ML17059A296

From kanterella
Jump to navigation Jump to search
Summary of 940502 Conference Call to Discuss Implementation of GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance, at Plant.Nrc Considered Proposed Schedule of GL 89-10 design-basis Capability Testing Acceptable
ML17059A296
Person / Time
Site: Nine Mile Point 
Issue date: 05/06/1994
From: Brinkman D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
GL-89-10, NUDOCS 9405130133
Download: ML17059A296 (18)


Text

e gpss RCQQ Wp0

'+n ++*++

Docket No. 50-220 UNlTED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 6, 1994 LICENSEE:

Niagara Mohawk Power Corporation FACILITY:

Nine Mile Point Nuclear Station Unit No.

1

SUBJECT:

SUMMARY

OF HAY 2,

1994, CONFERENCE CALL TO DISCUSS THE IMPLEMENTATION OF GENERIC LETTER (GL) 89-10, "SAFETY-RELATED HOTOR-OPERATED VALVE (HOV) TESTING AND SURVEILLANCE," AT NINE MILE POINT NUCLEAR STATION UNIT NO.

1 (NHP-1)

By letter dated February 22, 1994, the NRC staff had expressed its concern regarding Niagara Mohawk Power Corporation (NHPC's) apparent lack of progress in resolving the HOV issues of GL 89-10 at NHP-l.

This apparent lack of progress had been noted in Combined Inspection Report No. 50-220/93-22 and 50-410/93-21 and in the NRC staff's review of NHPC's September 27,

1993, response to Supplement 5 of GL 89-10.

The February 22, 1994, letter also proposed holding a meeting to discuss NHPC's progress to date for implementing the provisions of GL 89-10 at NHP-l.

In response to the NRC staff's request for a me'eting, NHPC proposed to conduct a conference call rather than to hold a meeting.

The NRC staff agreed to the proposed conference call which was held on Hay 2, 1994.

In preparation for the conference call, NHPC provided a copy of its current schedule for completing GL 89-10 at NHP-1 to the NRC project manager for NHP-l.

Enclosure 1 is a copy of the information provided to the NRC project manager.

Enclosure 2 is a list of participants in the Hay 2,

1994, conference call.

During the May 2,

1994, conference call, NHPC representatives stated that 51 NHP-1 valves are within the scope of GL 89-10.

Approximately one-half of these 51 valves can be tested with the plant in operation, the remainder require the plant to be in a refueling outage during testing.

NHPC considers it practicable to dynamically test 28 of the 51 valves; the balance will be considered for grouping in accordance with the provision of Supplement 6 to GL 89-10.

NHPC also stated that of the 28 valves to be dynamically tested, 8 can be tested during plant operation while 20 require the plant to be in a refueling outage to perform dynamic testing.

NHPC stated that in accordance with its current plans and schedules, all of the GL 89-10 design-basis capability testing of NHP-1 valves will be completed by the end of the next refueling outage (currently scheduled to begin in February 1995).

The NRC staff considered the proposed schedule acceptable 9405i30i33 94050b'T PDR ADOCK-,05D00220 F D~R g jogga

~I;gg g647E MV

1

Nay 6, 1994 since the proposed schedule is consistent with the provisions of GL 89-10.

The-NRC staff requested NHPC to inform the NRC staff if there are any substantive changes to the schedule provided in Enclosure 1.

Enclosures:

1.

Status and Schedule=for Implementation of GL 89-10 at NNP-I 2.

List of Conference Call Participants cc w/enclosures:

See next page Donald S. Brinkman, Senior Project Manager Project Directorate I-1 Division of Reactor-Projects I/II Office of Nuclear Reactor Regulation

Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.

1 CC:

Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382

Oswego, New York 13126 Mr. Louis F. Storz Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63

Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission P.O.

Box 126

Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator,'egion I

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Hr. Richard B. Abbott Unit 1 Plant Manager Nine Mile Point Nuclear Station P.O.

Box 63

Lycoming, New York 13093 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63

Lycoming, New York 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Hr. Paul D. Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza
Albany, New York 12223 Hr. Hartin J.

HcCormick, Jr.

Vice President Nuclear Safety Assessment and Support Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63

Lycoming, New York 13093 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station P.O.

Box 63

Lycoming, New York 13093

a,. <q

i=nciosU-e I

STATUS OF IMPLEMENTATIONOF GENERIC LETTER 89-10 AT NINE MILE POINT UNIT 1

+

Diagnostic. equipment vendor manuals and maintenance procedures to support static testing have been issued.

Test equipment has been received on site.

Electricians and Engineering personnel have been trained in VOTES and Advanced VOTES.

+

An on-line, and outage schedule has been developed that accomplishes all

. testing by the end of the 1995 refuel outage.

(Schedules are attached)

As of the week of April 11, 1994 static testing has been completed on two valves.

Lessons learned from the first valve test are being incorporated into site and engineering procedures.

+

System Engineering, Operations and Design Engineering have started reviewing requirements, test methods and system configurations for development of test procedures for dynamically testable valves.

Final design reviews for 2 out of 51 valves is complete with final design reviews of the remaining 49 including operability reviews to be complete by the end of June 1994.

Pressure Locking/Thermo Binding review of gate valves is in progress with an expected completion of the end of May 1994.

Results of this review are being incorporated in the final design reviews.

N The PRA group has completed a review of valves in the Generic Letter 89-10 program and,has prioritized the list of valves based upon risk importance.

Engineering is reviewing plant valves and industry experiences to determine where grouping may be feasible.

This may result in fewer dynamic tests than currently scheduled.

NMP GENERlC LETTER 88-10 OiV-Lli51E SCHEDULE rAOS 1 4

Ao or'NIL ii 1N

~

ID 0005040RHY J Lr 400 ~

400

~ 00 OENKRXC LCTTCR 0 ~

1 ~

2 ~ TDO ~KKY'OTOTDIDDRSKI

~I O'L PERf Dlel SAOCLIMI 'TCSTIHO 0$

~ 2 PCRSDRH SAOELIHC TESTIHO 0$

2$

pcRFDRH DAOKLIMITcsTIHO 0\\ t2 PCRFDRH SASELXNE TESTIHO I<IotSLT402DCYOYER'SIDRSKI

~ ~

PCRSORH SAOCL'INC TCSTIHO N 0 ~

PERSDRH LCAK RATE TEST JJ- ~ 1 STaoc NDRK racraoc ORDY2DKPIJIOKXYJI'TCITPY%ARRI I~

~ 2 PERSORH SASELIHC TEOTIHO 10-oa STaoe HDRK racraoe II= tte22cer veer seYIHvuasr DEVELOP TCST PRDCCDURE CHER COND

~ 0

~I PcefDRH SASCLINC TESTIHO 00

~ 2 PCRSDRH DYNAHIC TESTIIKI

~ O-OT STaoe 54DRK PACKAOC 0'$00 PKRFDRH SAOKLINC TCSTXHO

~ 0

~ 0 PCRFDRH DYNAHIC TCSTINO 00

~ 0 STAOC NDRK PACKAOE 10

~ YR PCRSDRH SASCLINC TCSTINO Jo-OTR IKRSDRH L.ear RaTE Test

$ 0 OIR STACK lKNK tACKAOC 20

~ OR I'CRI'DRH 2ASCLIHE TCSTII40 2 ~

~ OR PERFDRH LEAK RA'YC TCST 20 D'OR STAOC NDRK PACKAOC 2 ~ -OOR ICRFDRH saeKLIHE TEOTXNO

$ 0

~ OR I'ERI'DRH LCAK RATC TEST 2 ~

0 ~ R STAOC NDRK PACKAOC 2 ~

SOR PKRSORH SASELINC TESTINO 10 SOR STAOC NDRK PACKAOC 51 "CONYKXIHDIIOPRL~KIYLIDCtct DKYCLDP Test PROCEDURE - CONTSPRAY JJL0401 Q

OJW04 IJWO ~

Q lJWO ~

attwe4 p aeJwei e

NUH01IJULY I taJUL ~ 1 20 e IIJULS~

JUL01 p IOJUI.~ 1 1 ~

SSJULO ~

Toi Q SODCT01 OCTO' 20DCTO ~

SYOC 20 DCT01 P '22DCTO ~

e soocT01 27HAYO~

2 OAUO~ 1 teKP04 Q

OOKPO ~

tOKP01 Q

OSEP04 2NUL04 p tTJUL04 teJVLO ~

$ 20JLR ~ 1 e

SOJVL01 2JAHOO I

alJAHOO f SOJAHOO I

$ 0JF4400

/ so JAHOS I

I 2$Jttl~ 0 P teJAHte 20 JAHOO

) to JAHOO

$ 02404 ~ 0 201ftleo

( teJAHOO SOJANOO

~ 0

~I 0 ~ 0$

~ 0

~ 2

~ 0

~I

~ 0 21

~ 0 2$

~ 0 22

~ 0 22

~I as

~\\

~ 1 22 02 20 F 2 20

~I 20

~I tl

~ 2 N 20

~I tt

~I-tt N 22

~ $ 10

~I I~

N 2 ~

tCRSDRH SASELIHE TCSTXHO STaoe IIDRIL PACraoe PERFDRH SASKLIM\\ TCSTIHO sTaoc IIDRK racraoc PERI'DRH SAOKI INE TCOTINO STAOC I4DRK PACKAOC PCRSDRH SAOELINE TCSTIHO STAOC NDRK PACKAOC STAOC IJDRK PACIIAOC STaoe HDRK racraoc OTAoc IJDRK racraoc PCRFORH SAOELXNC TCSTIMI

~'CRI'Dlul DYHAHIC TCSTIHO STADE HDRK racaroc PERFDRH SASCLXNC TCSTXNS tCRFORH DYI4WIC TEOTXIKI STAOC NDRK PACAKOE PERP DRH SASCLXNC 'TCSTINO

~CRI'DRH DYN0HXC TCSTIHO staoc NDRK racaroc PKRSDRH SAOCLINC TCSTIHO PCRfDRH DYNFHIC TCSl'INO sTaoc HDRK racaroc ISH0R04 Q t Hraoi 1

Q $ 4HARO aoatRO4 Q taatR04 e

$ 0SPR04 IJUL0 ~e P

~ JUL01 4JW04

~Jul.oi p 0JUL~ 1 e

2

~JW04 Q ttJwe ~

I2JW04 I2JLN01 teJUH04 P ttJW01 JDCT04 Q

eocT01 210EP01 Jeecl'04 p SE JDCT04 P04

-e r

e

~ADO04

~ADO0 ~

I'01 SEP01

( $ 00 P04 scree

) aoer DECO ~

/ SODECei DECO' SODE C04 QYA YE JW

~ 0 ~ 4 00I F 00'00

I

NMP1 QENERlC LETTER $810 0$ C./IVY SCHEDULE PAOC 4 ll~l Fl ~

~ 0 PAOO OYOYKN ttatotrt DEVELOP TEST<RESULTS REVXCll OUIDCLIN la ~

$ 2 ~

PERFDRtl SASELINE TESTINO 11 ~

$ 20 PERFDRH DYNAHIC TCSTINO ll~

$24 PERFDRH LEAK RATC TEST 1$ ~

$ 2 ~

OTAOC NORK PACKAOE DEVELOP TEST PROCCDURE PASS SYSTEH

~ 1 'VKXXXKKPWfrttttERT'SYOTXtl~

2 ~l ~ 0 PCRFORH SAOCLXNC TCOTltrt tol

~ 0 t'ERI'ORH LEAK RATd TEST 20$

~ 0 STAOC ltORK PACKAOC tol, ~ 2 PCRFOItH SAOCLINC TCSTINO 2 ~ 1

~I PCRFORH LEAK RATC TCOT toa-OT STAod atoRK t ACKAOE F 1 XT PERFDRH SASCLXNC TCSTltrt 201 ST PCRFORH LEAK RATd TCST 201

$ 1 O'YAOC NORE PACKAOC 2 ~I 1$

PERFDRH SAOCLINC TCSTltra toa ll PCRFORtl LEAK RATC TCST 201 21 OTAOC llORK PACKAOC aotvlYO ~

Q

$ 0HAYol XOHAYO~

) XOHA

+

Stot Y0~

XAUOOO

~l

/ 1OAUO XOAUO XAUD0 0 t2AUOOi Q 2lAUOO~

2$ AUOO ~

$ 20AUOO ~

a XOAUooe 21AUOOO Q tiAUOO~

XOAUOO~

f 2OAUOol 4'oAUool XNOVOS Q 2$NOVO~

tlNOVO~

) tiNOVOO 4

1 4NOVO ~

XNOVO~

Q 21NOVOX ttNOVO<

I tlNOVO~

4 XKNOYO~

YA YO l~ 0 ~

lll~

FOR

C

NMP'I GENERIC LETTER 80-10 RFOl8 OgQ OE SCHEDCIL8 Wr PAPE'

~S Or rcrea r 2 2 02UANT

~

2 2

~

0

~

2

~

~

I~

22 22 22 2 ~

I~

2 ~

lt

\\ ~

le 24 22 22 22 NAIMleftVRX14CIRC OYOPOI NINID4

~l ~ 1 PERFORH SASELINE TEST INC

~ 1

~I PERSORH DYWOIIC TCSTINO

~ 1

~I PERFORH SASCLINC TCOTIND

~l Ot PERFORtl DYNAHIC TTLOTINO 2

Ebs~CRY'ST0TDI QDEtdP

~ 0

~ 1 PERFORH OAdcLXNC TCSTINO

~ 0 Ol PERFORII DYNAHIC TCOTINS

~ ~

~ 2 PCRI'DRH SASEL INC TESTIND

~ ~ 02 PCRFORH DYNAHXC TCSTINO 4 ~ ad PCRSORH OA0$'LINC TCSTINO 4 ~

~ 0 PERFORH DYWHXC TCOTINO 4 ~

~ 0 PERSORH bAOCLINE TCST'IND

~ ~ 00 PCRfORH DYP4PHXC TCOTIIOI

~ 0

~ 0 PERFORII SASCLXNC 'TCSYIND

~ 0

~ 0 PERSDRH DYWFIIC TCSTXNO

~ ~ fl PCRfORH SASKLXNE TESTXI4$

4 ~

PCRFORtl DUHIO TCSTIND 40

$ 2 PERFORH SASELINE TCOTIND

~ 0 It PERSORH DYNAtlIC TCSTXI4I

~ 0

$ 0 PERFORII SASCLINC TCSTII4$

~0-$ ~

I ERSDRH DYNAHIC TESTXWI

~ 0 al PCRFORH SASCLINC TCSTXND 4 ~

I CRFORH DYWPHIC TCSTIIRI a

IDPCKKPOKDCT$TOI~

~ lR I'ERFORH SAOELINC TcdTltRI

~ 2R PERFORH SAOCLINE 'TCOTINO al

~l I CRSORH bASELINC 'TEOTINO at Sl PCRSORtl DYWWXC TCSTXI4$

$ 2

~ 0 PCRS ORH SASELXNC TCSTIND

$ 2 OI PCRFORH DYNAHIC TCSTIIOI 4 - blctlaaasrdddcXIXT'STOYNT CDdtal

$ 0 Of PERFORH SAOCLXNC TCSTIND 2 ~ Of PCRFORH DYWYIIC TESTXI4$

11 RR bcdPTLbb'~DOX'STK'QIRRat To 02 PFRFORH OAOCLII41 TCSTII4I TS-02

~ CRFDRH DYWPIXC TESTXND Te 04 PCRFORH SAOCLINE TCSTINO Ts

~ 4 PERSORH DYWPIIC TEOTIIOI IX "KIFITÃXQRttl OFC4PWStaaTTIIRIKIP'0 I\\~

PCRSORH SASCLINE TCSTIPKI

~ 0 ff0 PCRSORH DYWIIC TCSTXICI Ic "CORODOXRYESF ISDOITRLC~IIIRO

~I PERFORH bASELINC TCSTIND

~ 'I PERSORH DYWVIIC TEST II4I

~ 0 PCRSORH SASCLINE TCSTIIRI al

~ 0 PCRSORH DYNAHIC TESTXNO OC TPWSIW'IJ1$ $222

$ 10

$ 22 PCRFORH SASCLINC TCSTIHD

$ $ ~

$ 2$

PCRFORH DYNAHIC TCOTINO

~I=wacratHeaeY STOTIII~

~ 2 1

~ 0 PERI'ORH OAOELXNC TCSTINO

~ 1 1

~ 0 PCRFDRH DYWOIXC TESTINO

~ $. I ll PCRFDRH SASCLXNE TCSYII4$

~I 2

1$

PCRFDRH DYIOWIC TCOTxt4l tsl ST PCRSORH DYI4IHIC TCSTINO 201

$ 1 PCRFDRH DYWFIIC TCSTXIEI 2$ FCS05 Q tlfCSOO tlSC105 ~ tlFCDOS ateWOO ~

al24ROO atNR0 5 +

aww1 5

$ HAROO~

awWOO IHAROO ~

$WWOS

$ 1fcbod~ lsfC00$

lefcbeo ~ lsrCSOO 2TI'Ebtd lHAROS fwwss ~

flawed awvlos~

awWOS awwoo ~

awwoo 2 ISC005 ~

$ HAROS awwsd ~

lwwos

'ITFESOO ~

XHAROS

$WW0$ ~

fHAROO 2TFCOO ~~

fHAROS flowed ~

lwwos ftlAA00 P

XTFEbsd IteW 0 5 IHAROS ~

ateW00

$WW05 tlfC00$~

$HAROS 2TFCOOO

$ WWOS awwod ~

awwes tlrcoos ~

fwwed lWWO~ ~

lWWOS

'2$ SCbsd+~

TWWOO TWWO~ Q

$WWO~

IOSCSO ~~ lefE115

$ 0FCSOO ~ 20SC F 00 10FCOOO ~

$ 0FCOOO lerCSOS O 20FCSSS

$ 1SES ~ 0~

'IOSCSOO 2$ SCS ~ 0 ~ tet'E01$

$ 0SCSOO ~

2 ~ FCSOS torESOS ~ terC105 1 ~I'Csed ~ 20FESOO tofCOOS + tofCStd aescboo ~ tercbos tefCSO ~

CI $ 0FC F 00 I~I'cses + lofcbos loSCSOO + lorCOO ~

ewwss ~

Twwoe Twwes ~

Twwss lawwoe ~ aawwod 2

2 2

~

~

4 2

~

I' 24044 Y

~

I~

22

~ 2 I ~

I~

IP 22 I~

WACPI I ~

2 ~

22 tt 22

~

~

~

~

~

A V

Enclosure 2

ist of Partici ants Conference Call -on Hay 2, 1994, to discuss status of implementation of GL 89-10 at NMP-1.

Name Donald S.

Brinkman Larry Nicholson Eugene Kelly Tom Scar brough Dave Baker Rick Abbott Curt Fischer Joe Thuotte Bill Yaeger Harry Barrett 0

a zation NRR/NRR/PDI-1 NRC/Region I NRC/Region I NRC/NRR/EMEB NMPC NMPC NMPC NMPC NMPC NMPC

~

~

)

Hay 6, 1994 since the proposed schedule is consistent with the provisions of GL 89-10.

The NRC staff requested NMPC to inform the NRC staff if there are any substantive changes to the schedule provided in Enclosure l.

Enclosures:

1.

Status and Schedule for Implementation of GL 89-10 at NHP-1 2.

List of Conference Call Participants Original signed by:

Donald S. Brinkman, Senior Project Manager Project Directorate I-l Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc w/enclosures:

See next page

'ocket File NRC 5'Local PDRs PDI-1 Reading W. Russell/F. Miraglia, 12/G/18 ADPR/NRR SVarga JCalvo RACapra DBrinkman CVogan OGC E. Jordan, HNBB 3701 LNicholson, RGN-I EKelly, RGN-I TScarbrough, 7/E/23 ACRS (10)

CCowgill, RGN-I OFFICE NANE DATE PDI-1: LA CVo an ~

PDI-1:PH, EMEB DBrink n: avl g 94

~eorm PDI-1:

OFFICIAL RECORD COPY FILENAME: G: iNMPliNMl.HTS

Jf l

E 1

4 1