Forwards Requalification Program Evaluation Rept 50-220/90-19OL Administered During Wks of 900709 & 16.Three Unresolved Items Noted.Program Rated as Satisfactory
ML17056A953
Person / Time
Site: Nine Mile Point 
Issue date: 08/22/1990
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A954 List:
References
NUDOCS 9009060092
Download: ML17056A953 (6)


See also: IR 05000220/1990019

Text

AUG.'8 2..19989

Docket No.:

50-220

Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt, III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

New York

13212

Gentlemen:

Subject:

REgUALIFICATION PROGRAM EVALUATION, REPORT

NO. 50-220/90-19

(OL)

During the weeks of July 9 and July 16,

1990,

the

NRC conducted

a requalifi-

cation program evaluation at the Nine Mile Point Nuclear Station, Unit 1.

The

evaluation

was conducted

in accordance

with NUREG-1021, "Operator Licensing

Examiner Standards,"

Revision 5, section

ES-601,

"Administration of NRC Requali-

fication Program Evaluations."

The evaluation

had two purposes:

( 1) to evalu-

ate individual licensed operator

competency,

and (2) to evaluate

the effective-

ness of the licensed operator training program.

One area of the evaluation,

the requirement for administering five common Job Performance

Measures

(JPMs)

was waived.

Niagara

Mohawk requested

a waiver, citing as their basis

the fact

that Revision

6 to the Examiner Standards

has deleted all requirements

for

common JPMs.

In all other areas,

though,

the program evaluation

was conducted

in accordance

with Revision

5.

At the conclusion of the evaluation,

findings

related to the preparation

and administration of the requalification examina-

tions were discussed

with those

members of your staff identified in the

enclosed report.

As a result of the evaluation,

Unit 1's program

has

been rated

as satisfactory.

NRC results indicate that all three

crews which participated

in the examina-

tions performed satisfactorily

on the simulator portion of the examination.

In

addition, all nine senior reactor operators

and all six reactor operators

examined

passed all portions of the examination.

The program weaknesses

(section 2.5 of the enclosed

report) are provided to you for self-assessment

and appropriate

corrective action.

No response

is required.

The enclosed

report also documents

three Unresolved

(UNR) items.

Briefly, item

one concerns

the rotation of the reactor operators

(ROs) between

the three

RO

positions during simulator evaluations.

Item two concerns classifying any

fai lure of control

rods to insert situation

as

an Alert or higher class of

emergency.

The third item concerns

the installation of jumpers to bypass

main

steam isolation valve closures.

Details are given in section

3 of this report.

You are requested

to respond to this letter with proposed resolutions for the

three Unresolved

items within 30 days of receipt of this letter.

9009060092

900322

PDR

ADOCK 05000220

V

PDC

0

r9

)

,P

y:"-'

R 8"~>>

~

S

IIJ wl

Niagara

Mohawk Power Corporation

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

report will be placed in the

NRC Public Document

Room.

The response

requested

by this letter is not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980, Public

Law No.96-511.

Should you have

any questions,

please

contact

Mr.

R. Conte,

Chief

BWR Section,

at (215) 337-5210.

Sincerely,

Original Signoa og.>

ROBERT M. GALLO

Robert

M. Gallo, Chief

Operations

Branch

Division of Reactor Safety

Enclosure:

Requalification

Program Evaluation,

Report

No. 50-220/90-19

(OL)

with Attachments

cc w/encl:

C.

Mangan,

Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

C.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit

1 Station Superintendent

R. Randall, Unit 1 Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President

Nuclear Engineering

and Licensing

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

R. Sylvia, Senior Vice President

J. Firlit, General

Station Superintendent

OFFICIAL RECORD

COPY

NMP1

REQUAL EXAM 0002.0.0

08/20/90

C

E

U

Niagara

Mohawk Power Corporation

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

R. Bellamy,

DRSS

J. Linville, DRP

D. Limroth,

DRP

G. Meyer,

DRP

J. Caldwell,

EDO

R. Martin,

NRR

NRR Project Manager

R. Gallo,

DRS

R. Conte,

DRS

T. Fish,

DRS

DRS Files (5)

DRS: RI

Fish/gb/dmg

08/14/90

ig so

a

08

c~P

OFFICIAL RECORD

COPY

NMP1

REQUAL EXAM - 0003.0.0

08/16/90

V

C