ML17059A624

From kanterella
Jump to navigation Jump to search
Amend 60 to License NPF-69,revising Applicability Requirements of TS 3.7.3 to Require Operability of Control Room Outdoor Air Special Filter Train Sys in Operational Conditions 1,2,3 & **
ML17059A624
Person / Time
Site: Nine Mile Point 
(NPF-69-A-060, NPF-69-A-60)
Issue date: 01/18/1995
From: Michael Case
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17059A625 List:
References
NUDOCS 9501240257
Download: ML17059A624 (12)


Text

gP,R RE0IJ Cy O

I 9

Y.

Cy

~0

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 G

RA OHAW OW CO PO T 0 KKKE.

1 N NE MILE POINT NUCLEAR STATION UNIT 2 AME DMENT TO FACILITY OPERATING LICENSE Amendment No. 60 License No. NPF-69 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated October 5,

1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the ComIission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such. activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Fac'ility Operating License No.

NPF-69 is hereby amended to read as follows:

950l240257 950il8 PDR ADOCK 05000410 P

P DR/~.

,e

c S eci ications and Environment 1 Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No. 6o are hereby incorporated into this license.

Niagara Mohawk Power Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

january 18, 1995 Michael J.

Case, Acting Director Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

na

ACHMENT TO LICENS AMENDS T

DME T 0

60 TO FACILITY 0 RATING ICENSE NO. NPF-69 DOCKET NO. 50-410 Revise Appendix A as follows:

emove P

es 3/4 3-68 3/4 3-70 3/4 7-11 nsert es 3/4 3-68 3/4 3-70 3/4 7-11

ZZffl K

Ifll 90z I

Cz 1.

2.

INSTR MENTATI Main Control Room Ventilation Radiation Monitors Area Monitors TABLE3.3.7.1-1 RADIATIONMONITORING IN TR NIENTATI N MINIMUMCHANNELS

~*

2/System(b)(e)

APPLICABLE ALARNI/TRIP 1, 2, 3 and

  • c5.92x10 pCi/cc(c) 74 4) ol M

a.

Criticality Monitor (New Fuel Storage Vault) b.

Control Room Direct Radiation Monitor At all times x 1.0x102 mR/hr(d) a2.5x10 1 mR/hr(d) 76 Z0 Z

z0 0

CD

zzm K

Im 00z I

Cz lO TABLE4.3.7.1-1 RADIATIONMONITORING INSTRUMENTATIONSURVEILLAN E RE UIREMENT INSTRUMENTATION Main Control Room Ventilation Radiation Monitors S

NA Q

1,2,3and*

OPERATIONAL CHANNEL CONDITIONS FOR WHICH CHANNEL SOURCE FUNCTIONAL CHANNEL SURVEILLANCE CHECK CHECK TEST CALIBRATION RE IRED 4) 4)

V O

2.

Area Monitors a.

Criticality Monitors (New Fuel Storage Vault) b.

Control Room Direct Radiation Monitor SA SA At all times zO z

z0 C)

When handling irradiated fuel in the reactor building and during CORE ALTERATIONSand operations with a potential for draining the reactor vessel.

With fuel in the new fuel storage vault.

t PLANT SYSTEMS 3 4.7.3 CONTROL ROOM OUTDOOR AIR SPECIAL FILTER TRAIN SYSTEM LIMITIN CONDITI N

FOR PERATIQN 3.7.3 Two independent control room outdoor air special filter trains* shall be OPERABLE.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3 and **.

ACTION:

a.

In OPERATIONAL CONDITION 1, 2, or 3 with one control room filter train inoperable, restore the inoperable filter train to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

In OPERATIONAL CONDITION **:

With one control room filter train inoperable, restore the inoperable filter train to OPERABLE status within 7 days or initiate and maintain operation of the OPERABLE filter train in the emergency pressurization mode of operation.

The provisions of Specification 3.0 4 are not applicable provided an operable control room filtertrain is in the emergency pressurization mode of operation.

C.

2.

With both control room filter trains inoperable, suspend CORE ALTERATIONS, handling of irradiated fuel in the reactor building and operations with a potential for draining the reactor vessel.

The provisions of Specification 3.0.3 are not applicable in OPERATIONAL CONDITION **.

S RVEILLAN E REQUIREMENTS 4.7.3 Each control room outdoor air special filter train shall be demonstrated OPERABLE:

80 b.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the control room air temperature is less than or equal to 90'F.

At least once per 31 days on a STAGGERED TEST BASIS by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the filter train operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters OPERABLE.

This includes the control room chiller subsystem.

When irradiated fuel is being handled in the reactor building and during CORE ALTERATIONS and operations with a potential for draining the reactor vessel and uncovering irradiated fuel.

NINE MILE POINT - UNIT 2 3/4 7-11 Amendment No. 60