.No Violations Noted.Nrc Concerned W/Several Issues Attributable,In Part,To Lack of Adequate Mgt Oversight Re Activities Important to Reactor Plant Safety
ML17059B501
Person / Time
Site: Nine Mile Point  
Issue date: 04/16/1997
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059B502 List:
References
NUDOCS 9704230118
Download: ML17059B501 (6)


See also: IR 05000220/1997001

Text

April 16,

1997

Mr. B. Ralph Sylvia

Executive Vice President Generation

Business

Group and Chief Nuclear Officer

Niagara Mohawk Power Corporation

Nuclear Learning Center

450 Lake Road

Oswego, NY 13126

SUBJECT:

NRC INSPECTION REPORT NOS. 50-220/97-01

AND 50-410/97-01

Dear Mr. Sylvia:

This report transmits the findings of safety inspections conducted

by NRC inspectors at the

Nine Mile Point Nuclear Station, Units

1 and 2, from January

12 through February 22,

1997. At the conclusion of the inspection, the findings were discussed

with you and other

members of your staff.

I

1

During this period,,your staff operated

both units safely.

The actions taken by your staff

to shutdown Unit 1 upon identification of an increased drywell floor drain leakage rate

were appropriate.

During the shutdown, we noted improved control of reactor vessel

water level.

However, during this inspection period, several issues were identified by your

staff and the NRC that were attributable,

in part, to a lack of adequate

management

oversight.

These included failing open both Unit 2 standby gas treatment system cross-

connect valves at the same time without adequate

prior evaluation,

and not resolving a

human-factors

concern associated

with disconnected

Unit 2 high pressure

core spray

system local valve position indications that existed since initial operation.

We believe that

these are examples, similar to those identified in recent inspection reports, that indicate

increased management

oversight and involvement of activities important to reactor plant

safety are warranted.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter,

and its enclosures,

will be placed in the NRC Public Document Room.

We appreciate your cooperation.

Sincerely,

Original Signed

by:

nn~Pn3

Lawrence T. Doerflein, Chief

Projects Branch

1

Division of Reactor Projects

9704230%l8

'7704kb

PDR

ADOCK 05000220

8

PDR

////I/Mr////f//////////7////

".IAL RECORD

COPY

IE'01

Mr. B. Ralph Sylvia

Docket Nos.

License Nos.

50-220, 50-410

DPR-63, NPF-69

Enclosure:

NRC Inspection Report Nos. 50-220/97-01

and 50-410/97-01

cc w/enclosure:

R. Abbott, Vice President 5 General Manager - Nuclear

C. Terry, Vice President- Safety Assessment

and Support

M. McCormick, Vice President - Nuclear Engineering

N. Rademacher,

Unit 1 Plant Manager

J. Conway, Unit 2 Plant Manager

D. Wolniak, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

J. Rettberg, New York State Electric and Gas Corporation

Director, Electric Division, Department of Public Service, State of New York

C. Donaldson,

Esquire, Assistant Attorney General, New York Department of Law

J. Vinquist, MATS, Inc.

P. Eddy, Power Division, Department of Public Service, State of New York

F. Valentino, President,

New York State Energy Research

and Development Authority

J. Spath, Program Director, New York State Energy Research

and Development Authority

Mr. B. Ralph Sylvia

Distribution w/encl:

W. Axelson, DRA

D. Screnci, PAO

Region

I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC

NRC Resident Inspector

R. Correia, NRR

D. R. Taylor, NRR

L. Cunningham,

NRR

D. Barss, NRR

L. Doerflein, DRP

T. Moslak, DRP

R. Junod,

DRP

Distribution w/encl:

(VIA E-MAIL)

W. Dean OEDO

B. Norris - Nine Mile Point

S. Bajwa, NRR

D. Hood, NRR

K. Cotton, NRR

M. Campion,

Rl

Inspection Program Branch (IPAS)

DOCUMENT NAME: A'iNMIR9701.BSN

To receive a copy of this doctenant. Indicate in the box:

C

~ Copy without attachment/enclosvre

E

~ Copy whh attachment/enclosure

tt

~ No copy

OFFICE

NAME

DATE

RI/DRP

BNorris

04///,/97

RI/DRP

LDoerflein

0~/II/97

OFFICIAL RECORD COPY