ML17056B082

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/90-08 & 50-410/90-08 on 900823-1003.Overall Performance Satisfactory
ML17056B082
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 10/26/1990
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B083 List:
References
NUDOCS 9011070265
Download: ML17056B082 (4)


See also: IR 05000220/1990008

Text

Docket No. 50-220

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President - Nuclear

301 Plainfield Road

.

Syracuse,

New York

13212

Gentlemen:

Subject:

NRC Region I Combined Inspection

Report Nos. 50-220/90-08

and

50-410/90-08

This

letter" transmits'he

results

of the

routine

inspection

conducted

by

Messrs.

W. Cook,

R. Laura,

R.

Temps

and

others

of

this

office

on

August 23,

1990

through

October 3,

1990,

at

Nine

Mile Point

Units

1

and

2,

Scriba,

New

York.

A

summary

of

the

findings

was

presented

to

Messrs.

K. Dahlberg,

R. Abbott and other members of your staff at the conclusion of the

inspection.

Overall

performance

at both units during this inspection

period

was satisfac-

tory.

Your progres's,

to date,

in completing the

Power Ascension

Testing

Pro-

gram at Unit

1

has been'haracterized

by conservatism

and

thoroughness

with a

continued

emphasis

on

safety.

We encourage'ou

and

your

staff

to

maintain

these

high standards.

We appreciate

your cooperation.

Sincerely,

>(.'

~ r ~

~

ggP~ll8 J ~'"."'-

BY:

O'Ji~QILL

Curtis J. Cowgill, Acting Chief

Reactor Projects

Branch

No.

1

Division of Reactor Projects

Enclosure:

NRC Region I Combined Inspection

Report Nos. 50-220/90-08

and

50-410/90-08

OFFICIAL RECORD

COPY CIR 9 MILE 90-08 - 0001.0. 0

10/16/90

PEi

'-"(>1 j (.')7(.> <<gg

, ri:ic

0

Niagara

Mohawk Power Corporation

ggT,;: 1390

cc w/encl:

R. Sylvia, Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit 1 Station Superintendent

R. Randall, Unit

1 Superintendent,

Operations

J. Firlit, Vice President

and General

Superintendent

C. Terry, Vice President

Nuclea~ Engineering

and Licensing

J.

Warden,

New York Consumer

Protection

Branch

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC 'Resident

Inspector

State of New York,

SLO Designee

bcc w/encl:

=

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

J. Linville; DRP

G. Meyer,

DRP

D. Vito, DRP

R.

Summers,

DRP

M. Miller, DRP

R. Bellamy,

DRSS

R, Capra,

NRR

'R. Martin,

NRR

J. Caldwell,

EDO

K. Abraham,

PAO, (2)

RI: DRP

7'~WCook/mjd

10/)C /90

RI:DRP

WSchmidt

10hq/90-

RI: DRP

CCowgil

10/g5/90

OFFICIAL RECORD

COPY CIR 9 MILE 90-08 - 0002.0.0

10/16/90