Forwards Schedular Exemption from Requirements of 10CFR50, App J Re Type C Testing of Emergency Condenser Condensate Return Valves & Shutdown Cooling Isolation Valves,Per Util 911212 Request
ML17056B742
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/20/1992
From: Capra R
Office of Nuclear Reactor Regulation
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B743 List:
References
TAC-M82276, NUDOCS 9203300340
Download: ML17056B742 (6)


Text

March 20, 1992 By letter dated December 12,

1991, Niagara Mohawk Power Corporation (NMPC) requested an extension to two existing schedular exemptions regarding Type C

testing of the Emergency Condenser Condensate Return Valves and the Shutdown Cooling Isolation Valves.

Additional information was provided by NHPC's letter dated January 17, 1992.

The NRC staff has reviewed the information provided in support of NMPC's request for extension to the two existing schedular exemptions.

On the basis of the submitted information and as discussed in the enclosed Exemption, the NRC staff has concluded that the requested extension to the previously-approved Exemptions is justified until the 1994 refueling outage.

Thus, your request for exemption is granted.

We find that granting the exemption is authorized by law, will not present an undue risk to the public health and safety, is con'sistent with the common defense and security, and meets the special circumstances described in 10 CFR 50.12(a)(2)(ii).

The Exemption has been forwarded to the Office of the Federal Register for publication.

Sincerely, Original Signed BY Robert A. Capra, DTrector Project Directorate I-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc w/enclosure:

See next a

e

Enclosure:

Exem tion Docket No. 50-220 DISTRIBUTION:

-Docket File RCapra CMcCracken, 8D1 Hr.

B. Ralph Sylvia NRC & Local PDRs CVogan

RLobel, EDO Executive Vice President, Nuclear PDI-1 Reading DBrinkman CCowgill, RGN-I Niagara Mohawk Power Corporation THurley/FMiraglia OGC 301 Plainfield Road JPartlow
EJordan, 3701
Syracuse, New York 13212 CRossi GHill(4), Pl-37 JLieberman ACRS(10)

Dear Hr. Sylvia:

SVarga OPA JCalvo OC/LFMB

SUBJECT:

ISSUANCE OF EXTENSION TO SCHEDULAR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, FOR NINE MILE POINT UNIT NO.

1 REGARDING TYPE C TESTING OF THE EMERGENCY CONDENSER CONDENSATE RETURN VALVES AND THE SHUTDOWN COOLING ISOLATION VALVES (TAC NO.

H82276) 0FFIcE PDI 1

LA PDI-1 PH

,SPLB OGC PDI CVOGAN BRINKHAN:tlc CHcCRACKEN DATE 3 /I>/92 Z /IZ/92

$ /

/92 I 1 /92

/

/92 0FF IGE ADRI IIANE JCALVO DR DATE 3

/ /92 92 OFFICIAL RECOR COPY FILENAME: A: II,NM182276. EXE 9203300340 920320 PDR ADOCK 05000220 P

PDR IIb'uIIM~ 4 ~I'j"-'~Q QIr I ~JINNI ) ~>l'Ll

l 1

JI ll 11 ll

gPR RECC 'fp

+

0

\\

0 Qh ~.

lf<<~~+

Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555

>larch 20, 1992 Mr. B. Ralph Sylvia Executive Vice President, Nuclear Niagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT'SSUANCE OF EXTENSION TO SCHEDULAR EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 50, APPENDIX J, FOR NINE MILE POINT UNIT NO.

1 REGARDING TYPE C TESTING OF THE EMERGENCY CONDENSER CONDENSATE RETURN VALVES AND THE SHUTDOWN COOLING ISOLATION VALVES (TAC NO.

M82276)

By letter dated December 12,

1991, Niagara Mohawk Power Corporation (NMPC) requested an extension to two existing schedular exemptions regarding Type C

testing of the Emergency Condenser Condensate Return Valves and the Shutdown Cooling Isolation Valves.

Additional information was provided by NMPC's letter dated January 17, 1992.

The NRC staff has reviewed the information provided in support of NMPC's request for extension to the two existing schedular exemptions.

On the basis of the submitted information and as discussed in the enclosed Exemption, the NRC staff has concluded that the requested extension to the previously-approved Exemptions is justified until the 1994 refueling outage.

Thus, your request for exemption is granted.

We find that granting the exemption is authorized by law, will not present an undue risk to the public health and safety, is consistent with the common defense and security, and meets the special circumstances described in 10 CFR

50. 12(a)(2)(ii).

The Exemption has been forwarded to the Office of the Federal Register for publication.

Sincerely,

Enclosure:

Exemption cc w/enclosure:

See next page

+4<c c' Robert

. Capra, Director Projec irectorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

~

r g

~

Mr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.

1 CC:

Hark J. Wetterhahn, Esquire Winston 5 Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382

Oswego, New York 13126 Hr. Joseph F, Firlit Vice President Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 126
Lycoming, New York 13093 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Hs.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Hr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Hr. David K. Greene Manager Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
Syracuse, New York 13212 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Mr. Paul D.

Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza

Albany, New York 12223