ML17058A581
| ML17058A581 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/29/1990 |
| From: | Capra R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17058A580 | List: |
| References | |
| NUDOCS 9007060003 | |
| Download: ML17058A581 (8) | |
Text
~ g+8 Cy I
IQ O~
/n,n REgy "o~i 0
~O
- ++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NIAGARA-MOHAWK.POWER CORPORATION DOCKET-N0..50-220 NINE MILE.POINT. NUCLEAR-STATION. UNIT-1 AMENDMENT TO. FACILITY-OPERATING.LICENSE Amendment No. 117 License No.
DPR-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated August 19, 1988, as amended on May 15, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility wi 11 operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the, public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-63 is hereby amended to, read as follows:
9007060003 900625'DR ADOCK 05000220 P
I
(2)
Technical S ecifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No.
117, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE'NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 29, 1990 Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT-TQ.LICENSE AMENDMENT AMENDMENT-NQ. 117- - TO. FACILITY-OPERATING - LICENSE - NO. - DPR-63 DOCKET-N0..50-22Q Revise Appendix A as follows:
~R 117 Insert Pa e
117
HTN N
T P
RAT N
RYE LLAN E RE UIREHENT c.
If Specifications 3.2.7a and b above are not met, initiate normal orderly shutdown within one hour and have reactor in the cold shutdown condition within ten hours.
C.
At least once er uarter the feedwater and main-steam line power-operated'solation valves shall be exercised by partial closure and subsequent reopening."
d.
At least once er lant cold shutdown the feedwater and main steam line power-operated isolation valves shall be fully closed and reopened, unless this test has been performed within the previous 92 days.
e.
At least once er uarter the scram discharge system air operated vent and drain valves shall be fully closed and reopened.
Amendment No.
117 117
(
L