ML17058A509

From kanterella
Jump to navigation Jump to search
Forwards Mgt Meeting Rept 50-410/85-21 on 850617.Results of QA Verification of Large Bore Pipe Support Installations Discussed.Discussion Scheduled on 850723 Re Hardware Commodity Results
ML17058A509
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/12/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058A510 List:
References
NUDOCS 8507170397
Download: ML17058A509 (4)


See also: IR 05000410/1985021

Text

JVL 12 1985

Docket No. 50-410

Niagara

Mohawk Power Corporat,ion

ATTN:

Mr. William G.

Hooten

Executive Director

Nuclear Operations

c/o Miss Catherine

R. Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Management

Meeting

NRC Report

No. 50-410/85-21

This refers to the meeting

held at our request at the

NRC Region I Office, King

of Prussia,

Pennsylvania,

on June

17,

1985 relating to activities authorized

by

NRC License

No.

CPPR-112.

The details of the discussions

at this meeting

are included

in the

NRC Management

Meeting Report

No. 50-410/85-21.

This meeting

served

as

a forum to discuss

the results of the Niagara

Mohawk

guality Assurance verification of Large Bore Pipe Support installations.

The

results of the engineering

analyses

of the identified nonconforming conditions

were presented.

The technical

basi s for the weld acceptance

has

been further

reviewed

as documented within Inspection

Reports

85-06

and 85-19.

We have

scheduled

future discussions

for July 23 regarding other hardware

commodity guality Assurance

reinspection results.

Your cooperation with us is appreciated.

Sincerely,

Orig1nal SLgr og ~<

Samuel

J. Collins, Chief

Project Branch

No.

2

Division of Reactor Projects

Enclosure:

NRC Region I Management

Meeting Report

No. 50-410/85-21

Attachment

1:

Material provided

by Niagara

Mohawk Power Corporation

at June

17,

1985 meeting.

SSD71703~7

86DI~~

pgg

ADOCK 05000+>>,,'

PDR,,

l

OFFICIAL RECORD

COPY

MR NMP2 85-21 - 0001.0.0

ll/29/80

0

Niagara

Mohawk Power Corporation

2

cc w/encls:

Connor 5 Wetterhahn

John

W. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

.C.

Beckham,

NMPC

QA Manager

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room ( LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encls:

Region I Docket

Room (with concurrences)

Senior Operations Officer (w/o encls)

State

Liaison Officer (SLO)

Director,

DRP

J. Linville, DRP

J. Grant,

DRP

Director,

DRS

Director,

DRSS

H. Wong,

IE

R

DRP

L

vi1 e/jc

s/v 0

1 1 ins

OFFICIAL RECORD

COPY

MR NMP2 85-21 - 0002.0.0

11/29/80

y

0'r