Confirms Dates of 930628-0716 for Svc Water Sys Operational Performance Insp at Units 1 & 2
ML17056C358
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 04/19/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 9304260004
Download: ML17056C358 (14)


Text

FORD 1 REGULATORY INFORMATION DISTRIBUTE u

SYSTEM (RIDS)

ACCESSION NBR:9304260004 DOC.DATE: 93/04/19 NOTARIZED: NO DOCKET ¹

-FACIL:50-220 Nine Mile Point Nuclear Station, Unit 1, Niagara Powe 05000220 50-410 Nine Mile Point Nuclear Station, Unit 2; Niagara Moha 05000410 AUTH.NAME AUTHOR AFFILIATION DURR,J.P.

Region 1 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION SYLVIA,B.R.

Niagara Mohawk Power Corp.

SUBJECT:

Confirms dates of 930628-0716 for svc water sys operational performance insp at units 1

6 2.

.DISTRIBUTION CODE:*IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD1-1 PD MENNING,J INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE-Eg~

REG FIL 02 Nl F1LE 01 EXTERNAL EG&G/BRYCEiJ

~ H ~

NSIC COPIES LTTR ENCL 1-1 1

1" 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME BRINKMAN,D.

AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPBl NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES

'LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

NOTE TO ALL RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOh1 P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

Docket Nos.

SO-220 SO-410 Mr. B. Ralph Sylvia Executive Vice President - Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road Syracuse, New York 13212

Dear Mr. Sylvia:

Subject:

SERVICE WATER SYSTEM OPERATIONALPERFORMANCE INSPECTION AT NINE MILEPOINT, UNITS 1 and 2 This letter confirms the dates of June 28 - July 2, and July 12 - 16, 1993 for a service water system operational performance inspection {SWSOPI) at Nine Mile Point, Units 1 and 2. A pre-inspection visit by the team leader and some team members is also scheduled during the week of June 14, 1993, to gather information requested in the enclosure to this letter.

The primary objectives of this inspection willbe to assess the design, operation, maintenance, surveillance, and testing aspects of the service water system (SWS) at ¹ine Mile Point, Units 1 and 2 and to determine whether the SWS is capable of performing its intended safety functions during all plant operating and accident conditions.

The team will also evaluate the implementation of the quality assurance and corrective action programs as related to the SWS and your planned and completed actions in response to Generic Letter 89-13, "Service Water System Problems Affecting Safety-Related Equipment".

We request that you make available the information listed in the enclosure for each unit during the pre-inspection visit scheduled for the week of June 14, 1993.

Your cooperation with us during this inspection willbe appreciated.

Should you have any questions regarding the information requested or the inspection, please contact the team leader, Mr. Leonard Prividy at (215) 337-5140 or me at (21S) 337-5282.

Sincerely, Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety

Enclosure:

SWSOPI Information Request 9304260004 980419 PDR ADOCK 05000220 8

PDR OFFICIAL RECORD COPY A:NMPSWOPI.LTR

+peal

Mr. B. Ralph Sylvia cc w/encl:

C. Terry, Vice President - Nuclear Engineering J. Perry, Vice President - Quality Assurance Vice President - Nuclear Generation K. Dahlberg, Unit 1 Plant Mar~er M. McCormick, Unit 2 Plant Manager D. Greene, Manager, Licensing J. Warden, New York Consumer Protection Branch G. Wilson, Senior Attorney M. Wetterhahn, Winston and Strawn Director, Energy A. Water Division, Department of Public Service, State of New York C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New York, SLO Designee bcc w/encl:

Region I Docket Room (with concunences)

P. Eapen, DRS P. Drysdale, DRS L. Prividy, DRS S. Stewart, DRS C. Cowgill, DRP L. Nicholson, DRP

'J. Yerokun, DRP W. Schmidt, SRI - ¹ine Mile V. McCree, OEDO R. Capra, NRR J. Menning, NRR D. Brinhnan, NRR DRS/EB SALP Coordinator D. Holody, EO RI DRS Prividy 4/i%93 RIWD Durr 4/$93 OFFICIALRECORD COPY A:NMPSWOPI.LTR

L E

ERF RMAN E PE N AT

~:

This information request applies to those Unit 1 and 2 service water systems or portions thereof to which Generic Letter 89-13 applies.

For ease of reference, the information should be appropriately labeled and organized by unit and category/item number (e.g., Design, Item 2. - SW system description).

1.

Niagara Mohawk docketed responses and followup actions to Generic Letter 89-13.

2.

Charts of the plant and engineering organizations.

Pj <Liinn:

Design basis and other design documents (procurement specifications of all equipment such as pumps, heat exchangers, valves, orifices, strainers, etc.; significant design changes with associated documentation; thermal and hydraulic calculations and analyses; a summary of normal and accident heat load inputs to the service water system (SWS)).

2.

SW system description.

3.

The Unit 2 secondary containment drawdown analysis with time dependent heat inputs.

4.

Certified pump curves (witnessed test curves).

5.

Cros's-sectional drawings of major equipment such as pumps and heat exchangers.

k 6.

7.

Piping and instrument diagrams (P&IDs) for the SWS, its lubricating water system, and other interconnected and auxiliary systems.

Licensing requirements and commitments, ifnot already included in the FSAR.

8.

Documents related to the present SWS status such as temporary modifications, technical specification interpretations, etc.

9.

10.

Analyses supporting single active failure adequacy.

Flow data for system components and heat transfer data for heat exchanger/coolers for the various SWS operating modes.

=

11.

Water hammer/pressure surge protection information.

12.

A list and description of SWS modifications performed with the applicable safety evaluations.

The entire modification package is not intended in this request.

13.

Any justifications for continued operation or non-modification safety evaluations written since January, 1989 and involving the SWS.

14.

Allrelevant documentation,

analyses, implementation procedures, inspection results, etc. credited for satisfying the actions requested by Generic Letter 89-13 in the design area.

Q~~~n:

SWS (including ultimate heat sink, traveling screens, etc.) training information for licensed and non-licensed operators including lesson plans, training text, handout material, task performance measures, etc. covering system alignment, operation, and abnormal conditions or emergency response.

2.

SWS operating procedures

{including ultimate heat sink, traveling screens, etc.) for system alignment, operation, and abnormal conditions or emergency response.

3.

SWS alarm response procedures for evaluating and responding to control room or local alarms.

4.

PkIDs and logic diagrams for the SWS, its lubricating water system, and other interconnected and auxiliary systems.

5.

Allrelevant documentation,

analyses, implementing procedures, inspection results, etc. credited for satisfying the actions requested by Generic Letter 89-13 in the operations area.

Preventive and corrective maintenance procedures for the SWS components, related instrumentation and power supplies.

2.

Vendor manuals for the previous item.

3.

Maintenance history for selected components for the last 2 years.

This list of selected components willbe provided later.

4.

Training information for maintenance personnel including lesson plans, training text, handout material, task performance measures, etc. covering training and qualification for skills used in maintaining the SWS (including ultimate heat sink, traveling screens, etc.).

5.

A list of the SWS maintenance backlog.

6.

A list of the S%S maintenance activities scheduled for the period June 14, 1993 to July 16, 1993.

7.

Implementing procedures and trending information associated with the ASME Section XI inservice testing program for SWS pumps and valves.

8.

9.,

Copies of LCO logs from Ma'rch, 1991 through March, 1993.

Allrelevant documentation,

analyses, implementing procedures, inspection results, etc. that are credited for satisfying the actions requested by Generic Letter 89-13 in the maintenance area.

'n:

I 1.

A copy of the completed preoperational SWS test procedure or a copy of any subsequent completed SWS test procedure that may have superseded the preoperational test.

2.

A copy of the most recent completed Technical Specification procedures for the S%S, including the integrated ESF test ifapplicable.

3.

A list of programs and procedures that Niagara Mohawk credits for maintaining the condition and demonstrating the operability of the S%S (e.g., periodic inspection programs for biofouling, silting, erosion, corrosion, etc.).

4.

A list of SWS surveillance and test activities scheduled during the period June 14, 1993 to July 16, 1993.

5.

Allrelevant documentation,

analyses, implementing procedures, inspection adults, etc. that are credited for satisfying the actions requested by Generic Letter 89-13 in the surveillance and testing area.

i A

'v A 'n:

1.

Licensee event reports and enforcement actions written since January, 1989 and involving the SWS.

4 Plant onsite review committee and offsite safety review committee meeting minutes for the past 6 months.

Niagara Mohawk QA type nonconformance reports written against SWS components since January, 1990.

Niagara Mohawk QA verification activities (e.g., technical audits or surveillances) or other self assessment reports related to the SWS since January, 1990.

A list of the open items applicable to QA or self assessment identified findings for the SWS.