ML17056B003

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-220/90-07 & 50-410/90-07 on 900712- 0822.Performance by Maint Organization Identified as Concern Based Upon Two Forced Shutdowns at Unit 1 Due to maint-related Activities
ML17056B003
Person / Time
Site: Nine Mile Point  
Issue date: 09/06/1990
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056B004 List:
References
NUDOCS 9010010044
Download: ML17056B003 (4)


See also: IR 05000220/1990007

Text

Docket No. 50-220

Docket No. 50-410

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear

301 Plainfield Road

Syracuse,

New York

13212

SEP g 8 )99g

Gentlemen:

Subject:

NRC Region I Combined Inspection Report Nos. 50-220/90-07

and 50-410/90-07

We note

that. Unit

1

and

2 Operations

staffs'erformance

were

generally good, particularly with respect to the restart of Unit, 1

and associated

power ascension

testing.

However,

performance

by

the

maintenance

organization

is of concern

based

upon the

two

shutdowns at Unit 1 due to maintenance

related activities.

forced

This letter

transmits

the

results

of the

routine

inspection

conducted by Messrs.

W. Cook, R. Laura,

R. Temps and others of this

office on July 12 through August 22,

1990 at Nine Mile Point Units

1 and 2, Scriba,

New York.

A summary of the findings was presented

to Messrs.

K. Dahlberg,

R. Abbott and other members of your staff

at the conclusion of the inspection.

Sincerely,

G.'iprfg(,,'e(]@) 8

-dl'I'ega

f,'ames C. Linville, Chief

Projects

Branch No.

1

Division of Reactor Projects

Enclosure:

NRC Region I, Combined Inspection Report No. 50-220/90-07

and 50-

410/90-07

Official Record

Copy

.

PO j,00 g 0044

QO(.)9QQ

PDR

AGOCK Ci.000220

9

PDC".

Niagara

Mohawk Power Corporation

cc w/encl:

SEP 06 >88g

R. Sylvia, Senior Vice President

W. Hansen,'anager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry, Vice President,

Quality Assurance

K. Dahlberg, Unit 1 Station Superintendent

R. Randall, Unit 1 Superintendent,

Operations

J. Firlit, Vice President

Nuclear Generation

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection Branch

M. Wetterhahn, Jr.,

Esquire

G. Wilson, Senior Attorney

Director, Power Division, Department of Public Works, State

York

State of New York, Department of Law

Public Document

Room

(PDR)

Local Public Document

Room

(LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident Inspector

State of New York

of New

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encls)

J. Wiggins, Deputy Director,

DRP

R. Bellamy, Chief,

FRSS,

DRSS

G. Meyer, Chief,

DRP

1B

R. Capra, Director

PD I-1,

NRR

R. Martin, Project Manager, Unit 1 and 2,

NRR

M. Connor,

TSS

(Salp Reports

Only)

State Liaison Officer (SLO)

J. Caldwell,

EDO, Region

1 Regional Coordinator

K. Abraham,

PAO, Region I (2)

bcc w/letter and executive

summary only:

T. Martin,

RA

W. Kane,

DRA

W. -Hehl,

DRP

W. Hodges,

DRS

M. Knapp,

DRSS

R. Gallo,

DRS

J. Durr,

DRS

Concurrences:

Cook

9/'90

Meyer

nville

9/g/90

/( />0

Official Record

Copy