Forwards Readiness Assessment Team Insp Rept 50-220/90-80 on 900430-0511
ML17056A884
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/01/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Burkhardt L
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17056A885 List:
References
NUDOCS 9006140211
Download: ML17056A884 (6)


See also: IR 05000220/1990080

Text

Docket

No

~ 50-220

~ Niagara

Mohawk Power Corporation

ATTN:

Mr. Lawrence Burkhardt III

Executive Vice President

Nuclear Operations

301 Plainfield Road

Syracuse,

-New York

13212

<1 JUN >SSP

Gentlemen:

Subject:

NRC Region I Inspection

Report

No. 50-220/90-80,

Readiness

Assessment

Team Inspection

The

NRC staff conducted

a readiness

assessment

team

inspection

(RATI) at Nine

Mile Point Unit

1 in Scriba,

New York, April 30 through

May ll, 1990.

The pur-

pose of this. inspection

was to evaluate

plant readiness

for restart

based

upon

an

assessment

of the extent to which the underlying root causes

(URCs) of pre-

viously identified

management

effectiveness

issues

have

been

resolved.

Per-

formance-based

evaluations

of

plant

activities

were

performed

during

the

inspection

in order to determine

the

effectiveness

of

implemented

corrective

actions'verall,

the

team

found the material

condition of the plant to

be acceptable

and the plant organization

capable of managing activities associated

with plant

startup

and

operation.

The

team

concluded

that corrective

actions

taken

by

Niagara

Mohawk have effected appropriate

changes

in the control

and performance

of plant activities,

and

in the

analysis

and

assessment

of plant

events

to

resolve the

URCs.

The team also concluded

from the observation

of plant activ-

ities performed

by Niagara

Mohawk during the inspection that the implementation

of these

changes

has

been sufficiently effective to support

the restart of the

unit.

We have

noted

in this report your commitment to review instrument drawings

and

to walk down instrumentation

(other

than

local

indication

gauges)

on safety-

related

systems

to

ensure

that

the

instrument

root

valves

are

properly

positioned prior to restart.

Please

inform us if your understanding

of this

commitment differs from that discussed

in this report.

We appreciate

your cooperation.

Sincerely,

%v@QQJ q)g

OFFICIAL RECORD

.COPY

William F.

Kane, Director

Division of Reactor Projects

9 MILE RATI - 0001.0.0

06/01/90

Ql'

I

'I

0

.Niagara

Mohawk Power Corporation

~> ~UN 1SSg

Enclosure:

NRC Region I Inspection

Report"No.

50-220/90-80

cc w/encl:

C.

Mangan,

Senior Vice President

W. Hansen,

Manager,

Corporate Quality Assurance

M. Colomb, Unit 2 Superintendent,

Operations

'.

Beckham,

Manager,

Nuclear Quality Assurance

Operations

R. Abbott, Unit 2 Station Superintendent

J. Perry,

Vice President,

Quality Assurance

K. Dahlberg, Unit I Station Superintendent

R. Randall, Unit I Superintendent,

Operations

J. Willis, General

Station Superintendent

C. Terry, Vice President,

Nuclear Engineering

and Licensing

M. Peifer,

Manager,

Nuclear Services

C. Stuart,

Manager,

Nuclear Projects

J.

Warden,

New York Consumer Protection

Branch

T. Conner, Jr.,

Esquire

G. Wilson, Senior Attorney

J.

Keib, Esquire

.

Director,

Power Division, Department of Public Service,

State of New York

State of New York, Department of Law

Public Document

Room

(PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

State of New York,

SLO Designee

bcc w/encl:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

T. Martin,

RA

R. Burnett,

DRA

'W. Hodges,

DRS

W. Kane,

DRP

M. Knapp,

DRSS

J. Wiggins,

DRP

J. Linville, DRP

D. Vito,

DRP

G. Meyer,

DRP

'. Abraham,

PAO (2)

M. Taylor,

SLO

R. Bellamy,

DRSS

J. Caldwell,

NRR

R. Martin,

NRR

OFFICIAL RECORD

COPY

9 MILE RATI - 0002.0.0

05/30/90

e

0

0'

Niagara

Mohawk Power Corporation

~~ JUN 78gP

~/~~ i/e~

RI: DRP

GMeyer/meed

5/$ 1 /90

,ii

R

(DRP

JLinvi 1 1 e

4'K+ae

5/I"/90

5/ ~/90

OFFICIAL RECORD

COPY 9 MILE RATI 0003.0.0

05/30/90

5