Forwards SER & EGG-NTA-8515, Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Nine Mile Point,Unit 1, Supporting Relief Requested by Util.One Relief Request Re Proposed Alternative Testing Partially Denied
ML17056B359
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/07/1991
From: Capra R
Office of Nuclear Reactor Regulation
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B360 List:
References
TAC-60450, NUDOCS 9103140134
Download: ML17056B359 (8)


Text

A<Co

) ~G+.

Wp n

I 4~

~O

+w*w+

Docket No. 50-220 UNITED STATES NUCLEAR REGULATORY COIVIIVIISSION WASHINGTON, D.C. 20555 March 7, 1991 Mr. B. Ralph Sylvia Executive Vice President, Nuclear tliagara Mohawk Power Corporation 301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

SAFETY EVALUATION OF SECOND TEN-YEAR INTERVAL INSERVICE TESTItlG PROGRAM FOR PUMPS AND VALVES, NINE MILE POINT NUCLFAR STATION, UNIT tlO.

1 (TAC NO. 60450)

By letter dated March 28, 1989, whi ch superseded all previous IST program submittals, Niagara Mohawk Power Corporation (NMPC) submitted to the NRC the Nine Mile Point Nuclear Station, Unit No.

1 Second Ten-Year Interval Inservice Testing (IST) Program Plan, Revision 2, for pumps and valves.

The submitted program plan covers the second ten-year inspection interval from June 1, 1986 to June 1, 1996.

The program is based on the requirements of Section XI of

'he ASME Boiler and Pressure Vessel

Code, 1983 Edition through the Summer of 1983 Addenda.

The NRC staff, with technical assistance from EG&G Idaho, Inc.

(EG&G),

has reviewed and evaluated the IST program and requests for relief submitted for Nine t1ile Point Unit 1.

The staff adopts the evaluations and conclusions contained in the enclosed Technical Evaluation Report (TER) as prepared by EG&G.

We have determined that certain Section XI Code requirements cited by NMPC are impractical to perform at Nine Mile Point 1.

In such instances we have granted relief from those requirements.

The granting of relief is based upon the fulfillment of any commitments made by NMPC in its basis for each relief request and the alternative proposed testing.

One relief request was partially denied (TER Section 3.9.1.1),

11 relief requests were granted with certain conditions (TER Sections 2.1.1.1, 2.1.2.1, 2.1.2.2, 2.3.1.1, 2.5.1.1, 3.1.4.1, 3.4.1.1, 3.4.2.1, 3.4.2.2, 3.5.1.1, and 3.6.2.1),

and four relief requests were granted on an interim basis (TER Sections 3.2.1.1, 3.6.1.1, 3.7.2.1, and 3.10.1.1).

For the relief that is being granted, we have determined that the Code requirements are impractical and that the relief requests are authorized by law and will not endanger life, property or the common defense and security and are otherwise in the public interest giving due consideration to the

(~X 9103i40i30 Vi0307 PDR ADOCK 05000220

/

~

~

0 C

l l(

II a t1r. B. Ralph Sylvia rch 7, 1991 burden upon the licensee that could result if the requirements were imposed on the facility.

The requests for relief comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1.

Accordingly, relief from certain provisions of Section XI of the ASME Boiler and Pressure Vessel Code and the applicable addenda is hereby granted, as described in the enclosed Safety Evaluation AND TER.

This completes our efforts in response to your submittal as listed above and TAC tto. 60450.

Sincerely,

Enclosures:

1.

Safety Evaluation 2.

TER No.

EGG-NTA-8515 cc w/enclosures:

See next page Distribution:

Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation NAtlE DATE

CVogan ~
p/g /91

~Docket File PDI-1 Reading JPartlow RACapra DBrinkman EJordan ACRS (10)

OC/LFMB AKelle r C:PDI-1:LA NRC 8 Local PDRs TMur1 ey/FMirag 1 ia CRossi CVogan OGC GHill GPA/PA Plant File JLinvi 1 le

PDI-1:Ptl:

GC

PDI-1:D pa@.
DBr inkman: cs: g Q~($
RAGapra

%\\0

S // /91:3/

) /91:3/'7/91 FICIAL RECORD C

PY Document Name:

NMP1 LTR TO B SYLVIA

l

\\'

"I I

d

', I d

I ~"

I d

d d'I I

d

'II f

'I

  • I 4 d

i I

~

-d I

I I

I f

March 7, 1991 Hr. B. Ralph Sylvia burden upon the licensee that could result if the requirements were imposed on the facility.

The requests for relief comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1.

Accordingly, relief from certain provisions of Section XI of the ASME Boiler and Pressure Yessel Code and the applicable addenda is hereby granted, as described in the enclosed Safety Evaluation and TER.

This completes our efforts in response to your submittal as listed above and TAC No. 60450.

Sincerely,

Enclosures:

1.

Safety Evaluation 2.

TER No.

EGG-NTA-8515 Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc w/enclosures:

See next page

l

)

J'

Mr. B. Ralph Sylvia Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No.

1 CC:

Mr. Mark J. Wetterhahn, Esquire Winston 8 Strawn

.1<00 L Street, NW.

Washington, D.C.

20005-3502 Supervisor Town of Scriba R.

D. 44

Oswego, New York 13126 Mr. Joseph F. Firlit Vice President - Nuclear Generation Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Post Office Box 32
Lycoming, New York 13093 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 126
Lycoming, New York 13093 Mr. Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
Syracuse, New York 13202 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.

Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor

Albany, New York 12223 Mr. Kim Dahlberg Unit 1 Station Superintendent Nine Mile Point, Nuclear Station Post Office Box 32
Lycoming, New York 13093 Mr. Peter E. Francisco, Licensing Niagara Mohawk Power Corporation 301 Plainfield Road
Syracuse, New York 13212 Charlie Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Mr. Paul D.

Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza

Albany, New York 12223