Text
Docket
No
~ 50-220
~ Niagara
Mohawk Power Corporation
ATTN:
Mr. Lawrence Burkhardt III
Executive Vice President
Nuclear Operations
301 Plainfield Road
Syracuse,
-New York
13212
<1 JUN >SSP
Gentlemen:
Subject:
NRC Region I Inspection
Report
No. 50-220/90-80,
Readiness
Assessment
Team Inspection
The
NRC staff conducted
a readiness
assessment
team
inspection
(RATI) at Nine
Mile Point Unit
1 in Scriba,
New York, April 30 through
May ll, 1990.
The pur-
pose of this. inspection
was to evaluate
plant readiness
for restart
based
upon
an
assessment
of the extent to which the underlying root causes
(URCs) of pre-
viously identified
management
effectiveness
issues
have
been
resolved.
Per-
formance-based
evaluations
of
plant
activities
were
performed
during
the
inspection
in order to determine
the
effectiveness
of
implemented
corrective
actions'verall,
the
team
found the material
condition of the plant to
be acceptable
and the plant organization
capable of managing activities associated
with plant
startup
and
operation.
The
team
concluded
that corrective
actions
taken
by
Niagara
Mohawk have effected appropriate
changes
in the control
and performance
of plant activities,
and
in the
analysis
and
assessment
of plant
events
to
resolve the
URCs.
The team also concluded
from the observation
of plant activ-
ities performed
by Niagara
Mohawk during the inspection that the implementation
of these
changes
has
been sufficiently effective to support
the restart of the
unit.
We have
noted
in this report your commitment to review instrument drawings
and
to walk down instrumentation
(other
than
local
indication
on safety-
related
systems
to
ensure
that
the
instrument
root
valves
are
properly
positioned prior to restart.
Please
inform us if your understanding
of this
commitment differs from that discussed
in this report.
We appreciate
your cooperation.
Sincerely,
%v@QQJ q)g
OFFICIAL RECORD
.COPY
William F.
Kane, Director
Division of Reactor Projects
9 MILE RATI - 0001.0.0
06/01/90
Ql'
I
'I
0
.Niagara
Mohawk Power Corporation
~> ~UN 1SSg
Enclosure:
NRC Region I Inspection
Report"No.
50-220/90-80
cc w/encl:
C.
Mangan,
Senior Vice President
W. Hansen,
Manager,
Corporate Quality Assurance
M. Colomb, Unit 2 Superintendent,
Operations
'.
Beckham,
Manager,
Nuclear Quality Assurance
Operations
R. Abbott, Unit 2 Station Superintendent
J. Perry,
Vice President,
Quality Assurance
K. Dahlberg, Unit I Station Superintendent
R. Randall, Unit I Superintendent,
Operations
J. Willis, General
Station Superintendent
C. Terry, Vice President,
Nuclear Engineering
and Licensing
M. Peifer,
Manager,
Nuclear Services
C. Stuart,
Manager,
Nuclear Projects
J.
Warden,
New York Consumer Protection
Branch
T. Conner, Jr.,
Esquire
G. Wilson, Senior Attorney
J.
Keib, Esquire
.
Director,
Power Division, Department of Public Service,
State of New York
State of New York, Department of Law
Public Document
Room
(PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
State of New York,
SLO Designee
bcc w/encl:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encl)
T. Martin,
R. Burnett,
'W. Hodges,
W. Kane,
M. Knapp,
DRSS
J. Wiggins,
J. Linville, DRP
D. Vito,
G. Meyer,
'. Abraham,
PAO (2)
M. Taylor,
R. Bellamy,
DRSS
J. Caldwell,
R. Martin,
OFFICIAL RECORD
COPY
9 MILE RATI - 0002.0.0
05/30/90
e
0
0'
Niagara
Mohawk Power Corporation
~~ JUN 78gP
~/~~ i/e~
RI: DRP
GMeyer/meed
5/$ 1 /90
,ii
R
(DRP
JLinvi 1 1 e
4'K+ae
5/I"/90
5/ ~/90
OFFICIAL RECORD
COPY 9 MILE RATI 0003.0.0
05/30/90
5