Text
~g REOII pp p
pN
+**++
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 NIAGARA MOHAWK POWER CORPORATION DOCKET NO. 50-410 NINE MILE POINT NUCLEAR STATION UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. i7 License No.
NPF-69 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Niagara Mohawk Power Corporation (the licensee) dated April 10, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license i s amended by changes to the Techni cal Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-69 is hereby amended to read as follows:
~l 9006270
+
50004i0 900m~~
pDR P'DOCK 0 poc p
0
(2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No. 17 are hereby incorporated into this license.
Niagara Mohawk Power Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance to be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Robert A. Capra, Director Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Date of Issuance:
June 19, 1990
~C
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 17 TO FACILITY OPERATING LICENSE NO. NPF-69 DOCKET NO. 50-410 Revise Appendix A as i'o11ows:
Remove Pa es Indices: iii V
Vi Xvl XX111 XXV 1-9 3/4 2-1 3/4 2-2 3/4 2-3 3/4 2-4 3/4 2-5 3/4 2-6 3/4 2-7 3/4 2-8 3/4 2-9 3/4 2<<10 3/4 2-11 3/4 3-62 3/4 3-63 3/4 4-1 8 3/4 2-1 8 3/4 2-2 8 3/4 2-4 8 3/4 2-5 8 3/4 2-6 6-22 6-23 6-24 6-25 6-26 6-27 6-28 Insert Pa es ill V
Vl Xvl XXiii XXV 1-9 3/4 2-1 3/4 2-2 3/4 2-3 3/4 2-4 3/4 2-5 3/4 3-62 3/4 3-63 3/4 4-1 8 3/4 2-1 8 3/4 2-2 8 3/4 2-4 WWW 6-22 6-23 6-24 6-25 6-26 6-27 6-28
t I
(
V INDEX 1.48 VENTILATION EXHAUST TREATMENT SYSTEM.
1.49 VENTING.
1.SO CORE OPERATING LIMITS REPORT.
Table 1.1 Surveillance Frequency Notations.
PAGE
~
~
~
~
~
~
~
1-9
~ t
~
~
~
~
~
~
~
~ \\
1-9 0
~
~
~
~
~
~
~
~
0 1-9 1-10 Table 1.2 Operational Conditions
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~ l-l 1 2.1 SAFETY-LIMITS THERMAL POWER, Low Pressure or Low Flow........................
2-1 THERMAL POWER, High Pressure and High Flow....
~
~
~
~
2 1
Reactor Coolant System Pressure.
Reactor, Vessel Water Level......
2.2 LIMITING SAFETY SYSTEM SETTINGS
~
~
~
2-1 2-1 Reactor Protection System Instrumentation Setpoints............
2-2 Table 2.2.1-1 Reactor Protection System Instrumentation Setpoints.
2-3 2.1 SAFETY LIMITS Introduction........,.....
82-1 THERMAL POWER, Low Pressure or Low Flow........................
B2-1 THERMAL POWER, High Pressure and High Flow.
Bases Table B2.1.2-1 Uncertainties Used in the Determination of the Fuel Cladding Safety Limit.
B2-2 B2-3 Bases Table B2.1.2-2 Nominal Values of Parameters Used in the Statistical Analysis of Fuel Cladding Integrity Safety Limit B2-4 NINE MILE POINT UNIT 2 Amendment No.
17
PAGE REACTIVITY CONTROL SYSTEMS (Continued) 3/4.1.5 STANDBY LIQUID CONTROL SYSTEM.
3/4 1-19 Figure 3.1.5-1 Sodium Pentaborate Tank Volume vs. Concentration Requirements.
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
3/4 1
22 3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE 3/4 2-1 3/4.2.2 AVERAGE POWER RANGE MONITOR SETPOINTS 3/4 2-2 3/4,2.3 MINIMUM CRITICAL POWER RATIO (ODYN OPTION B)..............
3/4 2-3 3/4
~ 2.4 LINEAR HEAT GENERATION RATE.
3/4.3 INSTRUMENTATION 3/4 2-5 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION.................
3/4 3-1 Table 3.3.1-1 Reactor Protection System Instrumentation..........
3/4 3-2 Table 3.3.1-2 Reactor Protection System Response Times............
3/4 3-6 Table 4.3.1.1-1 Reactor Protection System Instrumentation Surveillance Requirements........,........................
3/4 3-7 3/4,3.2 ISOLATION ACTUATION INSTRUMENTATION..............
3/4 3-10 Table 3.3.2-1 Isolation Actuation Instrumentation.................
3/4, 3-12 Table 3.3.2-2 Isolation Actuation Instrumentation Setpoints.......
3/3 Table 3.3.2-3 Isolation System Instrumentation Response Time......
3/4 3-17 3-20 Table 3.3.2-4 Valve Groups and Associated Isolation Signals.......
Table 4.3.2.1-1 Isolation Actuation Instrumentation Surveillance equirements..............................................
R 3/4 3-22 3/4 3-25 3/4.3.3 EMERGENCY CORE COOLING SYSTEM ACTUATION INSTRUMENTATION...
3/4 3-29 Table 3.3.3-1 Emergency Core Cooling System Actuation Instrumentation........
3/4 3-30 Table 3.3.3-2 Emergency Core Cooling System Actuation Instrumentation Setpoints...
3/4 3-35 Table 3.3.3-3 Emergency Core Cooling System Response Times........
3/4 3-39 NINE MILE POINT UNIT 2 Amendment No.
17
(\\
INDEX PAGE INSTRUMENTATION (Continued)
Table 4.3.3.1-1 Emergency Core Cooling System Actuation Instrumentation Surveillance Requirements 3/4.3.4 RECIRCULATION PUMP TRIP ACTUATION INSTRUMENTATION ATWS Recirculation Pump Trip System Instrumentation......
Table 3.3.4.1-1 ATWS Recirculation Pump Trip System Instrumentation.
Table 3:3.4.1-2 ATWS Recirculation Pump Trip System Instrumentation Setpoints Table 4.3.4.1-1 ATWS Recirculation Pump Trip Actuation Instrumentation Surveillance Requirements End-of-Cycle Recirculation, Pump Trip System Instrumentation.
3/4 3-40 3/4 3-45 3/4 3-47 3/4 3-48 3/4 3-49 3/4 3-50'able 3.3.4.2-1 End-of-Cycle Recirculation Pump Trip System Instrumentation...............
3/4 3-52 Table 3.3.4.2-2 End-of-Cycle Recirculation Pump Trip System Setpoints 3/4 3-53 Table 3.3.4 '-3 End-of-Cycle Recirculation Pump Trip System Response Time.................
3/4 3-53 NINE MILE POINT UNIT 2 vi Amendment No.
17
I
'NDEX PAGE 3/4.0 APPLICABILITY 3.4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 SHUTDOHN MARGIN.
3/4.1.2 REACTIVITY ANOMALIES B3/4 0-1 83/4 1-1 B3/4 1-1 3.4.1.3 CONTROL RODS........................
B3/4 1-2 3/4.1.4 CONTROL ROD PROGRAM CONTROLS......
~....................'.'...
B3/4 1-3 3/4.1.5 STANDBY LIQUID CONTROL SYSTEM................
83/4 1-4 3/4.2 POHER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE....
3/4.2.2
.APRM SETPOINTS...
B3/4 2-1 B3/4 2-1 Bases Table B3.2.1-1 Significant Input Parameters to the Loss-of-Coolant Accident Analysis.................
B3/4 3/4.2.3 MINIHUH CRITICAL POHER RATIO...............................
B3/4 2-3 3/4.2.4 LINEAR HEAT GENERATION RATE..........,.....................
B3/4 2-4 3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION.................. B3/4 3-1 3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION........................
B3/4 3-1 3/4.3.3 EMERGENCY CORE COOLING SYSTEM'ACTUATION INSTRUMENTATION.... B3/4 3-2
'/4.3.4 RECIRCULATION PUMP TRIP ACTUATION INSTRUMENTATION.......... B3/4 3-3 3/4.3.5 REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION INSTRUMENTATION..................................
B3/4 3-,4 3/4.3.6 CONTROL ROD BLOCK INSTRUMENTATION.......
B3/4 3-4 NINE MILE POINT UNIT 2 xvi Amendment No.
17
0
+1
~
gO
'INDEX
~ ~
PAGE
- 6. 2 ORGANIZATION Offs i te Unit Staff.
6-1
~
~
~
~
~
~
~
~
6 1
Independent Safety Engineering Group Function.
~
Composition.
Responsibilities..........
Table 6.2.2-1 Minimum Shift Crew Composition..
Records
~
~
~
~
~
~
~
6 3
~
~
~
~
~
~
~
~
6-3 6-3 6-6 6-7 Assistant Station Shift Supervisor/Shift Technical Advisor.........
6-7
- 6. 3 FACILITY STAFF UALIF ICATIONS 6.4 TRAINING......................
6-7 6-7
- 6. 5 REVIEW AND AUDIT Site Operations Review Committee Function.
Composition.
Alternates.
Meeting Frequency........
Quorum.
Respons ibi 1 i ties Duties..........,....
6-8 6-8
.. 6-8 6-8 6-8
~
~
~
~
~
~
~
~
~
~
6 8 6-9 NINE MILE POINT UNIT 2 xxiii Amendment No; 17
t
)
INDF.X REPORTING RE UIREMENTS (Continued)
Annual Reports........................
~........
Monthly Operating Reports..
PAGE 6-18 6-19 Annual Radiological Environmental Operating Report.............
6-19 Semiannual Radioactive Effluent Release Report..
Core Operating Limits Report
. Special Reports.
6; 10 RECORD RETENTION.
6.11 RADIATION PROTECTION PROGRAM.
~ ~ ~ ~
~
~
~
~
~
~
~
6 20 6-22 6-23
.6-23 6-24 12 HIGH RADIATION AREA.............., '......................
6-25 6.13 PROCESS CONTROL PROGRAM.
~
~
~
~
~
~
~
~
~
~
6 26 6.14 OFFSITE DOSE CALCULATION MANUAL~...........................
6-26
'.15 MAJOR CHANGES TO LI UID GASEOUS AND SOLID RADWASTE TREATMENT SYSTEMS
~
~
~
~
~
~
~
~
~
~
o 6 27 NINE MILE POINT UNIT 2 xxv Amendment No. i7
r
t I
UNIDENTIFIED LEAKAGE 1.46 UNIDENTIFIED LEAKAGE shall be,all leakage which is not IDENTIFIED LEAKAGE.
UNRESTRICTED AREA 1.47 An UNRESTRICTED AREA shall be any area at or beyond the SITE
- BOUNDARY, access to which is not controlled by the Niagara'Mohawk Power Corporation or the New York State Power Authority for purposes of protection of individuals from exposure to radiation and radioactive materials, or any area within the SITE BOUNDARY used for residential quarters or for industrial, commercial institutional, and/or recreational purposes.
VENTILATION EXHAUST TREATMENT SYSTEM 1.48 A VENTILATION EXHAUST TREATMENT SYSTEM shall be any system designed and installed to reduce gaseous radioiodine or radioactive material in particulate form in effluents by passing ventilation or vent exhaust gases through charcoal absorbers and/or HEPA filters for the purpose of removing iodines or particulates from the gaseous exhaust stream prior to the release to the environment (such a system is not considered to have any effect on noble gas effluents):
Engineered safety features (ESF) atmospheric cleanup systems are not considered to be VENTILATION EXHAUST TREATMENT SYSTEM components.
VENTING 1.49 VENTING shall be the controlled process of discharging air or gas from a confinement to maintain temperature,
- pressure, concentration, or other operating condition, in such a manner that replacement air or gas is not provided or required during VENTING.
- Vent, used in system
- names, does not imply a VENTING process.
CORE OPERATING LIMITS REPORT 1.50 The CORE OPERATING LIMITS REPORT is the unit-specific document that provides CORE OPERATING LIMITS for the current operating reload cycle.
These cycle-specific CORE OPERATING LIMITS shall be determined for each reload cycle in accordance with Specification 6.9.1.9.
Plant operation within these Operating Limits is addressed in individual specifications.
NINE MILE POINT UNIT 2 1-9 Amendment No.
37
f l
4
3/4.2 PONER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE 3.2.1 All AVERAGE PLANAR LINEAR HEAT GENERATION RATES (APLHGRs) for each type of fuel as a function of AVERAGE PLANAR EXPOSURE shall not exceed the limits specified in the CORE OPERATING LIMITS REPORT.
-The APLHGR Limits shall be reduced as specified in the CORE OPERATING LIMITS REPORT when in single recirculation loop operation.
APPLICABILITY:
OPERATIONAL CONDITION 1, when THERMAL PONER is greater than or equal to 25%%d of RATED THERMAL PONER.
ACTION'ith an APLHGR exceeding the limits specified in the CORE OPERATING LIMITS REPORT, initiate corrective action within 15 minutes and restore APLHGR to within the required limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL PONER to less than 25/ of RATED THERMA POHER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4.2.1 All APLHGRs shall be verified to be equal to or less than the limits specified in the CORE OPERATING LIMITS REPORT:
a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
Hithin 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL PONER increase of at least 151. of RATED THERMAL PONER, and c.
Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for APLHGR.
d.
The provisions of Specification 4.0.4 are not applicable.
NINE MILE POINT UNIT 2 3/4 2-1 Amendment No.
17
0
,'OWER DISTRIBUTION LIMITS 3/4.2.2 AVERAGE POWER RANGE MONITOR SETPOINTS 3.2.2 The Average Power Range Monitor (APRM) flow-biased simulated thermal power-upscale scram trip setpoint (S) and flow-biased neutron flux-upscale control rod block trip setpoint (SRB) shall be established according to the relationships specified in the CORE OPERATING LIMITS REPORT.
APPLICABILITY:
OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER.
ACTION'ith the APRM flow-biased simulated thermal power-upscale scram trip setpoint
. and/or the flow-biased neutron flux-upscale control rod block trip setpoint less conservative than the value shown in the Allowable Value column for S or SRB.
as above determined, initiate corrective action within 15 minutes and adjust S and/or SRB to be consistent with the Trip Setpoint value* within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
4.2.2 The FRACTION OF RATED THERMAL POWER (FRTP) and the CORE MAXIMUM FRACTION OF, LIMITING POWER DENSITY (CMFLPD) shall be determined, the-value of T** calculated, and the most recent actual APRM flow-biased simulated thermal power-upscale scram and flow-biased neutron flux-upscale control rod block trip setpoints verified to be within the above limits or adjusted, as required:
a.
- At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL POWER increase of at least 15% of RATED THERMAL POWER, and c.
Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with CMFLPD greater than or equal to FRTP.
d.
The provisions of Specification 4.0.4 are not applicable.
With CMFLPD greater than the FRTP rather than adjusting the APRM setpoints, the APRM gain may be adjusted so that APRM readings are greater than or equal to 100% times CMFLPD provided that the adjusted APRM reading does not exceed 100% of RATED THERMAL POWER and a notice of adjustment is posted on the reactor control panel.
Definition of T is specified in the CORE OPERATING LIMITS REPORT.
NINE MILE POINT UNIT 2 3/4 2-2 Amendment No.
1
I
POWER DISTRIBUTION Llh TS I
3/4.2.3 MINIMUM CRITICAL POWER RATIO (ODYN OPTION B) 3.2.3 The MINIMUM CRITICAL POWER RATIO (MCPR) shall be equal to or greater than the HCPR limit specified in the CORE OPERATING LIMITS REPORT with:
v - << ave -
~ B>
where:
A rA 0.86 seconds, time limit to control rod average scram insertion notch 39 per Specification 3.1.3.3,
>i T B x+y Nl n
E i
1 Ni (z],
'r ave Ni Nl APPLICABILITY:
equal to 25'L of with x, y and z specified in the CORE OPERATING LIMITS REPORT n
E Ni~ i i=1n, Z
i=1 number of surveillance tests performed in cycle number of active control rods measured in the ith surveillance test, average scram time to notch 39 of all rods measured in the i th surveillance test total number of active rods measured in Specification 4.1.3.2.a.
OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or RATED THERMAL POWER.
NINE MILE POINT UNIT 2 3/4 2-3 Amendment No. 17
.'OWeR DISTRIBUTION LIMITS 3.2.3 (Continued)
ACTION:
With the end-of-cycle recirculation pump trip system inoperable per Specification 3.3.4.2, operation may continue and the provisions of Specification 3.0.4 are not applicable provided that, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, MCPR is determined to be equal to or greater than the MCPR limit specified in the CORE OPERATING LIMITS REPORT.
b.
With the main turbine bypass system inoperable per Specification 3.7.7, operation may continue and the provisions of Specification 3.0 '
are not applicable provided that, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, MCPR is determined to be equal to or greater than the MCPR limit specified in the CORE OPERATING LIMITS REPORT.
c.
With MCPR less than the applicable MCPR limit specified in the CORE OPERATING LIMITS REPORT initiate corrective action within 15 minutes to restore MCPR within the required limit.
Restore MCPR to within the required limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, if necessary, by reducing THERMAL POWER to the level required.
4.2.3 MCPR shall be determined to be equal to or greater than the applicable MCPR limit specified in the CORE OPERATING LIMITS REPORT with:
a 0
b.
C.
v = 1.0 prior to performance of the initial scram time measurements for the cycle in accordance with Specification 4.1.3.2, l.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, 2.
Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL POWER increase of at least 15'L of RATED THERMAL POWER, and 3.
Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for MCPR, or T as defined in Specification 3.2.3 used to determine the limit within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the conclusion of each scram time surveillance test required by Specification 4.1.3.2.
l.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, 2.
Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL POWER increase of at least 15% of RATED THERMAL POWER, and 3.
Initially and'at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for MCPR.
The provisions of Specification 4.0.4 are not applicable.
NINE MILE POINT UNIT 2 3/4 2-4 Amendment No.
17
4
POWER DISTRIBUTION LIMITS 3/4.2.4 LINEAR HEAT GENERATION RATE 3.2.4 The LINEAR HEAT GENERATION RATE (LHGR) shall not exceed the limit specified in the CORE OPERATING LIMITS REPORT.
APPLICABILITY:
OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER.
ACTION:
With the LHGR of any fuel rod exceeding the limit, initiate corrective action within 15 minutes and restore the LHGR to within the limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25K of RATED THERMAL POWER within the next 4
hours.
4.2.4 LHGRs shall be determined to be equal to or less than the limit:
a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
C.
Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL POWER increase of at= least 15/. of RATED THERMAL POWER, and Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating on a LIMITING CONTROL ROD PATTERN for LHGR.
d.
The provisions of Specification 4.0.4 are not applicable.
NINE MILE POINT UNIT 2 hl 3/4 2-5 Amendment No.
17
~0
o TRIP I
1, 2.
FUNCTION Rod Block Monitor a.
Upscale b.
Inoperative c.
Downscale APRM TABLE 3.3.6-2 CONTROL ROD BLOCK INSTRUMENTATION SETPOINTS TRIP SETPOINT NA
>5% of RATED THERMAL POWER ALLOWABLE VALUE NA
>3% of RATED THERMAL POWER CA 3
4.
O 0
Source Ran e Monitor a.
Detector Not Full In b.
Upscale c.
Inoperative d.
Downscale Intermediate Ran e Monitors Detector not full in Upscale Inoperative Downscale Scram Dischar e Volume a.
b.
C.
d.
Water Level High, Float Switch a.
Flow-Biased Neutron Flux-Upscale b.
Inoperative c.
Downscale d.
Neutron Flux Upscale, Startup NA
>4% of RATED THERMAL POWER
<12% of RATED THERMAL POWER NA
<1 x
105 cps NA
>3 cps**
NA
<108/125 divisions of full scale NA
>5/125 divisions of full scale
'16.5 in.
NA
>3'/ of RATED THERMAL POWER
<14% of RATED THERMAL POWER NA
<1.6 x
105 cps NA
>1.8 cps*'A
<110/125 divisions of full scale NA
>3/125 divisions of full scale
<39.75 in.
l
TABLE 3.3. 6-2 (Continued)
CONTROL ROD BLOCK INSTRUMENTATION SETPOINTS m
TRIP FUNCTION TRIP SETPOINT 6.
Reactor Coolant S stem Recirculation Flow a;
Upscale
<108% rated flow
. b.
Inoperative NA c.
Comparator
<101. flow deviation 7.
Reactor Mode Switch ALLOHABLE VALUE
<lll%%d rated flow NA
<11K flow deviation a.
Shutdown Mode b.
Refuel Mode NA NA NA NA Specified in the CORE OPERATING LIMITS REPORT For initial loading and startup the count rate may be less than 3 cps if the following conditions are met:
the signal to noise ratio is greater than or equal to 20, and the signal is greater than 0.7 cps.
3/4.4 REACTOR COOLANT SYSTEM 3/4. 4. 1 RECIRCULATION SYSTEM RECIRCULATION LOOPS LIMITING CONDITIONS FOR OPERATION 3.4. 1. 1 Two reactor coolant system recirculation loops shall be in operation with:
a.
Total core flow greater than or equal to 45X of rated core flow, or b.
THERMAL POWER within the unrestricted zone of Figure 3.4.1. 1-1.
APPLICABILITY:
OPERATIONAL CONDITIONS 1~ and 2~.
ACTION:
a.
With one reactor coolant system recirculation loop not in operation:
1.
Within four hours:
a)
Place the recirculation flow control system in the Loop Manual (Position Control) mode, and b)
Reduce THERMAL POWER to < 70K of RATED THERMAL POWER,
- and, c)
Increase the MINIMUM CRITICAL POWER RATIO (MCPR) Safety Limit by 0.01 to 1.08 per Specification 2.1.2,
- and, d)
Reduce the Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) limit per Specification 3.2.1,
- and, e)
Reduce the Average Power Range Monitor (APRM) Scram and Rod Block and Rod Block Monitor Trip Setpoints and Allowable Values to those applicable for single recirculation loop operation per Specifications
- 2. 2. 1, 3. 2. 2 and 3. 3. 6.
f)
Reduce the volumetric drive flow rate of the operating recirculation loop to < 41,800"" gpm.
~ See Special Test Exception 3.10. 4.
"" This value represents the volumetric recirculation loop drive flow which produces 100K core flow at lOOX THERMAL POWER.
NINE MILE POINT - UNIT 2 3/4 4-1 Amendment No.
17
3
3/4.2 POHER DISTRIBUTION LIMITS The specifications of this'se'ction assure that the peak cladding temperature following the postulated design basis loss-of-coolant accident wi 11 not exceed the 2200'F limit specified in 10 CFR 50.46.
3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE The peak cladding temperature (PCT) following a postulated loss-of-coolant accident is primarily a function of the average heat generation rate of all the rods of a fuel assembly at any axial location and is dependent only secondarily on the rod-to-rod power distribution within an assembly.
The peak clad temperature is calculated assuming an LHGR for the highest powered rod which is equal to or less than the design LHGR corrected for densification.
This LHGR times 1.02 is used in the heatup code along with the
, exposure-dependent steady-state gap conductance and rod-to-rod local peaking factor.
The limiting value for APLHGR is specified in the CORE OPERATING LIMITS REPORT for two-recirculation-loop operation, The calculational procedure used. to establish the APLHGR specified in the CORE OPERATING LIMITS REPORT is based on a loss-of-coolant accident analysis.
The analysis was performed using General Electric (GE) calculational models -which are consistent with the requirements of Appendix K to 10 CFR 50.
A complete discussion of each code employed: in the analysis is presented in Reference l.
A list of the significant plant input parameters to the loss-of-coolant accident analysis is presented in Bases Table B3.2.1-1.
For plant operations with single recirculation loop the MAPLHGR limits are specified in the CORE OPERATING LIMITS REPORT.
The constant factor is derived from LOCA analyses initiated from single loop operation to account for earlier boiling transition at the limiting fuel node compared to the standard LOCA evaluations.
3/4.2.2 APRM SETPOINTS The fuel cladding integrity Safety Limits of Specification 2.1 were based on a
power distribution which would yield the design LHGR at RATED THERMAL PONER.
The flow-biased simulated thermal power-upscale scram setting and flow-biased neutron flux upscale control rod block functions of the APRM instruments must be adjusted to ensure that the MCPR does not become less than the fuel cladding integrity safety limit or that greater than or equal to 1'L plastic strain does not occur in the degraded situation.
The scram setpoint and rod block settings are adjusted in accordance with the formula in this specification when the combination of THERMAL POHER and CMFLPD indicates a
higher peaked power distribution to ensure that an LHGR transient would not be increased in the degraded condition.
NINE MILE POINT UNIT 2 B 3/4 2-1 Amendment No.
17
POWER DISTRIBUTION LIMITS 3/4.2.3 MINIMUM CRITICAL POWER RATI'0 The required operating limit MCPRs at steady-state operating conditions as specified in Specification 3.2.3 are derived from the established fuel cladding integrity Safety Limit MCPR, and an analysis of abnormal operational transients.
For any abnormal operating transient analysis evaluation with the initial condition of the reactor being at the steady-state operating limit, it is required that the resulting MCPR does not decrease below the Safety Limit MCPR at any time during the transient, assuming instrument trip setting given in Specification 2.2.
To assure that the fuel cladding integrity Safety Limit is not exceeded during any anticipated abnormal operational transient, the most limiting transients
. have been analyzed to determine which result in the largest reduction in CRITICAL POWER RATIO (CPR).
The type of transients evaluated were loss of flow, increase'n pressure and power, positive reactivity insertion, and coolant temperature decrease.
The evaluation of a given transient begins with the system initial parameters shown in FSAR Table 15.0.3 that are input to a GE-core dynamic behavior transient computer program.
The code used to evaluate pressurization events is described in NEDO-24154 (Reference
- 3) and the program used in non-pressurization events is described in NED0-10802,(Reference 2).
The outputs of this program along with the initial MCPR form the input for further analyses of the thermally limiting bundle with the single channel transient thermal hydraulic TASC code described in NEDE-25149 (Reference 4).
The principal result of this evaluation is the reduction in MCPR caused by the transient.
The purpose of the Kf factor specified in the CORE OPERATING LIMITS REPORT is to define operating limits at other than rated core flow conditions.
At less than 100/ of rated flow, the required MCPR is the product of the MCPR and the Kf factor.
The Kf factors as'sure that the Safety Limit'MCPR will not be violated.
The Kf factors are calculated as described in Reference 5.
't THERMAL POWER levels less than or equal to 25K of RATED THERMAL POWER, the reactor will be operating at minimum recirculation pump speed and the moderator void content will be very small.
For all designated control rod patterns which may be employed at this point, operating plant experience indicates that the resulting MCPR value is in excess of requirements by a considerable margin.
During in.itial startup testing of the plant, an MCPR evaluation will be made at 25'L of RATED THERMAL POWER level with minimum recirculation pump speed.
The MCPR margin will thus be demonstrated, such that future MCPR evaluation below this power level will be shown to be unnecessary.
The daily requirement for calculating MCPR when THERMAL POWER is greater than or equal to 25K of RATED THERMAL POWER is sufficient since power distribution shifts are very slow when there have not been significant power or control rod changes.
The requirement for calculating MCPR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the completion of a THERMAL POWER increase of at least 15'/ of RATED THERMAL POWER ensures thermal limits are met after power distribution shifts, NINE MILE POINT UNIT 2 B 3/4 2-2 Amendment No.
17
~ l, p
POWER DISTRIBUTION LIMITS 3/4.2.3 MINIMUM CRITICAL POWER RATIO 3/4 2.3 (Continued)
.while still allotting time for the power distribution to stabilize.
The requirement for calculating MCPR after initially determining that a LIMITING CONTROL ROD PATTERN exists ensures MCPR will be known following a change in THERMAL POWER or power shape, and therefore avoid operation while exceeding a
thermal limit.
3/4.2.4 LINEAR HEAT GENERATION RATE This specification assures that the linear heat generation rate (LHGR) in any rod is less than the design linear heat generation rate even if fuel pellet densification is postulated.
The daily requirement for calculating LHGR when THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER is sufficient, since power distribution shifts are very slow when there have not been significant power or control rod changes.
The requirement to calculate LHGR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the completion of a THERMAL POWER increase of at least 15% of RATED THERMAL POWER ensures thermal limits are met after power distribution shifts while still allotting time for the power distribution to stabilize.
The requirement for calculating LHGR after initially determining a
LIMITING CONTROL ROD PATTERN exists ensures that LHGR will be known following a change in THERMAL POWER or power shape that could place operation exceeding a thermal limit.
References 1.
General Electric Company Analytical Model for Loss-of-Coolant Analysis in Accordance with 10 CFR 50, Appendix K, NEDE-20566, latest approved revision.
2.
R.
B. Linford, Analytical Methods of Plant Transient Evaluations for the GE BWR, NED0-10802, latest approved revision.
3.
Qualification of the One Dimensional Core Transient Model for Boiling Water Reactors, NED0-24154, latest approved revision.
4.
TASC 01-A Computer Program for the Transient Analysis of a Single Channel,. Technical Description, NEDE-25149, latest approved revision.
5.
General Electric Standard Application for Reactor
- Fuel, NEDE-24011-P-A-9-US latest approved revision.
NINE MILE POINT UNIT 2 B 3/4 2-4 Amendment No.
17
t~
1 SEMIANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT 6.9.1.8 (Continued)
The Semiannual Radioactive Effluent Release Reports shall include any changes made during the reporting period to the PROCESS CONTROL PROGRAM (PCP) and to the OFFSITE DOSE CALCULATION MANUAL (ODCM), pursuant to Specifications 6.13 and 6.14, respectively, as well as any major change to liquid, gaseous, or solid radwaste treatment systems pursuant to Specification 6.15.
It shall also include a listing of new locations for dose calculations and/or environmental monitoring identified by the. land use census pursuant to Specification 3.12.2.
The Semiannual Radioactive Effluent Release Reports shall also include the-following:
an explanation of why the inoperability of liquid or gaseous effluent monitoring instrumentation was not corrected within the time specified in Specification 3.3.7.9 or 3.3.7.10, respectively, and a
description of the events leading to liquid holdup tanks exceeding the limits of Specification 3.11.1.4.
CORE OPERATING LIMITS REPORT 6.9.1.9 a.
Core operating limits shall be established prior to each reload cycle, or
, prior to any remaining portion of a reload cycle for the following:
1)
The AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) for Specification 3.2.1.
2)
The Average Power Range Monitor (APRM) flow-biased simulated thermal power-upscale scram trip setpoint and flow-biased neutron flux-upscale control rod block trip setpoint for Specification 3.2.2.
3)
The Kf core flow adjustment factor for Specification 3.2.3.
4)
The MINIMUM CRITICAL POHER RATIO (MCPR) for Specification 3.2.3.
5)
The LINEAR HEAT GENERATION RATE (LHGR) for Specification 3.2.4.
6)
Control Rod Block Instrumentation Setpoints for the rod block monitor upscale and APRM flow biased neutron flux upscale trip and allowable values for Specification 3.3.6.-
and shall be documented in the CORE OPERATING LIMITS REPORT.
b.
The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC; specifically those described in the following document.
1)
General Electric Company Analytical Model for Loss-of-Coolant Analysis in Accordance with 10 CFR 50, Appendix K, NEDE-20566 latest approved revision.
NINE MILE POINT UNIT 2 6-22 Amendment No.
17
l
CORE OPERATING LIHITS REPORT 6.9.1.9 (Continued)
C.
2)
General Electric Standard Application for Reactor
- Fuel, NEDE-24011-P-A-9-US latest approved revision.
The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic
- limits, ECCS limits, nuclear limits such as shutdown margin, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d.
The CORE OPERATING LIHITS REPORT, including any mid-cycle revisions or supplements shall be provided, upon issuance for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspectors SPECIAL REPORTS 6.9.2
~
Special reports shall be submitted in accordance with 10 CFR 50.4 within the time period specified for each report.
6.10 RECORD RETENTION 6.10.1 In addition to the applicable record retention requirements of Title 10, of the Code of Federal Regulations (10 CFR),
the following records-shall be retained for at least the minimum period indicated.
6.10.1.1 The following records shall be retained for"at least 5 years:
a.
Records and logs of unit operation covering time interval at each power level b.
Records and logs of principal maintenance activi ties, inspections,
- repair, and replacement of principal items of equipment related to nuclear safety c.
All REPORTABLE EVENTS submitted to the Commission d.
Records of surveillance activities, inspections, and calibrations required'y these Technical Specifications e.
Records of changes made to the procedures required by Specification 6.8.1 f.
Records of radioactive shipments g.
Records of sealed source and fission detector leak tests and results h.
Records of annual physical inventory of all sealed source material of record NINE HILE POINT UNIT 2 6-23 Amendment No. 17
)a
~ '
I RECORD RETENTION 6.10.1.2 The following records sha,ll be retained for the duration of the unit Operating License:
a.
b.
c
~
Records and drawing changes reflecting unit design modifications made to systems and equipment described in the Final Safety Analysis Report Records of new and irradiated fuel inventory, fuel transfers, and assembly burnup histories Records of radiation exposure for all individuals entering radiation control areas d.
Records of gaseous and liquid radioactive material released to the environs e;
Records of transient or operational cycles for those unit components identified in Table 5.7.1-1 g.
Records of reactor tests and experiments Records of training and qualification for current members of the unit staff h.
k.
Records of inservice inspections performed pursuant to these Technical Specifications Records of quality assurance activities required by the Operational Quality Assurance
- Manual, and not listed in Specification 6.10.1.1 Records of reviews performed for changes made to procedures or equipment or reviews of tests and experiments pursuant to 10 CFR 50.59 Records of meetings of the SORC and the SRAB Records of the service lives of all snubbers',
including the date at which the service life commences and associated installation and maintenance records m.
n.
Records of analyses required by the Radiological Environmental Monitoring, Program.that would permit evaluation of the accuracy of the analysis at a
later date, This should include procedures effective at specified times and QA records showing that these procedures were followed Records of unit radiation and contamination surveys 6.11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR 20 and shall be approved, maintained, and adhered to for all operations involving personnel radiation exposure.
NINE MILE POINT UNIT 2 6-24 Amendment No.
17
I tk
I
~ ~
6.12 HIGH RADIATION AREA 6.12.1 In lieu of the "control device" or "alarm signal" required by 10 CFR 20.203 (c)(2),
each high radiation area in which the intensity of radiation is greater than 100 mrem/hr'ut less than 1000 mrem/hr* shall be barricaded and conspicuously posted as a high radiation area, and entrance thereto shall be controlled by requiring issuance of a Radiation Work Permit (RWP)**.
Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
a
~
A radiation monitoring device which continuously indicates the radiation dose rate in the area b.
A radiation monitoring device which continuously integrates the radiation dose rate in the area and alarms when a preset integrated dose is received.
Entry into such areas with this monitoring device may be made after the dose rate levels in the area have been established and personnel have been made knowledgeable of them c.
An individual qualified in radiation protection (i.e., qualified in radiation protection procedures) with a radiation dose rate monitoring device who is responsible for providing positive control over the activities within.the area and shall perform.periodic radiation surveillance at the frequency specified by the Radiation Protection Supervisor or the Radiation Protection Supervisor's designee in the RWP 6.12.2 In addition to the requirements of Specification 6.12.1, areas accessible to personnel with radiation levels such that a major portion of the body could receive in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a dose greater than 1000 mrem* shall be provided with locked doors to prevent unauthorized
- entry, and the keyed access shall be maintained under the administrative control of the Station Shift Supervisor or the designee on duty and/or the Radiation Protection Supervisor or designee.
Doors shall remain locked except during periods of access by personnel under an approved RWP which shall specify the dose rate levels in the'mmediate work area and the maximum allowable stay time for individuals in that area.
For individual areas access.ible to personn'el with such radiation levels that a
major portion of the body could receive in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a dose in excess of 1000 mrem* that are located within large areas, such as the drywell, where no enclosure exists that can be locked, and no enclosure can be reasonably constructed around the individual areas, then that area shall be roped off,
- Measurements made at 18 inches from the source of radioactivity.
- **Health physics personnel or personnel escorted by health physics personnel shall be exempt from the RWP issuance requirement during the performance of their assigned radiation protection duties, provided they are otherwise following plant radiation protection procedures for entry into high radiation areas.
NINE MILE POINT UNIT 2 6-25 Amendment No.
17
e I
I t
V
@AT HIGH RADIATION AREA 6.12.2 (Continued) conspicuously
- posted, and a flashing light shall be activated as a warning device.
In lieu of the stay time specification of the RWP, continuous surveillance, direct or remote (such as use of closed circuit TV cameras>,
may be made by personnel qualified in radiation protection procedures to provide positive exposure control over the activities within the area.
6'3 PROCESS CONTROL PROGRAM 6.13.1 The PROCESS CONTROL PROGRAM (PCP) shall be approved by the Commission before implementation.
6.13.2 Licensee-initiated changes to the PCP:
a 4
Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change(s) was made.
This submittal shall contain:
1.
Sufficiently detailed information to totally support the rationale for the change without benefit of additional or supplemental information; 2.
A determination that the change did not reduce the overall conformance of the solidified waste product to existing criteria for solid wastes; and 3.
Documentation of the fact that the change has been reviewed and found acceptable by the SORC.
b.
Shall become effective upon review and acceptance by the SORC.
6.14 OFFSITE DOSE CALCULATION MANUAL 6.14.1 The OFFSITE DOSE CALCULATION MANUAL (ODCM) shall be approved by the Commission before implementation.
6.14.2 Licensee-initiated changes to the ODCM:
a.
Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change(s) was made effective.
This submittal shall contain:
1.
Sufficiently detailed information to totally support the rationale for the change without benefit of additional or supplemental information.
Information submitted should consist of a package of those pages of the ODCM to be changed; each page should be numbered,
- dated, and marked with the revision number; appropriate analyses or evaluations justifying the change(s) should be included; NINE MILE POINT UNIT 2 6-26 Amendment No.
17
\\ ~
~
~O J
OFFSITE DOSE CALCULATION MANUAL 6.14 '
(Continued) 2.
A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint determinations; and 3.
Documentation of the fact that the SORC has reviewed the change and found it acceptable.
b.
Shall become effective upon review and acceptance by the SORC.
6.15 MAJOR CHANGES TO LI UID GASEOUS AND SOLID RADNASTE TREATMENT SYSTEMS*
6.15.1 Licensee-initiated major changes to the radwaste treatment systems (liquid, gaseous, and solid):
a; Shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the evaluation was reviewed by the SORC.
The discussion of each change shall contain:
l.
A summary of the eval,uation that led to the determination that the change could be made,'in accordance with 10 CFR 50.59.
2.
Sufficient detailed information to totally support the reason for the change without benefit of additional or supplemental information; 3.
A detailed description of the equipment, components, and processes involved and the interfaces with other plant systems; 4.
An evaluation of the change, which shows the predicted releases of radioactive materials in liquid and gaseous effluents and/or quantity of solid waste that differ from those previously predicted in the license application and amendments thereto; 5.
An evaluation of the change, which shows the expected maximum exposures to a MEMBER OF THE PUBLIC in the UNRESTRICTED AREA and to the general population that differ from those pr'eviously estimated in the license, application and amendments. thereto; 6.
A comparison of the predicted releases of radioactive materials, in liqu.id and gaseous effluents and in solid waste, to the actual releases for the period that precedes the time when the change is to be made; 7.
An estimate of the exposure to plant operating personnel as a result of the change; and
- Licensees may choose to submit the information called for in this Specification as part of the annual FSAR update.
NINE MILE POINT UNIT 2 6-27 Amendment No.
17
I I
t I ~ '
HARBOR CHANGES TO LI UID GASEOUS AND SOLID RADHASTE TREATHENT SYSTEHS 6.15.l.a (Continued) 8.
Documentation of the fact that the change was reviewed and found acceptable by the SORC.
b.
Shall become effective upon review and acceptance by the SORC.
NINE HILE POINT UNIT 2 6-28 Amendment No.