ML17059A903
| ML17059A903 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 08/16/1995 |
| From: | Edison G NRC (Affiliation Not Assigned) |
| To: | Sylvia B NIAGARA MOHAWK POWER CORP. |
| References | |
| TAC-M91273, NUDOCS 9508210212 | |
| Download: ML17059A903 (8) | |
Text
500(
~o Cy C
O cA0 Y.
Cy qO
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 16, 1995 e,'L Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE NINE MILE POINT NUCLEAR STATION UNIT NO.
1 (TAC NO. M91273)
Dear Mr. Sylvia:
By your application dated February 24,
- 1995, and affidavit dated February 22,
- 1995, by George B. Stramback, you submitted information contained in GE document 383HA718, Revision 0, "Thermal Cycles, Reactor Vessel and Nozzle-Description, Bases and Assumptions,"
Revision 0, dated February 23,
- 1973, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790.
You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
a.
Information that discloses a process,
- method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over. other companies; b.
Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the
- design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from the public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
A nonproprietary version was submitted by letter dated March 20, 1995.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need
- arises, we may send copies of this information to our consultants working in 95082102i2 9508%ST
\\
B. Sylvia this area'.
We will, of cour se, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Docket No. 50-220 Gordon E. Edison, Senior Project Hanager Project Directorate I-I Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc:
See next page
a
B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.
1 CC:
Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382
- Oswego, NY 13126 Mr. Louis F. Storz Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 126
- Lycoming, NY 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Hr. F. William Valentino, President New York State
- Energy, Research, and Development Authority 2 Rockefeller Plaza
- Albany, NY 12223-1253 Hr. Richard B. Abbott Unit 1 Plant Manager Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Hs. Denise J. Wolniak Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Hr. Paul D.
Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
- Albany, NY 12223 Hr. Hartin J.
McCormick, Jr.
Vice President Nuclear Safety Assessment and Support Niagara Hohawk Power Corporation Nine Mile Point Nuclear Station P.O.
Box 63
- Lycoming, NY 13093
V
~
~
B. Sylvia this area.
We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.
You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a
determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, Original signed by:
Gordon E. Edison, Senior Project Hanager Project Directorate I-1
,Division of Reactor Projects I/II Office of Nuclear Reactor Regulation 4
't, Docket No. "50-220 I
cc:
See.next, page'j
~oi t ib t
'ocket Fil'e ',
PUBLIC JZwol inskii r
SLittle
'~ir H.
P. Siemien;" '-
Il, RGN-I',
DOCUMENT NAHE:
G: iNHPliBN191273. PRO To receive e copy of this document, indicate in the,box:
7C" Copy without enclosures "E" ~ Copy with enclosures "N" ~ No copy OFFICE LA:PDI-1 NAHE SLittle DATE 08// /95 PH:PDI-OGC GEdison:smm 08/ c,'95 HPSiemien 08/
/95 OFFICIAL RE ORD COPY D PDI-1 LHarsh 08/giI /95 08/
/95
/
I" l
ll lg ii k' J
e'="
J E.'
t (i
I I
P J It LP I
L I
1, 1
h 1
q 14 J9
- h s-.
1 k
'. jj