Forwards Insp Repts 50-220/92-18 & 50-410/92-20 on 920727-0804 & 0831-0901.Insp Reviewed Response to GL 88-14 & follow-up of Previous Concerns
ML17056C043
Person / Time
Site: Nine Mile Point  
Issue date: 09/30/1992
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056C044 List:
References
GL-88-14, NUDOCS 9210080002
Download: ML17056C043 (6)


See also: IR 05000220/1992018

Text

SEP 30 592

Docket Nos.

50-220

50-410

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

SAFETY INSPECTION AT NINE MILEPOINT, UNITS 1 AND 2 (NRC

COMBINED INSPECTION REPORT NOS. 50-220/92-18 AND

50-410/92-20)

This letter refers to the NRC inspection conducted by Mr. P. Drysdale of this office on

July 27 through August 4 and August 31 through September

1, 1992, at Nine Mile Point,

Units 1 and 2, Scriba, New York, of activities authorized by NRC License Nos. DPR-63 and

NPF-69 and to the discussions of our findings held by Mr. Drysdale with Messrs. J. Conway

and W. Yeager and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection Report

which is enclosed with this letter.

The inspection included a review of your response to

Generic Letter 88-14 for the Unit 1 Instrument Air System (IAS), and a follow-up on a

previous NRC concern related to improper isolation of a Unit 2 Service Water (SW) System

unit cooler.

Our inspector reviewed the ability of these systems to protect public health and

safety under design basis conditions.

No response to this letter is required; however, your attention is requested for a timely

resolution of unresolved design issues in the IAS for Unit 1 as discussed in paragraph" 1.0 of

the enclosed report.

In addition, as discussed in paragraph 2.0 of the enclosed report, 'your

cooperation is requested in the timely resolution of unresolved item 50-410/91-12-04 related

to Unit 2 SW performance under design conditions due to its potential significance for safe

plant operation.

Sincerely,

qllpp80002

0002pp

q20'730

PDR

ADOCK 0

8

Jacque P. Durr, Chief

Engineering Branch,

Division of Reactor Safety

Enclosure:

Inspection Report Nos. 50-220/92-18 and 50-410/92-20

Zsoj

i

Mr. B. Ralph Sylvia

cc w/encl:

J. Firlit, Vice President - Nuclear Support

C. Terry, Vice President - Nuclear Engineering

'.

Perry, Vice President - Quality Assurance

Vice President - Nuclear Generation

W. Yeager, Unit 1 Engineering Manager

K. Dahlberg, Unit 1 Plant Manager

M. McCormick, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Power Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

bcc w/encl:

Region I Docket Room (with concurrences)

P. Eapen, DRS

P. Drysdale, DRS

C. Cowgill, DRP

J. Yerokun, DRP

L. Nicholson, DRP

S. Greenlee, DRP

W. Schmidt, SRI - Nine Mile

R. Lobel, OEDO

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

DRS/EB SALP Coordinator

D. Holody, EO

SEP 3 0 T992

RI:DRS

Drysdale

//~)

9/2192

RS

n

948/92

DRS

Durr

98092

OFFICIALRECORD COPY

A:NINEMILE.PD

0