ML17056B118
| ML17056B118 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 11/09/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Burkhardt L NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17056B119 | List: |
| References | |
| NUDOCS 9011200218 | |
| Download: ML17056B118 (4) | |
See also: IR 05000220/1990021
Text
NQY 0 9 lS80
Docket Nos.
50-220
50-410
Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt, III
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
13212
Gentlemen:
Subject:
Combined Inspection
Report No. 50-220/90-21
and 50-410/90-23
This letter transmits
the
NRC Region I inspection report for the inspections
conducted
by Messrs.
R.
K. Mathew and
R. Bhatia of this office on
October 9-12,
1990, at Niagara
Mohawk, Salina
Meadows Office in Syracuse,
New
York and at Nine Mile Points Units
1 and 2.
Mr. Mathew discussed
the findings
of the inspection with members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
focused
on closure of previous inspection
outstanding
items which are described
in the
NRC Region I Inspection
Report
which is enclosed with this letter.
Within these
areas,
the inspection consisted
of selective
examinations of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspectors.
Within the
scope of this inspection,
no violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Q~> >)~)
Jacque
P. Durr, Chief
Engineering
Branch
Divi si on
of Reactor
Sa fety
Enclosure:
NRC Region I Inspection
Report Nos.
50-220/90-21
and 50-410/90-23
'POI 12002) 8 901109
ADOCN, 05000220
G
PNU
OFFICIAL RECORD
COPY
CIR
NM 90/21-23
0001.0.0
11/08/90
HOV 0.9 890
Niagara
Mohawk Power Corporation
2
cc w/encl:
R. Sylvia, Senior Vice President
W. Hansen,
Manager,
Corporate Quality Assurance
M. Colomb, Unit 2 Superintendent,
Operations
C.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J.
Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit
1 Station Superintendent
R. Randall, Unit
1 Superintendent,
Operations
J. Firlit, Vice President,
Nuclear Generation
C. Terry, Vice President
Nuclear Engineering
and Licensing
J . Wardeh,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
Director,
Power Division, Department of Public Service,
State
State of New. York, Department of Law,
Public Document
Room
(PDR)
Local Public Document
Room ( LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
K. Abraham,
PAO (28)
SALP Report
and (2) All Inspection
Repor
State of New York,
SLO Designee
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
ORNA (w/o encl)
R. Bellamy,
DRSS
J. Linville, DRP
D. Vito,
G. Meyer,
M. Miller, DRP
M. Conner,
Only)
J.
Caldwell,
R. Martin,
R. Capra,
of New York
ts
RI: DRS
RI:DRS
P4athew/gcb
tawBhati a
II i I/5o
141
/90
Qb'/90
RI:DRS
Anderson
A/g /gg
/l
I//g//M