Docket No. 50-220 MAR 13 )gsg Niagara Mohawk Power Corporation Attn:
Mr. C.
V. Mangan Senior Vice President c/o Miss Catherine R. Seibert 300 Erie Boulevard West
- Syracuse, New York 13202
Dear Mr. Mangan:
SUBJECT:
SAFETY EVALUATION -
MASONRY WALL DESIGN, IE BULLETIN 80-11 (TAC 42884)
Re:
Nine Mile Point Nuclear Station, Unit No.
1 We have completed our review of your response to IE Bulletin 80-11, Masonry Wall Design, for Nine Mile Point Unit 1, as submitted in letters dated July 8,
- 1980, November 10,
- 1980, June 14,
- 1982, June 24,
- 1983, and June 21, 1984.
Your use of the "leak-before-break" concept to eliminate consideration of the pressure loads resulting from a high energy line break is under review as a rule-making issue.
However, the generic structural engineering review of the Masonry Wall Design for Nine Mile Point 1 is complete.
The enclosed Safety Evaluation supporting our findings is enclosed.
Sincerelv, 8+P3QQOK22 50002PO 603l>
PDR P,QOCK 0
>DR 8
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DISTRIBUTION John A. Zwolinski, Director BWR Proiect Directorate ¹1 Division of BWR Licensing NRC POR Local PDR BWD¹1 Reading RBernero OELD EJordan BGrimes JPartlow JKelly CJamerson JZwolinski ACRS (10)
NChokshi GHolahan DBL:PD¹1 CJamerson 3/>3/86 DBL PD¹1 J}(
JKelly:tm 3 / Q/86 DBL:PD¹1 JZwolinski g /)p/86
/
I H
N ll
/L gW'4 "<CIJ~
~
~CV P
+
0 e jg UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 13, 1986 Docket No. 50-220 Niagara Mohawk Power Corporation Attn:
Mr. C.
V. Mangan Senior Vice President c/o Miss Catherine R. Seibert 300 Erie Boulevard West
- Syracuse, New York '3202
Dear Mr. Mangan:
SUBJECT:
SAFETY EVALUATION - MASONRY WALL DESIGN, IE BULLETIN 80-11 (TAC 42884}
Re:
Nine Mile Point Nuclear Station, Unit No.
1 We have completed our review of your response to IE Bulletin 80-11, Masonry Wall Design, for Nine Mile Point Unit 1, as submitted in letters dated Julv 8,
- 1980, November 10,
- 1980, June 14,
- 1982, June 24,
- 1983, and June 21, 1984.
Your use of the "leak-before-break" concept to eliminate consideration of the pressure loads resulting from a high energy line break is under review as a rule-making issue.
However, the generic structural engineering review of the Masonry llall Design for Nine Mile Point 1 is complete.
The enclosed Safety Evaluation supporting our findings is enclosed.
Sincerely, John
. 7wolinski, Director BWR Proiect Directorate 81 Division of BWR Licensino
Enclosure:
Safety Evaluation cc w/enclosure:
See next oage
Mr. C. V. Mangan Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station, Unit No.
1 CC:
Troy B. Conner, Jr., Esquire Conner 5 Wetterhahn Suite 1050 1747 Pennsylvania
- Avenue, N.
W.
Washington, D.
C.
20006 Frank R. Church, Supervisor Town of Scriba R.
D. ¹2
- Oswego, New York 13126 Niagara Mohawk Power Corporation ATTN:
Mr. Thomas Perkins Plant Superintendent Nine Mile Point Nuclear Station Post Office Box 32
- Lycominq, New York 13093 Resident Inspector U. S. Nuclear Reaulatory Commission Post Office Box 126
- Lycomino, New York 13093 John W. Keib, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, New York 13202 Rdgional Administrator, Reqion I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Jay Dunkleberger Division of Policy Analysis and Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223