Forwards Resident Safety Insp Repts 50-220/92-25 & 50-410/92-29 on 921101-1212 & Forwards Notice of Violation. Excellent Response to Degrading Condition in Reactor Protection Sys & Response to Scram Condition Noted
ML17056C224
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 01/12/1993
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056C225 List:
References
NUDOCS 9301190026
Download: ML17056C224 (8)


See also: IR 05000220/1992025

Text

Docket Nos.

50-220

50-410

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

301 Plainfield Road

Syracuse,

New York

13212

Dear Mr. Sylvia:

Subject:

NRC Region I Combined Inspection Report No. 50-220/92-25 and

50-410/92-29

This refers to the results of the routine resident safety inspection conducted by Messrs.

W. Schmidt, W. Mattingly, S. Greenlee,

and P. Drysdale from November

1 through

December

12, 1992, at Nine Mile Point Units

1 and 2, Scriba, New York. Mr. Schmidt

discussed

the inspection findings with members of your staff at the exit meeting conducted on

December 22, 1992.

This inspection was directed toward areas important to public health and safety.

The

enclosed NRC Region I Inspection Report describes

the areas examined during the

inspection.

Within these areas,

the inspection consisted of observation of activities in

progress,

interviews with personnel,

and selective examinations of procedures

and

representative

records.

Both units were operated safely by your staff.

Excellent response

to a degrading condition in

the reactor protection system at Unit 2 and subsequent

excellent response

to the scram

condition were observed.

We do note that there was another partial loss of offsite power

caused by a failure of an offsite breaker.

The issue of control and maintenance of these

breakers remains a concern because of their potential effect on and challenges to safety-

related systems.

During observations of a surveillance test on the standby liquid control system we noted that

testing personnel did not notify the inservice testing department or prepare a procedure

change,

as required by the procedure,

when a test equipment gauge with a range outside of

that specified by the procedure was installed and used.

The safety significance of this

installation was minor, because

the gauge provided a digital read out.

During our review we

noted that the use of gauges with ranges outside the inservice testing plan requirements

has

been

a previous problem.

The failure to use appropriate equipment or make the appropriate

notifications is a violation

f

930ii90026 930ii2

PDR

ADOCK 05000220

8

PDR

~>(

ir

Niagara Mohawk Power Corporation

Based on the results of this ins ectionp, you are required to respond to this letter and should

follow the instructions relative to the Notice when preparing your response.

In your

response,

you should document the specific actions taken and any additional action you plan

to prevent recurrence of these types of issues.

Your cooperation with us is appreciated.

Sincerely,

Curtis J. Cowgill, Chief

Projects Branch No.

1

Division of Reactor Projects

Enclosures:

1.

NRC Region I Combined Inspection Report Nos. 50-220/92-25 and 50-410/92-29

2.

Appendix A, Notice of Violation

OFFICIALRECORD COPY

a:IR-25-29

0

cc w/encl.

N. Cams, Vice President - Nuclear Generation

C. Terry, Vice President - Nuclear Engineering

J. Perry, Vice President - Quality Assurance

J. Firlit, Vice President - Nuclear Support

K. Dahlberg, Unit 1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Energy & Water Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO-RI (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

Niagara Mohawk Power Corporation

bcc w/encls:

Region I Docket Room (with concurrences)

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee, DRP

V. McCree, OEDO

J. Lieberman, OE

R. Capra, NRR

D. Brinkman, NRR

J. Menning, NRR

D. Holody, EO

DRS/EB SALP Coordinator

DRSS SALP Coordinator

bcc w/Letter, Notice of Violation, Report Cover Sheet and Executive Summary Only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Lanning, DRS

L. Bettenhausen,

DRS

J. Durr, DRS

R. Cooper, DRSS

S. Shankman,

DRSS

J. Joyner, DRSS

RI:DRP

W

'dt/ss

RI:DRP

LNic

son

RI:D

CCowgill

// /+

j/57+

(/+92

OFFICIALRECORD COPY

a:IR-25-29

0