Il+*+4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 NIAGARA MOHAWK POWER CORPORATION DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
24 License No. NPF-69 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated April 3, 1990, as supplemented June 29,
- 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter 1;
B.
The facility will operate in conformity with the application.
the provisions of the Act, and the rules and regulations of the COIImIission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by the deletion of par agraph 2.C(9)
Part (a) from Facility Operating License No. NPF-69.
90iaaiooa9 90iaia PDR ADQCK 050004i0 P
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
+ Robert A. Capra, Director Project Directorate 1-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance:
December 18, 1990
~g REPy
~4
~o o
I<<I0 Yr I
UNITEDSTATES NUCLEAR REGULATORYCOMMISSION WASHINGTON, D. C. 20555 ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO.
24 TO FACILITY OPERATING LICENSE NO.
NPF-69 DOCKET NO. 50-410 Revise Appendix A as follows:
~R Page 5 of License No.
NPF-69 Insert Pa e
Page 5 of License No.
(6)
Inftfal Startu Test Program (Section 14,
- SER, SSERs 4 and 5)
Any changes to the 1nitial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such chanoe.
(7) 0 eratfon with Reduced Feedwater Tem erature (Section
- 15. 1, Niagara Mohawk Power Corporatfon shall not operate the facility with reduced feedwater temperature for the purpose of extending the normal fuel cycle.
The facility shall not be operated with a feedwater heating capacity less than that requi red tc proouce a
feedwater temperature of 400'F at rated steady-state conditions unless analyses supporting such operations are submitted by Niagara Mohawk Power Corporation and approved by the staff.
(8)
Safet Parameter Dis la S stem SPDS Section 18.2 SSERs 3 and 5
Prior to startup following the first refueling outage, Niagara Mohawk Power Corporation shall have operational an SPDS that includes the revisions described fn their letter of November 19, 1985 Before declaring the SPDS operational, the licensee shall complete testfng adequate to ensure that no safety concerns exist regarding the operation of the Nine bafle Point Nuclear Station, Unit No.
2 SPDS.
(9)
Detailed Control Room Desi n Review (Section 18.1 SSERs 5 and 6
(b)
Prior to startup following the first refueling outage, Niagara Mohawk Power Corporation shall provide the results of the reevaluation of normally lft and nuisance alarms for NRC review fn accordance with fts August 21, 1986 letter.
(c)
Prior to startup following the first refueling outage, Niagara Mohawk Power Corporation shall complete permanent zone banding of meters fn accordance wfth its August 4, 1986 letter.
D.
The facility requires exemptions from certain requirements of 10 CFR Part 50 and 10 CFR Part 70.
Amendment No.
24
~ ~