ML17059A952

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Utils on 951102 to Discuss power-operated Valve Pressure Locking & Thermal Binding Issues W/Region I Licensees W/Special Emphasis on Listed Issues
ML17059A952
Person / Time
Site: Beaver Valley, Millstone, Calvert Cliffs, Peach Bottom, Salem, Nine Mile Point, Indian Point, Oyster Creek, Hope Creek, Pilgrim, Susquehanna, Seabrook, Vermont Yankee, Haddam Neck, Ginna, FitzPatrick, 05000372, Crane  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/27/1995
From: Eugene Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17059A953 List:
References
GL-95-07, GL-95-7, NUDOCS 9510050164
Download: ML17059A952 (8)


Text

ENCLOSURE 1

Licensees:

Facilities:

Docket Nos:

Time and Date:

Location:

Purpose:

NRC Attendees:

U. S.

NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE HEfTING Baltimore Gas

& Electric Company, Calvert Cliffs 1&2 (50-317; 50-318)

Boston Edison, Pilgrim (50-293)

Connecticut Yankee Atomic Power Company, Haddam Neck (50-213)

Duquesne Light Company, Beaver Valley 1&2 (50-334; 50-412)

GPU Nuclear Corporation, Three Mile Island 1&2 (50-289; 50-320)

Oyster Creek (50-219)

New York Power Authority, Indian Point 3 (50-286), FitzPatrick (50-333)

Niagara Mohawk Power Corporation, Nine Mile Point 1&2 (50-220; 50-410)

North Atlantic Energy Service Corporation, Seabrook (50-443)

Northeast Nuclear Energy Co., Millstone 1,2,& 3 (50-245; 50-336; 50-423)

PECO Energy, Limerick 1&2 (50-352; 50-353),

Peach Bottom (50-277;50-278)

Pennsylvania Power

& Light Company, Susquehanna 1&2 (50-387; 50-388)

Public Service Electric

& Gas

Company, Hope Creek (50-354),

Salem 1&2 (50-372; 50-311)

Rochester Gas

& Electric Company, Ginna (50-244)

Vermont Yankee Nuclear Power Corporation, Vermont Yankee (50-271)

Thursday, November 2, 1995 8:00 a.m. to 4:30 p.m.

Doubletree Guest Suites (610-647-6700)

Wayne, Pennsylvania Discussion of power-operated valve pressure locking and thermal binding issues with Region I licensees.

Special emphasis will be placed on:

(1) the principal technical issues; (2) typical calculational methods and assumptions; and (3) the process for resolution of Generic Letter 95-07, "Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves."

W. Kane, Deputy Regional Administrator J. Wiggins, Director, Division of Reactor Safety (DRS)

R.

Wessman, Chief, NRR, Mechanical Engineering Branch (MEB)

E. Kelly, Chief, Systems

Branch, DRS T. Scarbrough, Senior Mechanical
Engineer, NRR, HEB H. Rathbun, Mechanical
Engineer, NRR, HEB NOTE:

(1)

Attendance by NRC personnel at the NRC/Licensee meeting should be made known by October 13, 1995, via telephone call to E. Kelly (610) 337-5111.

(2)

Due to the subject matter and nature of this meeting, this meeting is open for observation by members of the general public.

Prepared By:

Eugene Kelly, Chic Systems ranch Division of Reactor Safety

ENCLOSURE 2 PRESSURE LOCKING AND THERMAL BINDING MEETING AGENDA NOVEMBER 2, 1995 8:00 8:15 a.m.

8:15 8:45 a.m.

8:45 9:00 a.m.

9:00 -

9:30 a.m.

9:30 9:45 a.m.

9:45 - ll:15 a.m.

11:15 - 11:30 a.m.

11:30 1:00 p.m.

1:00 -

1:30 p.m.

1:30 2:00 p.m.

2:00 -

2:15 a.m.

2:15 -

4:15 p.m.

4:15 -

4:30 p.m.

Welcome and Opening Remarks by William Kane, Deputy Regional Administrator "UtilityPerspective,"

by Robert Harris, Program Manager, Northeast Utilities "The Headquarters Perspective,"

by Richard

Wessman, Chief, NRR, Mechanical Engineering Branch (MEB),

Division of Engineering "Pressure Locking and Thermal Binding Experiences,"

by Tom Scarbrough, Senior Mechanical

Engineer, NRR, MEB Break Breakout Sessions Breakout Session Results Lunch "UtilityPerspective,"

by Pennsylvania Power 8 Light Company "Examples of GL 95-07 Susceptibility And Evaluation Methods,"

by Howard Rathbun, Mechanical

Engineer, NRR, MEB Break guestions and Answers Panel Session Closing Remarks by Eugene, Kelly, Chief, Systems Branch, Division of Reactor Safety

5tNt AY'Xerox lelecopier

'f020 i 8"22-85 i 13t04 6104088323~

215 337 5320iO 3

I

~ ~

Overlooking historic Valley Forge National

Park, Douhietr<<<<Guest Suites Is located in Chesterbrook Corporate Center, just minutes from Longwoori Gardens, Vuffey Forge Music Fair and King vf Prussia Shopping Complex, The hotel is also within easy access of Center
City, Philadelphia and Wifmington, Delaware.

fritr.vour J'itttt'xs rt','ittu it, c'ottsitft r lite t'tfrc'sft-ittg iildtior pottf, whirlpool, xttttntt, spa anil joggingitwafkfng trails. Dine can(ally on American cuisine at our 'lown

& Country Griffe at Chesterbrook.

On weekends, enjoy entertainnfent at the Atrium Lounge.

II I

Ifyou have a business nr social function, t ere are sixflexible meeting and banquet rooms acc m; modating up to 120 people. For board meet ngS there are nine executive meeting suites, each ab to seat eight, Large or small, your special occas ons willbe handled flawlessly by our dedicated st f.

Of course, every stay begins with Doublet eel

.signature greetingour freshly baked choc fate chip cookies nccontpanied by n earn> wc fconte il's all part of the personal attentirtn that sets Doubletree Guest Suites apart.

sr/]()/(fir/~'gw+ p Cs/(c%,'s'15 Ip

~;, ~,i'LWP.

,v Aff 229 luxurious guest suites are beauttfttffy nppriinted, creating a comfortable environment fttr relaxing or entertaining. As well as sppcious livingand bedrooms, each suite isfurnished with a wt'if~stocked refrigerator, min!bar and wet bar urt tt. To.start your day, there's complimentary cof-fer<<. I<<rt <<nd decaf plus a copy of USA Today.

888 Chc'stcrrhrotrk Bttufevartt, Wuyrt<<, PA itt08 Dial Directe (6I0) 647-6700

~ Ftrxt (6f0) ftHW4 0.

1-800-222-TREE rrrst Doubletree Hotels Coitrorattun wetcorrrcs you fruot coast io c at over Itt0 Doubletree Hotels and Douhleircr Grreit Srrltc..

>t:Nl UY'Xerox lelecopier

'l020 '-22-85 '3:03 6104088323+

215 331 5320'¹ 2

t Directions to

~

DoubleTree Guest Suites - Valley Forge THE PENNS V

g(K Exit 24 {VaHey Forge/King of Prussia)

-After Going Through the Toll Booth, Take Exit 26A (West Chester/202'out

-Follow 202 South for 4 Mi1es to the Chesterbrook Boulevard Exit The DoubleTree Guest Suites is on the Right L

Take 95 South (Delaware) Approximately 4 Miles to 476 North, Exit 7 (Plymouth Meeting)

-Follow 476 for Approximately j.7 Miles to Exit 6B {VaHey Forge/76 West)

-Take 76 %est to Exit 268 {ValleyForge/West Chester/202 South)

-FoHow 202 South for 4 Miles to Chesterbrook Boulevard Exit The DoubleTree Guest Suites is on the Right S

L IVB'RE9SWAY T 7 CENTER CAY Take 76 'West to Exit 268 {ValleyForgeAVest Chester/202 South)

-FoHow 20? South for 4 Miles to the Chesterbrook Boulevard Exit The DoubleTree Guest Suites is on the Right LA ARE POP@'S Take 95 North to 476 North - Exit 7 {Plymouth Meeting)

-FoQow 476 for Approximately 17 MBes to Exit 68 (Valley Forge/76 West}

Take 76 West to Exit 268 (Valley Forge/West Chester/202 South)

-Follow 202 South for 4 Miles to Chesterbrook Boulevard Exit The DoubleTree Guest Suites is on the Right I

I TI'UVE

-Follow 202 North to the 252/Chesterbrook/Paoli Exit

-At the Bottom of the Ramp make a Left

-Make a Right at the Light onto DuportaB Road and Follow to the Second Li

-Cross the Intersection into the DoubleTree Guest Suites Parking Lot 0

W Take the New Jersey Turnpike South to Pennsylvania Turnpike West, Exit 6

-Continue on Pennsylvania Turnpike to Exit 24 (VaHey Forge/King of Prussia

-After Going Through the ToH Booth, Take Exit 26A (West Chester/202 Sou

)

-FoHow 202 South for 4 Miles to the Chesterbrook Boulevard Exit

-The Doubletree Guest Suites is on the Right TRAV',

A Y QN RT. 422 Take 202 South/West Chester Exit

-Fol1ow 202 South for Approximately 3 1/2 Mi1es to Chesterbrook Boule@

The Doubletree Guest Suites is on the Right ard xit

8 ~