Amend 135 to License DPR-63,revising TS SR 4.1.4.b to Extend Current Quarterly Pump Surveillance Test Interval for Core Spray Sys 11 from 930110 Until 930220
ML17056C190
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/17/1992
From: Capra R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17056C191 List:
References
NUDOCS 9212310057
Download: ML17056C190 (8)


Text

~pR RE@II~

~o I

0 0

Cy

~/+

o~

n ++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 NIAGARA MOHAWK POWER CORPORATION

.DOCKET NO. 50-220 NINE MILE POINT NUCLEAR STATION UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

135 License No.

DPR-63 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated October 16,

1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.

DPR-63 is hereby amended to read as follows:

92123iPo

~ p5ppp22p

~

p57 921227 PDR>>o PDR P

I

(2)

Technical S ecifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 135, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION

Attachment:

Changes to the Technical Specifications Date of Issuance:

December 17, 1992 Robert A. Capra, Director Project Directorate I-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

N

ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. >~>

TO FACILITY OPERATING LICENSE NO.

DPR-63 DOCKET NO.

5O-ZZO Revise Appendix A as fo11ows:

Remove Pa e

51 Insert Pa e

51

I

LIMITINGCONDITION FOR OPERATION 3.1.4 RE PRAY Y TEM SURVEILLANCE REQUIREMENT 4.1e4 RE PRAY Y TEM hUUSISE Applies to the operating status of the core spray systems.

Applies to the periodic testing requirements for the core spray systems.

~e~iv:

To assure the capability of the core spray systems to cool reactor fuel in the event of a loss-of-coolant accident.

Q)gg~ive:

.To verify the operability of the core spray systems.

Whenever irradiated fuel is in the reactor vessel and the reactor coolant temperature is greater than 212'F, each of the two core spray systems shall be operable except as specified in Specifications b and c below.

ae At each major refueling outage automatic actuation of each subsystem in each core spray system shall be demonstrated.

The core spray system surveillance shall+a performed as indicated below.

b.

C.

If a redundant component of a core spray system becomes inoperable, that system shall be considered operable provided that the component is returned to an operable condition within 7 days and the additional surveillance required is performed.

If a redundant component in each of the core spray systems becomes inoperable, both systems shall be considered operable provided that the component is returned to an operable condition within 7 days and the additional surveillance required is performed.

C.

At least once per quarter pump operability'hall be checked.

At least once per quarter the operability of power-operated valves required for proper system operation shall be checked.

Surveillance requirement 4.1.4.b does not apply to core spray system 11 from January 10, 1993, until the next plant shutdown but no later than February 20, 1993.

Amendment No.,

1 5~ >35 51