Forwards Insp Rept 50-410/85-13 on 850429-0607.No Violations Observed.Nrc 850409 Concern Re Installation of Gould Electrical Equipment Closed
ML17058A504
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/08/1985
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hooten W
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17058A505 List:
References
NUDOCS 8507160145
Download: ML17058A504 (4)


See also: IR 05000410/1985013

Text

JUL 08

1985

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN: Mr. William G.

Hooten

Executive Director-Nuclear Operations

c/o Miss Catherine Seibert

300 Erie Boulevard West

Syracuse,

New York

13202

Gentlemen:

Subject:

Inspection

No. 50-410/85-13

This refers to the routine inspection

conducted

by Mr. R.A.Gramm and

R.

M. Wheeler of this office on April 29 to June

7,

1985 at Nine Mile Point,

Unit 2, Scriba,

New York of activities

authorized

by

NRC License

No.

CPPR-112

and to the discussions

of our findings held by Mr. Gramm with Mr. C.

Beckham

and other members of your staff at the conclusion of the inspection.

Areas

examined during this examination

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter. Within these

areas,

the

inspection consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

By letter dated April 9,

1985

we requested

that you investigate

a concern

expressed

to us regarding

Gould electrical

equipment installations.

We

reviewed the results of your efforts which were

summarized within your letter

dated

May 8,

1985.

We concur that engineering criteria were not changed

in an

unauthorized

manner

and that the problems with shipping split hardware

problems

had

been

originally identified by site guality Control.

This concern is closed.

On the basis of our review of several

other outstanding

NRC concerns

and the

item regarding

Gould equipment, it appeared

that site deficiency identification

and resolution

programs

had occasionally failed to assess

the complete

scope of

deficiencies.

We encourage

you to use

problem identification/resolution

mechanisms

to assess

the generic aspects

of identified deficiencies.

Within the

scope of this inspection,

no violations were observed.

No reply to this letter is required.

Your cooperation with us in

this matter is appreciated.

Sincerely,

8507160145

850708

PDR

ADQCK 05000010

6

PDR'riginal Signed.3y g

Samuel J. Collins, Chief

Projects

Branch

No.

2

Division of Reactor Projects

OFFICIAL RECORD

COPY

IR NMP2 85-13

0001.0.0

06/26/85

C

C

C

P

~

Niagara'Mohawk

Power Corporation

JUL 0 g 1985

Enclosure:

Region I NRC Inspection

Report

Number

50-410/85-13

cc w/encl,

Connor

& Wetterhahn

John

W. Keib, Esquire

D.

Quamme,

NMP-2 Project Director

C.

Beckham,

NMPC QA Manager

Department of Public Service,

State of New York

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York

bcc w/encl:

Region I Docket

Room (with concur rences)

Senior Operations Officer (w/o encls)

Chief, Engineering

Programs

Branch

J. Linville, Section Chief,

DRP

J. Grant,

DRP

State

Liaison Officer (SLO)

G. Walton,

DRP

I:DRP

Linvilie/gcb

6p/P /85

Collins

OFFICIAL RECORD

COPY

IR NMP2 85-13

0001.1.0

06/26/85

I

1

'

i

oO